JasperMtConstructionRFP.docx

DOCX document 224 KB Posted

Attached to
Idaho Panhandle NFs - Jasper Mountain Road Reconstruction Federal contract opportunity
Solicitation number
AG-02RC-S-17-0161
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Solicitation, 71 pages

View the file

Other files for this federal contract opportunity

Other files attached to Idaho Panhandle NFs - Jasper Mountain Road Reconstruction, newest first.
File Type Posted
Amend1ExtendOfferResponseDeadline.doc DOC document
AttachmentJ7_AD3031.pdf PDF
AttachmentJ3_DrawingsSheets10_19.pdf PDF
AttachmentJ4FoodStorageRequirementAreaMap0001.pdf PDF
AttachmentJ2_JasperMtn_FP03_FSSS_Vers2.2.docx DOCX document
AttachmentJ6_AD3030.pdf PDF
AttachmentJ3_DrawingsSheets_1_9.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RFP thru FAC 2005-94B and 95B – 1/19/2017AG-02RC-S-17-0161
Jasper Mtn Road Reconstruction
Page 3 of 75
CONSTRUCTION RFP thru FAC 2005-94B and 95B – 1/19/2017AG-02RC-S-17-0161
Jasper Mtn Road Reconstruction
Page 22 of 71

OFFEROR'S COPY

NOTE: Attached forms must be completed and submitted intact.

Issuing Office:

USDA – Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530

Offers Are Solicited For:

JASPER MOUNTAIN ROAD RECONSTRUCTION

Idaho Panhandle National Forests Priest Lake Ranger District Bonner County, Idaho

Solicitation No. RFP AG-02RC-S-17-0161
HELP PREVENT FOREST FIRES

IMPORTANT - NOTICE TO OFFEROR

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.

2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)

FS-6300-45 (11/79)

CONSTRUCTION RFP thru FAC 2005-94B and 95B – 1/19/2017AG-02RC-S-17-0161
Jasper Mountain Road Reconstruction

TABLE OF CONTENTS

PART I - THE SCHEDULE

Page(s)
SECTION A - SOLICITATION/CONTRACT FORM1 - 2

SECTION B - SUPPLIES OR SERVICES AND PRICES 3 - 4

B- 1 - Schedule of Items
B- 2 – Price Proposal Instructions
B- 3 - Bond Premiums
B- 4 – Offer Submittal
B- 5 – Additional Classification Required – Davis Bacon General Wage Decision ID170040
B- 6 – Idaho Use Tax

SECTION C - DESCRIPTION/SPECIFICATIONS 5 - 9

C- 1 – Project Description and Location
C- 2 – Standard Specifications
C- 3 - Supplemental Project Specifications
C- 4 – Drawings
C- 5 – Statement of Work/Specfications
C- 6 - Biobased Product Utilization

SECTION E - INSPECTION AND ACCEPTANCE 10 - 11

E- 1 – Clauses Incorporated by Reference
E- 2 – Inspection of Construction

SECTION F - DELIVERIES OR PERFORMANCE 12

F- 1 – Clauses Incorporated by Reference
F- 2 - Commencement, Prosecution, and Completion of Work Alternate I

SECTION G – CONTRACT ADMINISTRATION DATA 13

G- 1 – Contracting Officer’s Representative

SECTION H - SPECIAL CONTRACT REQUIREMENTS 14 - 21

H- 1 - Conditions on Use of Premises (Camping)
H- 2 – Key Personnel
H- 3 - Barricades, Warning Signs, and Other Devices
H- 4 - Fire Control
H- 5 – Petroleum Products
H- 6 – Reference FAR 52.236-13 – Accident Prevention
H- 7 – Loss, Damage and Destruction
H- 8 – Equipment Rental
H- 9 - Incidental Payment Items
H- 10 - Conformity with Drawings and Specifications
H- 11 - Local Material Sources
H- 12 - Samples, Tests, Cited Specifications

H- 13 - Invoice Processing Platform (IPP) H- 14 - Idaho Worker’s Compensation Law

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES 22 - 37

I- 1 - Clauses Incorporated by Reference
I-2 - Paid Sick Leave Under Executive Order 13706
I-3 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts
I-4 - Buy American - Construction Materials
I-5 - Bid Guarantee
I-6 - Performance and Payment Bonds - Construction
I-7 - Alternative Forms of Security
I-8 - Federal, State, and Local Taxes
I-9 – Reimbursement for Bond Premiums – Fixed-Price Construction Contracts
I-10 - Permits and Responsibilities
I-11 - Alterations In Contract
I-12 - Order of Precedence - Construction

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 38 - 56

J- 1 - Wage Determination
J- 2 – Forest Service Supplemental Specifications
J- 3 – Construction Drawings
J- 4 - Food/Wildlife Attractant Storage Special Order F11-002
J- 5 - State of Idaho Certificate of Verification of Workers’ Compensation Insurance
J- 6 – AD-3030
J- 7 – AD-3031

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER57 - 61
STATEMENTS OF OFFERORS AND RESPONDENTS

K- 1 - Annual Representations and Certifications K- 2 - Incorporation by Reference of Representations and Certifications K- 3 – Corporate Tax Delinquency/Felony Conviction Representation

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS62 - 68
AND RESPONDENTS
L- 1 - Solicitation Provisions Incorporated by Reference
L- 2 - System for Award Management
L- 3 - Inquiries

L- 4 - Facsimile Proposals and E-Mail Proposals

L- 5 - Instructions for the Preparation of Technical and Business Proposals
L- 6 - Amendments to Proposals
L- 7 - Type of Contract
L- 8 - Construction Wage Rate Requirements—Secondary Site of the Work
L-9 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity

for Construction

L-10 - Notice of Buy American Requirements - Construction Materials
L-11 - Service of Protest
L-12 - Site Visit (Construction)
L-13 - Preparation of Proposals – Construction

SECTION M - EVALUATION FACTORS FOR AWARD 69- 71

M- 1 - Evaluation Criteria
CONSTRUCTION RFP thru FAC 2005-94B and 95B –1/19/2017AG-02RC-S-17-0161
Jasper Mountain Road Reconstruction

M- 2 - Award Statement

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

RFP AG-02RC-S-17-0161

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|_| NEGOTIATED (RFP)

3. DATE ISSUED

8/12/2017

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

859973

6. PROJECT NO.

7. ISSUED BYCODE
8. ADDRESS OFFER TO

USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530

USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530

9. FOR INFORMATION
CALL:
a. NAME

KAREN RUKLIC

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(208) 983-5144 or email kruklic@fs.fed.us

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

JASPER MOUNTAIN ROAD RECONSTRUCTION

Priest Lake Ranger District Idaho Panhandle National Forests Bonner County, Idaho

Price Range: The Government’s estimate is between $100,000 and $250,000.

**FAXED OFFERS ARE NOT ACCEPTABLE. ORIGINAL BID BONDS ARE REQUIRED. OFFERS MUST BE MAILED OR HAND-CARRIED AND RECEIVED BY MONDAY, SEPTEMBER 11, 2017 AT 4:00 PM LOCAL TIME.

11. The Contract time shall begin upon receipt of contract |_| notice to proceed and shall be completed no later than September 30, 2018. This performance period is |_| mandatory, |_| negotiable. (See Section F, Clause 52.211-10, Alt I)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12b.)

|_| YES|_| NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a.Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:00 pm local time Monday, September 11, 2017. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b.An offer guarantee|_| is,|_| is not required. (See Section I, FAR 52.228-1.)
c.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.Offers providing less than 45 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-32121442-101STANDARD FORM 1442 (REV. 4-85)
Computer GeneratedPrescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

Duns No. _________________

CAGE Code (see FAR Provision 52.204-16) ____________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

PLEASE COMPLETE THIS BLOCK.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )
26. ADMINISTERED BYCODE
27. PAYMENT WILL BE MADE BY

USDA – Forest Service Idaho Montana Acquisition Team Grangeville Office - 104 Airport Road Grangeville, Idaho 83530

All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

KAREN RUKLIC

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

Computer Generat ed STANDARD FORM 1442 BACK (REV. 4-85)

SECTION B - SUPPLIES OR SERVICES AND PRICES

JASPER MTN ROAD RECONSTRUCTION

Priest Lake Ranger District Idaho Panhandle National Forests Bonner County, Idaho

B- 1 Schedule of Items

ITEM #

DESCRIPTION

METHOD OF MEASURE

PAY UNIT

EST QTY
UNIT PRICE
TOTAL PRICE
1
15101 - Mobilization
LSQ
LS
1.00
2
15706 - Temporary culvert pipe
AQ
LF
310.00
3
20301.A - Removal of Existing Gate
AQ
Each
2.00
4
20301.B - Removal of Existing Culvert
AQ
Each
8.00
5
20402 - Roadway excavation, Compaction Method D, Finishing Method A
CQ
Mile
1.47
6
20404 - Unclassified borrow, Compaction Method D, Finishing Method C (Government Source)
CQ
CY
120.00
7
20419. OD - Drainage excavation, type outlet ditch
CQ
LF
140.00
8
20426.AD - Grade Dips, Armored
AQ
Each
2.00
9
20426.ND - Grade Dips, Non-Armored
AQ
Each
9.00
10
20701 - Earthwork geotextile, type IIA
AQ
SY
20.00
11
21201 - Linear Grading
CQ
Mile
2.94
12
23050.A - Heavy Brushing (includes grubbing the roadbed)
CQ
Mile
5.93
13
20305.B - Brushing
CQ
Mile
12.42
14
25101.A - Placed Riprap, class 2-3 (Commercial Source)
CQ
CY
95.00
15
30111 - Aggregate surface course, Grading F, Compaction Method A (Commercial Source)

CQ

CY

50.00

16
30122 – Pit Run, max size 4", Compaction Method A (Government Source)
CQ
CY
90.00
17
30326 - Road Reconditioning
CQ
Mile
20.13
18
30605 - Calcium Chloride, (pellet @ 94% min. concentration)
AQ
Ton
28.20
19
30805 - Bedding and backfill aggregate, comp. Method C (Commercial Source)

CQ

CY

66.00

20
60201.18 - 18 inch pipe culvert, 0.064 inch thickness for steel, 0.075 inch thickness for aluminum (incl. Culvert Excavation, Compaction Method C)

AQ

LF

60.00

21
60201.18 - 24 inch pipe culvert, 0.064 inch thickness for steel, 0.075 inch thickness for aluminum (incl. Culvert. Excavation, Compaction Method C)

AQ

136.00

22
30201.30 - 30 inch pipe culvert, 0.064 inch thickness for steel, 0.075 inch thickness for aluminum (incl. Culvert Excavation Compaction Method C)

AQ

50.00

23
65001 - Furnish and install Road Closure Device, size 14 ft.
AQ
Each
3.00
24
62201 - EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR

WITH THUMB

AQ

Hour

25
62202 - EQUIPMENT RENTAL, VIBRATORY GRID ROLLER
AQ
Hour
8
26
62203 - EQUIPMENT RENTAL, 10-12 CY DUMP TRUCK
AQ
Hour
8

TOTAL (All Items)

* Designated Method of Measurement: AQ - Actual Quantities, LSQ - Lump Sum Quantities; CQ – Contract Quantities

B-2 PRICE PROPOSAL INSTRUCTIONS: Unit prices and total item amounts must be submitted for all items except those designated as Lump Sum. Do not round the extended item totals and provide unit prices when required to the nearest dollar.

B-3 BOND PREMIUMS: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Item 1 - 15101 Mobilization.

B-4 OFFER SUBMITTAL: As your offer, submit a completed and signed Standard Form 1442, the completed Schedule of Items, a Technical Proposal, an original bid bond, a completed Section K and a completed Verification of Worker’s Compensation Insurance Form (provided in Section J). Corporate offerors are also required to submit forms AD-3030 and AD-3031 (provided as attachments to the solicitation). Technical and price proposals are required for evaluation of offers. See Section L for proposal instructions and Section M for evaluation/award information.

Electronic or facsimile proposals are NOT acceptable.

B-5 ADDITIONAL CLASSIFICATION REQUIRED – DAVIS-BACON GENERAL WAGE DECISION ID170040, 7/21/2017: A wage rate for an Excavator Operator shall be conformed after award in accordance with FAR 52.222-6 Construction Wage Rate Requirements (MAY 2014) and direction provided in the subject Wage Decision. The most recent wage rate approved by the Department of Labor for this classification in Idaho County was $28.60 per hour rate with $11.85 fringe benefits (conformed July 2017). No reference wage for Bonners County is available at this time.

B-6 IDAHO USE TAX Under Clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491. See Forest Service Supplemental Specification, Control of Work – Subsection 105.02 for a description of the GFP to be provided under this contract.

SECTION C - DESCRIPTION/SPECIFICATIONS

C-1 - PROJECT DESCRIPTION AND LOCATION

(a) Description of Work: This project consists of reconditioning and the reconstruction of approximately 25 miles of forest service roads. Work includes, but not limited to, reconstructing old road prisms, brushing, clearing and grubbing, constructing drainage features, installing culverts, ditch lines and reestablishing the travel way or reconditioning the travel way for proper drainage and safety. Placing aggregate and Calcium Chloride is also required.

(b) Project Location: This Project is located on the Priest Lake Ranger District and can be accessed from Priest River by taking HWY 57 north for approximately 12.6 miles and turn right onto County Road 416 East approx. 0.4 miles to End of County maintenance beginning of the project. Coordinates N 48° 20’ 37” W 116° 59’ 26” T. 58 N., R. 5 W., BM.

(c) Price Range: Government cost estimate, per FAR 36.204, is between $100,000 and $250,000.

(d) Pre-Bid Tour. No pre-bid tour is scheduled for this project. Interested Bidders are encouraged to visit the project site prior to submittal of prices and technical proposal.

(e) Pre-Bid Conference: No pre-bid conference is scheduled for this project. Interested bidders may obtain additional information by contacting the Contracting Officer or one of the Engineers listed below.

Contracting Questions:Technical Questions:
Karen Ruklic 208-983-5144Rick Driggs 208-265-6637
kruklic@fs.fed.usrrdriggs@fs.fed.us
Idaho Montana Acquisition TeamSandpoint Ranger Station
Grangeville Office1602 Ontario Street
104 Airport RoadSandpoint, ID 83864

Grangeville, ID 83530

(f) Performance Period:

Estimated Beginning DateCompletion Date
October 1, 2017September 30, 2018

The Contractor shall maintain progress at a rate that will assure completion of work by the required completion date. The count of contract time will start on the date specified in the Notice to Proceed.

(g) Government-Furnished Property (See FSSS Control of Work - Subsection105.02 Material Sources and Section I for standard clause).

· Pitrun Aggregate

· Unclassified Borrow

· Riprap (if needed)

C-2 - STANDARD SPECIFICATIONS "FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this Solicitation and any resultant contract.

Copies of the "FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS" are available for download at the following URL:

http://www.wfl.fha.dot.gov/design/specs/fp03.htm. The FP-03 U.S. Customary version is only available (for sale) through the Federal Lands Highway Headquarters office.

Headquarters Washington DC David K. Green Construction Standards Engineer Internet: david.green@fhwa.dot.gov Mail: Federal Highway Administration

HFPD-3

400 Seventh Street, SW Washington D.C. 20590

The following sections of “FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.

Spec No Title Section 101 – Terms, Format, and Definitions Section 102 – Bid, Award, and Execution of Contract Section 103 – Scope of Work Section 104 – Control of Work Section 105 – Control of Material Section 106 – Acceptance of Work Section 107 – Legal Relations and Responsibility to the Public Section 108 – Prosecution and Progress Section 109 – Measurement and Payment Section 151 – Mobilization Section 153 – Contractor Quality Control Section 155 – Schedules for Construction Contracts Section 156 – Public Traffic Section 157 – Soil Erosion Control Section 170 – Development Water Supply and Watering Section 201 – Clearing and Grubbing Section 203 – Removal of Structures and Obstructions Section 204 – Excavation and Embankment Section 212 – Linear Grading Section 230 – Roadside Brushing Section 251 – Riprap Section 301 – Untreated Aggregate Courses Section 303 – Road Reconditioning Section 306 – Dust Palliative Section 308 – Minor Crushed Aggregate Section 602 – Culverts and Drains Section 607 – Cleaning, Reconditioning and Reparing Existing Drainage Structures Section 622 – Rental Equipment Section 625 – Turf Establishment Section 633 – Permanent Traffic Control Section 650 – Road Closure Devices Section 651 – Development of Pits and Quarries Section 703 – Aggregate Section 704 - Soil Section 705 – Rock Section 713 – Roadside Improvement Material Section 718 – Traffic Signing and Marking Material Section 725 – Miscellaneous Material

C-3 - SUPPLEMENTAL PROJECT SPECIFICATIONS

The Supplemental Project Specifications listed below are applicable to this contract and are located in a separate attachment in Section J.

Spec No Title Page(s) Preface 1 FSSS 101 – Terms, Format, and Definitions 5 FSSS 102 – Bid, Award, and Execution of Contract 1 FSSS 103 – Scope of Work 1 FSSS 104 – Control of Work 1 FSSS 105 – Control of Material 1 FSSS 106 – Acceptance of Work 1 FSSS 107 – Legal Relations and Responsibility to the Public 2 FSSS 108 – Prosecution and Progress 1 FSSS 109 – Measurement and Payment 1 FSSS 151 – Mobilization 2 FSSS 153 – Contractor Quality Control 1 FSSS 155 – Schedules for Construction Contracts 1 FSSS 156 – Public Traffic 3 FSSS 157 – Soil Erosion Control 2 FSSS 170 – Develop Water Supply and Watering 1 FSSS 201 – Clearing and Grubbing 2 FSSS 203 – Removal of Structures and Obstructions 2 FSSS 204 – Excavation and Embankment 12 FSSS 212 – Linear Grading 2 FSSS 230 – Brushing 2 FSSS 251 – Riprap 1 FSSS 301 – Untreated Aggregate Courses 6 FSSS 303 – Road Reconditioning 3 FSSS 306 – Dust Palliative 2 FSSS 308 – Minor Crushed Aggregate 2 FSSS 602 – Culverts and Drains 1 FSSS 607 – Cleaning, Reconditioning, and Repairing Existing Drainage Structures 1 FSSS 622 – Rental Equipment 1 FSSS 625 – Turf Establishment 3 FSSS 633 – Permanent Traffic Control 1 FSSS 650 – Road Closure Devices 2 FSSS 651 – Development of Pits and Quarries 1 FSSS 703 – Aggregate 6 FSSS 705 – Rock 2 FSSS 713 – Roadside Improvement Material 1 FSSS 718 – Traffic Signing and Marking Material 1 FSSS 725 – Miscellaneous Material 1

C-4 - DRAWINGS The following drawings are a part of this solicitation and any resulting contract and are found in a separate attachment in Section J.

DescriptionSheet
Cover SheetSheet 1 of 19
Typical Sign DetailsSheet 2 of 19
Project Vicinity MapSheet 3 of 19
Summary of Estimated QuantitiesSheet 4 of 19
Project Work Descriptions and Project Conceptual MapSheet 5 of 19
Project Work Descriptions and Project Conceptual MapSheet 6 of 19
Project Work Descriptions and Project Conceptual MapSheet 7 of 19
Project Work Descriptions and Project Conceptual MapSheet 8 of 19
Project Work Descriptions and Project Conceptual MapSheet 9 of 19
Design Criteria, Culvert List and General NotesSheet 10 of 19
Typical Section and notesSheet 11 of 19
Culvert Headwall, Catch Basin & Typical Aggregate & Ditch SectionsSheet 12 of 19
Turnout and Truck Turn Around Details. Grade Dip Details and NotesSheet 13 of 19
Excavation Details and Fill Repair and Pit Development PlanSheet 14 of 19
Culvert Installation DetailsSheet 15 of 19
Culvert Band DetailsSheet 16 of 19
Culvert Band DetailsSheet 17 of 19
Culvert Band DetailsSheet 18 of 19
Typical Gate DetailsSheet 19 of 19

C- 5 - STATEMENT OF WORK/SPECIFICATIONS (AGAR 452.211-72) (FEB 1988). The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C–7 - Biobased Product Utilization

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.

The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).

The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Hydraulic FluidsPenetrating LubricantsDegreasers
AbsorbentsDiesel Fuel AdditivesGreases
Dust Suppressants2-Cycle Engine OilSorbents
Adhesive and Mastic RemoversCleanersConcrete/Asphalt Release Fluids
Composite PanelsSealersWood and Concrete Sealers
Graffiti and Grease RemoversStain RemoversMetalworking Fluids

Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.

In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.

SECTION E - INSPECTION AND ACCEPTANCE

E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52-246-6 Inspection-Time and Materials and Labor Hour (MAY 2001) **Applicable to Equipment Rental Items only.

E-2 - INSPECTION OF CONSTRUCTION (FAR 52.246-12) (AUG 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

SECTION F - DELIVERIES OR PERFORMANCE

F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984 The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Sepember 30, 2018. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by July 9, 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

**Performance of work in the Fall of 2017 is not precluded by this contract. However, the government is only required to provide more contract time if the Notice to Proceed is not issued on or before July 9, 2018.

SECTION G - CONTRACT ADMINISTRATION DATA

G-1 - CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer (CO) will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the prework conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the Specifications, shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1 CONDITIONS ON USE OF PREMISES (Camping)

(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the Contracting Officer.

(b) No improvements of a permanent nature shall be constructed without prior written approval of the Contracting officer.

Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.

(c) Livestock will not be permitted without written approval from the Contracting Officer.

(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the CO.

(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the CO. All petroleum spills shall be immediately cleaned up. All spills shall be reported immediatly to the CO or CO. Spills over 25 gallons or that cause a sheen on surface water shall be reported to the Idaho State Department of Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.

(f) Chemical toilets are preferred for all campsites, however, the Contractor may be permitted to construct a slit trench when conditions warrant. Any slit trench constructed shall not be located closer than 400 feet to any live stream and is subject to approval of the CO. The trench shall be covered and the area restored to as natural a condition as possible when the camp is closed.

(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:

Garbage, trash, sewage waste, and other litter shall be kept in closed fly-proof containers and periodically hauled to an approved disposal facility located outside of the National Forest.

(h) Waste water shall be disposed of in a leach pit located at least 300 feet from springs, streams, and lakes. The pit shall be a minimum of 2 x 2 x 2 feet and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least two feet of compacted soil when the camp is closed.

(i) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.

Storage facilities for materials capable of causing water pollution, if accidentally discharged, shall be located so as to prevent any spillage into waters, or channels leading into water, that would result in substantial harm to fish and wildlife or to human water supplies.

(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked.

The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.

H- 2 Key Personnel

The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.

H-3 BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. See FSSS 156 Public Traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes. Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

H- 4 Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. N/A

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H-5 PETROLEUM PRODUCTS

Storage of more than 200 gallons of petroleum products on the project must be done under the rules and regulations of the State of Idaho Forest Practices Act (IDAPA 20.02.01) and INFISH Standard RA-4. A partial list of these requirements are listed below.

1. Storage containers shall be sited within a constructed dike of sufficient size to contain 125% of the volume of the petroleum products stored in the tanks.

1. The storage areas shall be located more than 300 feet from any existing stream courses.

Fueling of equipment shall be done in a manner to eliminate potential spills.

1. Transfer trucks shall be limited to 200 gallons maximum.

1. Fueling of equipment shall take place a minimum of 300 feet from any stream course. If this requirement cannot be met a written spill plan must be approved by the COR.

1. All spills shall be reported immediately to the COR. Spills over 25 gallons or that cause a sheen on nearby surface water must be reported to the Idaho Division of Environmental Quality.

No more than 5 gallons of fuel within 100 feet of a stream are allowed at any one time and storage of more than 5 gallons of fuel requires spill containment measures.

All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site. Equipment and materials will be specific to each project site, and can include spill kits appropriately sized for specific quantities of fuel, shovels, absorbent pads, straw bales, containment structures and liners, and/or booms.

H-6 Reference FAR 52.236-13, Accident Prevention.

Safety. Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials, and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control, and coordination with other users.

H- 7 Loss, Damage, or Destruction

(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

All claims arising under this clause will be submitted to the Contracting Officer.

H- 8 Equipment Rental.

This work consists of furnishing and operating equipment for work ordered by the CO not otherwise…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .