S160074Attachments.pdf

PDF 2 MB Posted

Attached to
Smith Creek Channel Structure and Fish Barrier Project Federal contract opportunity
Solicitation number
AG-0343-S-16-0074
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Solicitation attachments

View the file

Other files for this federal contract opportunity

Other files attached to Smith Creek Channel Structure and Fish Barrier Project, newest first.
File Type Posted
Amendment_0001.pdf PDF
RevisedSmith_CR_Fish_Barrier_Plans.pdf PDF
S160074CompleteSolicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0343-S-16-0074

Smith Creek Channel Structure and Fish Barrier Project/Flathead NF Attachments, Page 1 of 70

ATTACHMENTS

Wage Rate Requirements (Construction) Statute: If this is a contract in excess of $2,000, the Wage Rate Requirements (Construction) statute requires the Contractor to pay certain minimum wages and benefits to employees working under this contract. These required minimum wages are stated in the attached Wage Decision. Pursuant to Executive Order 13658, the minimum hourly wage rate required to be paid to workers performing on, or in connection with, contracts and subcontracts subject to FAR Subpart 22.19, is at least $10.15 per hour beginning January 1, 2016 , and annually thereafter, an amount determined by the Secretary of Labor. See FAR Subpart 22.19.

The following attachments are a part of this solicitation and any resulting contract (see separate document(s)).

J- 1 Wage Rate Decision No. MT160068, Mod. 3, dated 07/22/2016, 6 pages.

NOTE: THIS PROJECT IS LOCATED IN ZONE 3.

J- 2 Forest Service Supplemental Specifications, 55 pages

Preface 101 – Terms, Format, and Definitions 102 – Bid, Award, and Execution of Contract 103 – Scope of Work 104 – Control of Work 105 – Control of Material 106 – Acceptance of Work 107 – Legal Relations and Responsibility to the Public 108 – Prosecution and Progress 109 – Measurement and Payment 151 – Mobilization 153 – Contractor Quality Control 154 – Contractor Sampling and Testing 155 – Schedules for Construction Contracts 156 – Public Traffic 157 – Soil Erosion Control 201 – Clearing and Grubbing 203 – Removal of Structures and Obstructions 204 – Excavation and Embankment 208 – Structure Excavation and Backfill for Selected Major Structures 251 – Riprap 308 – Minor Crushed Aggregate 552 – Structural Concrete 553A – Precast Concrete Structures 622 – Rental Equipment 625 – Turf Establishment 713 – Roadside Improvement Material 725 – Miscellaneous Material

Attachments, Page 2 of 70

J- 3 Drawings (see separate document)

Title Sheet – Vicinity Map Sheet 1 General Notes Sheet 2 Details – Profile Section Sheets 3 – 5 Details – Cross Section of Members Sheets 6 – 8 Precast Option Details, Sheet 9 Plan View and Layout Table Sheet 10

J- 4 Exhibits

Food Storage Special Order LC_10_D1_01, 7 pages

Attachments, Page 3 of 70

Wage Rate Decision No. MT160068, Mod. 3, dated 07/22/2016

General Decision Number: MT160068 07/22/2016 MT68

Superseded General Decision Number: MT20150068

State: Montana

Construction Type: Heavy

County: Missoula County in Montana.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 03/18/2016 2 07/08/2016 3 07/22/2016

BOIL0011-003 10/01/2013

Rates Fringes

BOILERMAKER...................... $ 33.67 23.85

CARP0028-011 06/01/2015

Rates Fringes

CARPENTER (Including Formwork)... $ 28.00 11.57

Zone Definition:

The hourly rate applicable to each project is determined by measuring the road miles over the shortest practical route from the County Courthouse of the following towns to the center of the

Attachments, Page 4 of 70 job: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Lewiston, Miles City, and Missoula.

Zone 1: 0 to 30 miles - Base Rate Zone 2: 31 to 60 miles - $3.70 Zone 3: over 60 miles - $5.60

ELEC0768-009 06/01/2015

Rates Fringes

ELECTRICIAN...................... $ 28.53 12.57

ENGI0400-006 05/01/2013

Rates Fringes

POWER EQUIPMENT OPERATOR:

(Zone 1)

(1) A-frame truck Crane, Forklift, oiler (except crane)...................... $ 23.47 10.40

(2) Excavator, Crane Oiler $ 23.94 10.40

(3) Mechanic, Scraper....... $ 24.34 10.40

(4) Cranes 25-44 tons....... $ 27.00 11.40

(5) Cranes 45-74 tons....... $ 28.00 11.40

(6) Cranes 75 to 144 tons, whirley cranes.............. $ 29.00 11.40

(7) Cranes, 150 tons to including 250 tons (add $1.00 for every 100 tons over 250 tons); Crane, Stiff-Leg or Derrick; Helicopter Hoist; Crane, Tower (all)... $ 30.00 11.40

ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:

The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the following listed towns to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA

Attachments, Page 5 of 70

Zone 1: 0 to 30 miles - Base Pay Zone 2: 30 to 60 miles - Base Pay + $3.50 Zone 3: Over 60 miles - Base Pay + $5.50

* IRON0014-015 07/01/2016

Rates Fringes

IRONWORKER: Reinforcing and Structural....................... $ 37.21 22.96

PLUM0459-010 05/01/2016

Rates Fringes

PLUMBER.......................... $ 28.28 14.43

* TEAM0190-001 05/01/2015

Rates Fringes

TRUCK DRIVER

(2) Water Truck

ZONE A..................... $ 27.73 8.22

ZONE B (30-60 miles from County Courthouse of listed cities*): Add $3.05 per hour to ZONE A rates

ZONE C (over 60 miles from County Courthouse of listed cities*): Add $4.85 per hour to ZONE A rates.

*Zone pay will be calculated from the city center of the following listed cities:

BILLINGS

BOZEMAN

BUTTE

GREAT FALLS

HELENA

KALISPELL

MISSOULA

Attachments, Page 6 of 70

SUMT2011-043 02/07/2011

Rates Fringes

LABORER: Common or General...... $ 16.91 9.08

OPERATOR: Asphalt Roller........ $ 22.39 3.96

OPERATOR: Backhoe............... $ 22.12 8.37

OPERATOR: Bobcat/Skid

Steer/Skid Loader................ $ 25.67 8.05

OPERATOR: Loader (Front End).... $ 22.67 6.54

PAINTER: Brush and Spray........ $ 25.00 0.00

TRUCK DRIVER: Dump Truck........ $ 19.38 4.74

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Attachments, Page 7 of 70

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.

Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response

Attachments, Page 8 of 70 from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Attachments, Page 9 of 70

FOREST SERVICE

SUPPLEMENTAL SPECIFICATIONS

For

Smith Creek Channel Structure and Fish Barrier

U.S.D.A. FOREST SERVICE

FLATHEAD NATIONAL FOREST

SWAN LAKE RANGER DISTRICT

JUNE 2016

Attachments, Page 10 of 70

INDEX TO SPECIFICATIONS

PREFACE 11

SECTION 101 through 103 - TERMS, BID, SCOPE OF WORK 12-16

SECTION 104 - CONTROL OF WORK 17

SECTION 105 - CONTROL OF MATERIAL 18

SECTION 106 through 108 - ACCEPTANCE, LEGAL, PROGRESS 19-22

SECTION 109 - MEASUREMENT AND PAYMENT 23-24

SECTION 151 – MOBILIZATION 25

SECTION 153- CONTRACTOR QUALITY CONTROL 26-28

SECTION 154 – CONTRACTOR SAMPLING AND TESTING 29

SECTION 155 – SCHEDULES FOR CONSTRUCTION CONTRACTS 30

SECTION 156 – PUBLIC TRAFFIC 31

SECTION 157– SOIL EROSION CONTROL 32-36

SECTION 201 - CLEARING AND GRUBBING 37-38

SECTION 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS 39

SECTION 204 – EXCAVATION AND EMBANKMENT 40

SECTION 208 – STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED

MAJOR STRUCTURES 41-42

SECTION 251 - RIPRAP 43-44

SECTION 308 – MINOR CRUSHED AGGREGATE 45

SECTION 552 – STRUCTURAL CONCRETE 46-53

SECTION 553A - PRECAST CONCRETE STRUCTURES 43-56

SECTION 622 – EQUIPMENT RENTAL 57

SECTION 625 – TURF ESTABLISHMENT 58-59

SECTION 713 – ROADSIDE IMPROVEMENT MATERIAL 60

SECTION 725 - MISCELLANEOUS MATERIAL 61-63

Attachments, Page 11 of 70

Preface

Delete all but the first paragraph and add the following:

The Forest Service, U.S. Department of Agriculture, has adopted FP-03 for construction of National Forest System Roads and structures.

Attachments, Page 12 of 70

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_02_17_2005

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).

101.03_nat_us_02_17_2005

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_02_22_2005

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private http://www.nist.gov/

Attachments, Page 13 of 70 lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Attachments, Page 14 of 70

Figure 101-1—Illustration of road structure terms.

R ig ht of

W ay

R oa ds id e R oa ds id e

C le ar in g W id th

R oa dw ay

C le ar in g Li m it

X Y

G ro un d

Li ne

Tr av el ed

W ay C L

B er m S ur fa ce C ou rs e B as e

C ou rs e

Fi ll

S lo pe

B ac k S lo pe

D ra in ag e D itc h

G ro un d

Li ne

S ub gr ad e

R oa d B ed

S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns

S ee d ra w in gs fo r t yp ic al s ec tio ns

X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay

N ot e:

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

Attachments, Page 15 of 70

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

Delete Section 102 in its entirety.

Attachments, Page 16 of 70

103 - Scope of Work

103.01 Intent of Contract. Delete this subsection and replace with the following:

The Smith Creek Channel Structure and Fish Barrier Project requires construction of a concrete weir fish barrier structure and earth embankment dam structure. Work will include: clearing and grubbing trees and brush in a forest environment; excavating streambed materials; cast-in-place concrete (or alternatively precast concrete); loading and hauling earthen materials from a gravel pit, placing, and compacting earth embankment; furnishing, hauling, and placing rip rap;

dewatering; and seeding and mulching.

The structure is accessible via Forest Roads numbered NFSR 901, NFSR 9550 and NFSR 90398.

Forest Road 901 begins at approximately mile post 42 on Montana State Highway 83, 45 miles from Bigfork, Montana. NFSR’s 90397 and 90398 are year round closed roads. To access Smith Creek project site from the South side beginning at the Junction Hwy 83 and NFSR 901 travel North 1.4 miles and turn left for 0.8 miles to the junction with NFSR 90398 the project site is 0.5 miles north. The berms on road 90398 will need to be replaced after the project is complete.

Delete the remaining subsections in this Section.

Attachments, Page 17 of 70

104 - Control of Work 104.01_nat_05_11_2004

Delete Subsections 104.01, 104.02, and 104.04.

104.05_nat_05_17_2004

104.05 Load Restrictions.

Add the following:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Attachments, Page 18 of 70

105 - Control of Material 105.02_nat_05_11_2004

105.02 Material Sources.

Add the following before the first paragraph.

Sources have been designated for this project as follows:

Riprap Source – Commercial Source – There is no designated Government source for Riprap.

Crushed Aggregate Surfacing Source – Commercial Source – There is no designated Government source for crushed aggregate surfacing.

Unclassified Borrow – Government Source- The designated source for unclassified borrow is from the Owl Creek Pit located along Forest Service Road 9558 at NW SW Section 1, Township 19N, Range 16W.

Structural Backfill – Government Source- When material meeting the gradation requirements for backfill cannot be conserved from structure excavation, the designated source for structural backfill is from the Owl Creek Pit located along Forest Service Road 9558 at NW SW Section 1, Township 19N, Range 16W.

Waste Site – Government Furnished – A designated waste site for unsuitable material will be identified with ½ mile of the project site along the road by the Contracting Officer.

Under (b) Contractor-located sources, add the following:

Prior to any pit development or use of materials, the pit site shall be approved by the CO that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.

Attachments, Page 19 of 70

106 - Acceptance of Work

106.07_nat_us_05_11_2004

Delete Subsection 106.07.

Attachments, Page 20 of 70

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.09_nat_us_05_11_2004

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_02_23_2005

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

Attachments, Page 21 of 70

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

Attachments, Page 22 of 70

108 - Prosecution and Progress 108.00_nat_05_11_2004

Delete Section 108 in its entirety.

Attachments, Page 23 of 70

109 - Measurement and Payment 109.02_nat_05_11_2004

109.01 Measurement of Work

Add the following:

Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

109.02 Measurement Terms and Definitions.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

(q) 50lb: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

(r) 94lb: Measurement will be for the actual number of 94lb bags of standard cement or grout.

109.03_nat_05_11_2004

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

Add the following subsections:

109.10 Methods of Measurement.

One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:

(a) Contract Quantities (CQ). These quantities to be paid are the quantities shown in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other

Attachments, Page 24 of 70 evidence indicating why the quantity is in error and request, in writing, that the quantity be adjusted. Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

(b) Stake Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

109.11 Determination of Quantities.

(a) The following measurements and calculations shall be used to determine contract quantities for payment.

(1) For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

(2) For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

(3) For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

(4) For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

(5) For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

(6) For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

Attachments, Page 25 of 70

151 - Mobilization 151.01_0105_us_02_23_2005

151.01 Description

Add the following:

Mobilization is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

Add the following at the end of the last sentence:

Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.

Attachments, Page 26 of 70

153 – Contractor Quality Control

153.01 Description

Add the following:

Work performed under this section shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements.

The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the contract documents.

2. Testing agency will re-test and re-inspect corrected work.

Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

153.02 Contractor Quality Control Plan.

At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. The Government reserves the right to require changes in the plan during the contract period as necessary.

2. No change in the approved plan may be made without written concurrence by the Contracting Officer.

3. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

4. At a minimum, the plan shall include the following:

• A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

Attachments, Page 27 of 70

• A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

• Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

• Methods of performing, documenting, and enforcing quality control of all work.

• Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

153.03 Testing.

Submit three copies of complete test results no later than 3-calendar days after the test was performed.

Submit failing test results and proposed remedial actions within 4 hours of noted deficiency.

Testing and Inspection Reports shall include the following:

a. Date of issue.

b. Project title and number.

c. Name, address, and telephone number of testing agency.

d. Dates and locations of samples, tests, or inspections.

e. Names of individuals performing tests and inspections.

f. Reference Specification Section(s).

g. Complete test or inspection data.

h. Test and inspection results and an interpretation of test results.

i. Ambient conditions at time sample was taken, tested, or inspected.

j. Comments or professional opinion on whether tested or inspected work complies with the

Contract Document requirements.

k. Name and signature of laboratory inspector.

l. Recommendations on retesting and reinspecting.

153.04 Records.

For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

Attachments, Page 28 of 70

Add the following subsection:

153.07 Project Submittals.

At a minimum the Contractor shall provide project submittals as shown on the below Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

Submittal Log

Log No.

Incidental to

Pay Item(s) Description of Submittal Type of Submittal

Requirement found in

Specification No.

/Drawings

Additional Specification References

1 151 Hazardous Spill Plan Plan FSSS 107.10

2 151 Contractor Quality Control Plan Plan 153.02 552.09

3 151 Traffic Control Plan Plan FSSS 156.03

4 157 Dewatering and Soil Erosion and Pollution Control Plan Plan FSSS 157.03

5 204 Material Moisture/Density Testing Test Results Table 204-1 106

6 204 Embankment Compaction Testing Test Results 204.11 106 7 208 Material Moisture/Density Testing Test Results Table 208-1 106

8 208 Structure Backfill Compaction Testing Test Results 208.11, 208.12 106

9 208 Excavation Plan Plan FSSS 208.01

10 251 Riprap Material Certification 251.07 106, 705, Drawings

11 308 Aggregate Gradation Material Certification 308.06 703.05, Drawings

12 552 Structural Concrete: Mix Design Mix Design 552.03 553,553A, Drawings

13 552, 553A Reinforcing Steel and Wire Rope Material Certification 709.01 552, 553A, Drawings

14 553A Miscellaneous Material: Grout Material Certification FSSS 725.40 553, Drawings

15 553A Welder Certification Copy of Certification Sheet 2 of Plans 555.18

16 553A Precast Concrete Structures Shop Drawing FSSS 553A.03 104, 552, 553, 17 553A Precast Concrete Structures:

PCI/NPCA Certification

Fabrication Certification FSSS 553A.02

18 553A Precast Concrete Structures: Testing Test Results FSSS 553A.06 106, 554, 562

19 552, 553A Reinforcing Steel Order List 554.03 552, 553A, 709, Drawings

20 622 Equipment Rental Equipment Approval FSSS 622.02

21 625 Fertilizer, Seed Mix, & Mulch Material Certification 625.10 106, FSSS 625, 713

Attachments, Page 29 of 70

Section 154 - Contractor Sampling and Testing

Description

154.01 Delete this subsection and replace with the following:

This work consists of obtaining samples for testing, testing and reporting required test results. It does not include Contractor quality control testing required under Section 153. However, include the work required under this Section in the Section 153 quality control plan.

Construction Requirements

154.03 Testing. Delete this subsection and replace with the following:

The Contractor is responsible to perform all tests required by the Sampling and Testing Requirement tables at the end of the following sections in accordance with the approved Quality Control plan:

SECTION 553A – Precast Concrete Structures

For precast walls and wingwalls in accordance with 553A.02

Measurement

154.06 Delete this subsection and replace with the following:

Do not measure Contractor Sampling and Testing for Payment.

Payment

154.07 Delete this subsection and replace with the following:

Do not measure Contractor Sampling and Testing for Payment.

Attachments, Page 30 of 70

155 - Schedules for Construction Contracts

Delete Section 155 in its entirety.

Attachments, Page 31 of 70

156 - Public Traffic 156.03_nat_11_05_2004

156.03 Accommodating Traffic During Work.

Delete the first paragraph and replace with the following:

Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635.

Submit a traffic control plan for acceptance at least 14 days before intended use.

Delete the following from the last paragraph:

…..according to Subsection 106.07(b)

Develop a construction sign plan identifying the type and location of all advanced warning signs necessary to safely restrict or pass public traffic. Install construction signs conforming to the Manual on Uniform Traffic Control Devices (MUTCD) prior to proceeding with any construction work. Furnish, maintain and remove all barricades and signs required for construction signing and hauling.

156.04 Maintaining Roadways During Work.

(a) Add the following:

The construction of detour roads for this project is not allowed.

156.08 Traffic and Safety Supervisor.

Delete this Subsection in its entirety.

Attachments, Page 32 of 70

157 - Soil Erosion Control 157.02_01_08_23_2004

157.02 Materials

Provide bales, wattles, logs and rolls from a certified noxious weed free source.

SILT FENCE

Prior to construction, install silt fence along the downhill construction limits to prevent silt intrusion upon adjacent land.

A. Silt fences are appropriate for the following general locations:

1. Immediately upstream of the point(s) of runoff discharge from a site before flow becomes concentrated. Below disturbed areas where runoff may occur in the form of overland flow.

2. Along the down slope toe of all top soil stock piles.

B. Properties.

1. Use pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:

• Physical Properties

(Min.)

Requirement Test Method

• Grab Tensile, lbs. W120/F100 ASTM-D-4632

• Grab Elongation, % 15 ASTM-D-4632

• Mullen Burst, psi 275 ASTM-D-3786

• Puncture, lbs. 65 ASTM-D-4833

• Trapezoidal Tear, lbs. 50 ASTM-D-4533

• UV Resistance, % 80 ASTM-D-4355

• AOS, US Sieve # 30/40 ASTM-D-4751

• Permittivity gal/min-sq. ft. 90 ASTM-D-4491

2. Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.

3. Utilize standard strength synthetic filter fabric for sediment barriers. The filter fabric shall be purchased in a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum 6 inch overlap, and securely sealed.

4. The standard strength filter fabric shall be stapled or wired to the fence and 6 inches of the fabric shall be extended into the ground. Filter fabric shall not be stapled to existing trees.

Attachments, Page 33 of 70

5. Support posts shall be spaced at a maximum 6 feet and driven securely into the ground a minimum of 24 inches.

6. Filter fabric shall be buried a minimum of 12 inches.

7. The height of a silt fence shall not exceed 36 inches. Higher fences may impound volumes of water sufficient to cause failure of the structure.

C. Maintenance.

1. Silt fences and filter barriers shall be inspected immediately after each rainfall and at least daily during prolonged rainfall.

2. Silt fences shall be inspected for depth of sediment, tears, and to see if the fabric is securely attached to the fence posts, and to see that the fence posts are firmly in the ground. Any deficiencies shall be repaired immediately.

3. Should the fabric on a silt fence of filter barrier decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly.

4. Sediment deposits should be removed after each storm event and/or when deposits reach approximately 1/3 the height of the barrier or when the sediments limit or prevent the flow of water through the fabric hydraulic.

5. Any sediment deposits remaining in place after the silt fence or filter barrier is no longer required shall be dressed to conform with the existing grade, prepared, and seeded.

Support Posts: 4 foot - 2 x 2 wood.

STRAW BALE EROSION CONTROL FENCE

Install straw bales at local drainage ways to prevent silt intrusion upon drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes. Use dry oat or wheat straw, free from weeds, viable weed seeds, and foreign matter.

A. Grass hay bales are not acceptable.

1. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.

B. Straw bale erosion control fences are appropriate for the following general locations:

1. Sheet flow applications: Straw bales shall be placed in a single row, lengthwise on the contour with ends of adjacent bales tightly abutting one another.

2. Channel flow applications: Straw bales shall be placed in a single row, lengthwise and oriented perpendicular to the direction of flow with ends of adjacent bales tightly abutting one another. The barrier shall be extended to such a length that the bottoms of the end bales are higher in elevation than the top of the lowest middle bale to assure that sediment laden runoff will flow either through or over the barrier but not around it.

Attachments, Page 34 of 70

C. The barrier shall be entrenched and backfilled. A trench shall be excavated the width of a bale and the length of the proposed barrier to a minimum depth of 4 inches. After the bales are staked and chinked, the excavated soil shall be backfilled against the barrier. Backfill shall conform to the ground level of the downhill side and shall be built up to 4 inches against the uphill side of the barrier.

D. Each bale shall be securely anchored by at least 2 stakes or rebar driven through the bale.

The first stake in each bale shall be driven toward the previously laid bale to force the bales together. Stakes or rebar shall be driven a minimum of 12 inches into the ground or deep enough into the ground to securely anchor the bales, whichever is greater.

E. The gaps between bales shall be chinked (filled by wedging with straw to prevent water from escaping between the bales). Loose straw scattered over the area immediately uphill from a straw bale barrier tends to increase barrier efficiency.

STRAW WATTLE OR ROLL

A. Straw wattles shall be installed in accordance to manufacturer’s installation guidelines.

B. At a minimum:

1. Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:

Diameter 9 inches min.

Netting strand thickness 0.030 inches Netting knot thickness 0.055 inches Mass of netting 0.315 to 0.385 ounces per foot

2. The wattle shall be entrenched and backfilled. A trench shall be excavated the width of the straw waddle and the length of the proposed barrier to a depth of 2-3 inches.

3. Each wattle shall be securely anchored by at least one 18-24 inch stake every 3-4 feet and with a stake on each end. Stakes shall be driven perpendicular to slope face through the middle of the wattle until 2-3 inches remains exposed above the waddle.

4. After the wattles are staked, compact excavated soil against the uphill side of the barrier.

5. Adjacent wattles should tightly abut.

C. Maintenance inspections shall be frequent and repair or replacement shall be made promptly as needed. Straw bale carriers shall be removed when they have served their usefulness, but not before the upslope areas have been permanently stabilized.

Attachments, Page 35 of 70

157.03_0510_11_10_2004

157.03 General.

Delete the first two paragraphs and add the following:

This work includes submitting an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction according to the contract specifications, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the Contracting Officer for approval.

The erosion control plan reflects special concerns and measures necessary to protect resources and government improvements. The Erosion Control Plan shall, at a minimum:

1. Describe the construction activities and sequence of implementation relating to specific erosion control measures.

2. Describe the location and type of permanent controls to be implemented during construction.

3. Describe the location and type of temporary controls to be implemented during construction.

4. For work in stream channels with flowing water include a detailed dewatering plan.

5. Include procedures and temporary control measures to be implemented to minimize sediment delivery during re-watering of any new culvert with streambed simulation material.

6. For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

7. Describe what monitoring will take place.”

Add to the third paragraph:

Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property.

157.04 Controls and Limitations on Work.

Add the following to the second paragraph:

Temporary erosion control measures will be in place at the end of each day’s operation if greater than 30 percent chance of rainfall is predicated. Earthwork operations may be temporarily suspended if significant rainfall is forecasted.

Attachments, Page 36 of 70

157.08 Water Crossings.

Any site where there is running water through a channel crossing shall be dewatered by rerouting the flow around the site before and during excavation and embankment operations that has the potential for sediment delivery to the live stream.

Attachments, Page 37 of 70

201 – Clearing and Grubbing

201.01 Description

Add the following:

This work shall consist of clearing, grubbing, trimming, removing, and disposing of or treatment of timber, construction slash, and debris. This work shall also include preservation of vegetation and objects designated to remain from injury or defacement.

Construction Requirements

201.06 Disposal.

Delete this subsection and substitute the following:

Utilization of Timber

A. Merchantable timber is timber that meets Utilization Standards. Utilization Standards shall be trees larger than 8 inches in diameter measured 12 inches above grade.

B. Utilization and Removal of Timber: Trees that meet “Merchantable Timber” standards shall be treated as follows:

1. Logs meeting utilization standards shall be limbed and decked at locations shown on the Drawings or approved by the Contracting Officer. Decking shall be done in such a manner that logs are piled parallel one to the other, can reasonably be removed by standard log loading equipment, will not damage standing trees, and will not roll.

Decks shall be free of brush and soil. Title to all such timber cut from National Forest land shall remain with the Forest Service, U.S. Department of Agriculture, in accordance with its regular procedures, unless otherwise specified.

Slash Treatment

A. Treatment of construction slash larger than 3 inches in diameter and 3 feet in length shall be accomplished by one or more of the following methods:

1. Scattering: Construction slash shall be salvaged and scattered on all disturbed areas excluding the structural backfill limits. All logs shall be limbed and placed away from trees, positioned so they will not roll, and not be placed on top of one another. Stumps shall be removed and disposed of off site. Other construction slash shall be limbed and scattered to reduce slash concentrations.

B. No construction slash shall be deposited in lakes, meadows, streams, or streambeds.

Construction slash that interferes with drainage structures shall be removed immediately.

Attachments, Page 38 of 70

201.08 Delete this subsection and replace with the following:

Do not measure clearing and grubbing for payment.

Attachments, Page 39 of 70

203 - Removal of Structures and Obstructions 203.01_nat_05_12_2004

203.05 Disposing of Material.

(a) Remove from project Add the following:

All materials designated for removal become the property of the Contractor and are to be disposed of by removing off of Forest Service Lands in accordance with all local, state and federal requirements.

203.05 Disposing of Material.

(b) Burn. Delete this subsection.

(c) Bury. Delete this subsection.

Attachments, Page 40 of 70

204 - Excavation and Embankment

204.11 Compaction.

Delete this subsection and substitute the following:

Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory plate compactors or rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.

(1) Four passes of a vibratory plate compactor having a minimum dynamic force of 10,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

(2) Eight roller passes of a 2-ton compression-type roller having a minimum dynamic force of 10,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

(3) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

204.13 Sloping, Shaping, and Finishing.

Delete paragraph (d) and add the following:

(d) Finishing. For all excavation and embankment remove all material larger than 6 inches from the top 6 inches of the work. Finish excavation and embankment surfaces to a smooth and uniform condition, and shaped to conform to the typical sections. Remove unsuitable material and replace it with suitable material.

Ensure that the subgrade for both excavations and embankments are visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material.

Maintain proper drainage.

204.14_nat_05_12_2004

204.14 Disposal of Unsuitable or Excess Material.

Delete the text of the first paragraph and substitute the following:

Dispose of unsuitable or excess material at designated sites. Place unsuitable or excess material in low spots/ holes at the waste site and shape material to a uniform surface and slope to drain.

Seed and mulch new waste material after shaping.

204.16 (e) Waste. Delete this paragraph.

Attachments, Page 41 of 70

208 - Structure Excavation and Backfill for Selected Major Structures

208.01 Delete this subsection and replace with the following:

This work consists of excavating material for the construction of the structure and for dewatering channels. This work includes preserving channels, shoring and bracing, constructing cofferdams, sealing foundations, dewatering, excavating, hauling and spreading excess excavated material, preparing foundations, backfilling, constructing the excavations and subsequent removal of safety features and cofferdams.

208.04 General. Add the following:

Backfill and Fills

Excavation is unclassified as to materials and shall include all materials which are encountered in the required excavation. Use the excavated material as specified below:

Remove ice or frozen earth, muck, perishable debris, and earth with high void…