Amendment__001_-_Updated_Schedule_of_Items.doc
DOC document 42 KB Posted
- Attached to
- USFS Road 286 Improvements Federal contract opportunity
- Solicitation number
- AG-02RC-S-15-0082
About this file
Amendment 001 - Updated Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__001_-_Road_286_Improvements_(Signature_Required).pdf | ||
| Road_286_Improvements_Worklist.docx | DOCX document | |
| Road_286_Improvements_Specifications.docx | DOCX document | |
| Drawings_Rd__286_Impeovements_(AG-02RC-S-15-0082).pdf | ||
| Nez_Perce-Clearwater_NF_Rd_286_Improvements_(AG-02RC-S-15-0082).doc | DOC document | |
| SF25A-14a.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 – THE SCHEDULE
SECTION B – SERVICES AND PRICES
Forest Service Road 286 Improvements
NEZ PERCE-CLEARWATER NATIONAL FORESTS
IDAHO COUNTY, IDAHO
B-1 SCHEDULE OF ITEMS
| Pay Item Number |
| Description |
| Method |
of
Meas.
| Pay Unit |
| Estimated |
Qty.
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| LSQ |
| LS |
| 1 |
| 15713 |
| Soil Erosion Control & Dewatering |
| LSQ |
| LS |
| 1 |
| 20103 |
| Clearing and Grubbing Light, Disposal Method (e) Scatter (f) Windrow |
| LSQ |
| LS |
| 1 |
| 20301 |
| Removal of Culverts |
| CQ |
| EA |
| 40 |
| 20404 |
| Unclassified borrow (Government furnished)* |
| CQ |
| CY |
| 60 |
| 30322 |
| Road Reconditioning |
| AQ |
| MI |
| 24.7 |
| 30801 |
| Road Surface Aggregate, Compaction Method 2 (Commercial Source) |
| CQ |
| CY |
| 835 |
| 60250A |
| 18”-Corrugated Metal Pipe, 0.64-thickness, for steel |
| AQ |
| LF |
| 1466 |
| 60250B |
| 24”-Corrugated Metal Pipe, 0.64-thickness, for steel |
| AQ |
| LF |
| 80 |
| 62201 |
| Equipment rental, Hydraulic Excavator with Thumb |
| AQ |
| HR |
| 8 |
| 62202 |
| Equipment rental, Large Dump Truck |
| AQ |
| HR |
| 8 |
Total (All Items) Item 20404 locations shall be as designated by CO throughout the project, borrow will used at various culvert installations when unsuitable material is found. Removal of unsuitable to waste site is incidental to this item.
Designated Method of Measurement: CQ=Contract Quantity; AQ= Actual Quantity LSQ=Lump Sum Quantity B-2 - NOTE: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. The above pay items are contract quantities unless noted.