- Idaho Panhandle NF, CdA River RD, Road Maintenance Grading Federal contract opportunity
- Solicitation number
- AG-02RC-S-13-0070
About this file
solicitation package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD95_0228_Idaho.docx | DOCX document | |
| ExhibitB_DailyActivity_report.docx | DOCX document | |
| PAST_PERFORMANCE_SURVEY.docx | DOCX document | |
| Idaho_WCI.docx | DOCX document | |
| ExhibitA_2013_BladingTypical.pdf | ||
| SF1449.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMERCIAL ITEMS, Road Maintenance, Grading, AG-0281-S-13-0031
Insert SF1449 form, 2 pages Road Grading
Coeur d Alene River Ranger Districts
Shoshone and Kootenai, Counties, Idaho, Idaho Panhandle National Forests
Continuation of SF1449 Block 27:
Block 19-24, schedule of items for Base Year Sept 2013-Dec 2014 Area: Coeur d Alene River Ranger District
ITEM
NO.
| DESCRIPTION |
| PAY |
UNIT
EST
QTY
UNIT
PRICE
TOTAL
| 1.1 |
| Road Grading |
| MI |
| 50 |
| $ |
| $ |
OPTION ITEMS
| 1.2 |
| Hourly work, as needed |
| HR |
| 5 |
| $ |
| $ |
| 1.3 |
| Water Truck |
| HR |
| 10 |
| $ |
| $ |
| 1.4 |
| Dump Truck |
| HR |
| 5 |
| $ |
| $ |
| 1.5 |
| Loader/Backhoe |
| HR |
| 5 |
| $ |
| $ |
Total 2013
| $ |
| $ |
Block 19-24, schedule of items for Option Year 1, Jan-Dec 2015
| 1.11 |
| Road Grading |
| MI |
| 50 |
| $ |
| $ |
OPTION ITEMS
| 1.12 |
| Hourly work, as needed |
| HR |
| 5 |
| $ |
| $ |
| 1.13 |
| Water Truck |
| HR |
| 10 |
| $ |
| $ |
| 1.14 |
| Dump Truck |
| HR |
| 5 |
| $ |
| $ |
| 1.15 |
| Loader/Backhoe |
| HR |
| 5 |
| $ |
| $ |
Total 2015
| $ |
| $ |
Continuation of SF1449
BASIS OF AWARD: The Government anticipates awarding one Firm-Fixed Price Indefinite Delivery Requirements type contracts to the offeror providing the best over-all value to the Government.
**Estimated Quantities are for the purpose of evaluation of prices. The planned roads and mileage for the 2013/2014 field seasons will be ordered with Task Orders as the need arises. The estimates are based on anticipated work and funding available. The estimates are not a representation to an offeror or contractor that the estimated quantity is required or will be ordered or that conditions affecting requirements will be stable or normal.
Costs for mobilization and moves between job locations will be considered incidental to the ordered work, therefore the Contractor must consider this expense in the pricing.
The terms Grading and Blading may be used interchangably throughout the package.
During the period specified in FAR clause 52.216-18, Ordering, the Government may place orders totaling an amount not to exceed $225,000 over the life of the contract.
Options.
Work associated with the Option Items shall be ordered by the C.O. and is anticipated for the cleaning of catchbasins and inlets/outlets, ditches, slides, blading non-road areas such as campgrounds as well as for spot blading on specified roads or other similar maintenance items as needed.
Option Year may be exercised and will include review of performance evaluations on previous task orders under this contract.
Authorized Ordering Officials: The following individuals are authorized to place orders under this contract: Warranted personnel assigned to the R1 IMAT.
ADDENDUM TO 52.212-4 Contract Terms and Conditions-Commercial Items.
AGAR 452.211-74 Period Of Performance.
The Contracting Officer will provide information to complete the Clause for each Task Order.
The period of performance of this Task Order is from ___*___ through ___*___.
AGAR 452.211-75 Effective Period Of Contract (FEB 1988). The effective period of this contract is from date of contract award through December 31, 2014 for the base year, and one option year as exercised, not to exceed December 31, 2015.
Estimated start work date: September 2013 or upon favorable ground conditions The Government will issue a Notice to Proceed with each Task Order as soon as weather and ground conditions are favorable for work. The count of contract time will start on the date specified on the Notice to Proceed. The Contractor shall maintain progress at a rate which will assure completion of work within the specified contract time.
FAR 52.216-18 Ordering (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from Date of Award through December 31, 2013 and December 31 of any subsequent Option Years.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
FAR 52.216-19 Order Limitations (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2500, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor
(1) Any order for a single item in excess of 100 miles
(2) Any order for a combination of items in excess of $225,000 or
(3) A series of orders from the same ordering office within 60 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e.,includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-21 Requirements. (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after expiration of contract.
52.217-7 Option for Increased Quantity—Separately Priced Line Item. (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within period of performance. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.217-9 Option to Extend the Term of the Contract. (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 1 year; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed December 31, 2015.
FAR 52.232-19 Availability of Funds for the Next Fiscal Year (APR 1984). Funds are not presently available for performance under this contract beyond September 30, 2013 or subsequent option year. The Government’s obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond September 30, 2013, or subsequent option year, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, And Improvements (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2)on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
AGAR 452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Equipment Operator(s) providing the grading services
On-Site Representative
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
FAR 52.242-15 Stop-Work Order (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
Equipment Rental. This work consists of furnishing and operating equipment for work ordered by the CO not otherwise provided for under the contract. This work shall be authorized in advance by the Government and there is no guarantee that any hourly work will be ordered. Make equipment available for inspection and approval before use. Furnish and operate equipment with such auxiliary attachments, oilers, etc., as are usually needed for efficient operation of the equipment. Keep the equipment in good repair and operating condition. Daily written records, such as shift tickets to record the number of unit‑hours of operation are required to be signed and submitted with invoices. Do not measure time for moving equipment between project work sites. Do not measure non-operable equipment or equipment dependent upon another piece of non-operable equipment.
Payment. The working rate specified in the Schedule of Items shall be paid for all hours of actual operation of equipment on authorized work. Only quantities approved by the CO shall be accepted under this contract. The accepted quantities will be paid at the contract price per unit of measurement for the Rental Equipment pay item listed in the schedule of items. Payment will be full compensation for the work done and accepted. The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit prices.
Weed Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed time and location.
Safety. Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials, and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control, and coordination with other users Loss, Damage, or Destruction. Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment. All claims arising under this clause shall be submitted to the Contracting Officer.
Contractor Performance Assessment Reporting System (FEB 2011)
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b) Contact Information. The name and email address of the Contractor Representative will be required for each Task Order.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation. The email will be from: webptsmh@navy.mil Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(12) Pump and Trailer, NOT REQUIRED
(13) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Obtain a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
STATE OF IDAHO'S NOTICE TO OFFEROR Idaho Workers Compensation Law
1. Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage.
2. Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:
1221 Ironwood Drive, Suite 317 Main Street
1070 Hiline, Suite 300
Coeur d'Alene, ID 83815 Boise, ID 83720
Pocatello, ID 83201
(208) 769-1565
(208) 334-6029
(208) 236-6366
FAX NO. (208) 769-1465
1-(800) 950-2110
FAX NO. (208) 236-6050
FAX NO. (208) 334-5145
3. This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
4. IMPORTANT NOTE: The State of Idaho will NOT accept certificates of insurance, including those issued by the Idaho State Insurance Fund. You MUST complete and have approved for EVERY project you may receive award on, the Certificate of Verification of Workers' Compensation Insurance.
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
PERFORMANCE WORK STATEMENT, 6 pages
FAR 52.212-1 INSTRUCTION TO OFFERORS, 4 pages
FAR 52.212-3 OFFEROR REPRESENTATIONS & CERTIFICATIONS-COMMERCIAL ITEM
WAGE DETERMINATION NO.
Idaho 1995-0228, Rev. 28, dated 9/7/2012, 3 pages
Exhibit A, Blading Typical, 1 page Exhibit B, Daily Activity Report, 1 page State of Idaho Certificate of Verification Workers’ Compensation Insurance
Past Performance Survey-optional
1.0 PERFORMANCE WORK STATEMENT
1.1 Scope of Contract. Award of this solicitation will result in Firm-fixed Price, Indefinate Delivery Requirements contract. The Government is in need of road maintenance services for Road Grading that will result in the proper mix of aggregates and fines to maintain aggregates on the road way, the elimination of ruts and chuckholes, maintenance and functionality of ditchlines and water diversion structures, and removal of rocks, limbs and other debris from the road prism while maintaining vegetation that serves to prevent or moderate erosion from runoff. The services covered in this contract include the furnishing of all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road maintenance on roads specified herein, in compliance with the terms, specifications, conditions, and provisions of this solicitation. This work will include road grading, scarification, clearing debris from ditches, minor road repair, and other related work necessary to meet the objectives. Standard industry practice indicates use of a motor grader with a 12 to 14 foot moldboard blade and scarifier to effectively perform this type of work. Cleaning culvert catch basins and inlets/outlets, ditches, slides and other similar maintenance items. Some roads or road segments may require scarification in conjunction with grading in order to cut out washboards and chuck holes. The equipment used to perform this work shall meet safety standards and shall be in good mechanical condition.
1.2 Work Objective. Successful, quality performance will result in road blading, scarification, clearing debris from ditches, minor road repair and other related work necessary to meet objectives. The Government anticipates a minimum rate of production to be 5-6 miles per day.
1.3 Location and Description.
1.31 The work sites are located on the Coeur d Alene River Ranger District of the Idaho Panhandle National Forests. The locations and miles of roads and other information pertinent to each road will be identified in the task orders issued prior to starting work. Maps may be requested from Tammy Maiolie, CdA River RD,(208) 769-3071.
2. CONTRACTOR WORK REQUIREMENTS
2.1 Moving of Equipment and Supplies. The moving of equipment and supplies to the job site and between job sites shall be the contractor's responsibility and is incidental to grading.
2.2 Replacement of Equipment. Contractor shall provide quality equipment capable of safely performing the work under the terms of the contract. All repairs are the total responsibility of the Contractor.
2.3 Equipment Performance Standards. Contractor shall make equipment available for inspection and approval before use.
The Contractor must satisfy all applicable OSHA and DOT requirements or certifications for the operation of offered equipment. There will be no obligation to make payment for any equipment delivered that does not meet the Technical Specifications.
Equipment provided to conduct work must meet or exceed the following minimum specifications:
(a) Endloader/Backhoe
(1) Minimum 55 SAE net horsepower.
(2) Minimum 1 cubic yard loader bucket.
(3) Backhoe bucket must be a minimum of 18 inches wide and have a reach of at least 12 feet.
(4) ROPS rollover protection.
(5) *Year of manufacture - 1984 or newer.
(b) End Dump Truck
(1) Shall measure minimum of 12 cubic yards capacity.
(2) Meet all safety standards as set by the State of Idaho and shall be licensed to haul designated materials within the State of Idaho.
(3) End dump with latching tailgate and removable tailgate.
(4) *Year of manufacture - 1984 or newer.
(c) Water Truck
(1) An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul or if the source is a domestic potable water supply, or the water has been used for tank mixing with any other materials.
(2) 3000 to 4500 gallon capacity unit, watertight tank
(3) Single unit with frame mount tank preferred, depending upon accessibility
(4) Self contained filler pump with minimum 300 GPM capacity
(5) 40 – 50 feet of suction filler hose
(6) Capability to fill from either side
(7) Minimum 12 feet pressurized rear discharge road watering
(8) 6 inch side or rear “dump” for filling port-a-tanks’
(9) Controls in the cab for opening and closing water flow, to prevent ponding and washing at the beginning and ending of work areas
(10) Backup warning device
(11) 50 percent of original tread depth on tires, with available spare on truck
(12) * 1984 model or newer
*1984 model or newer on all equipment or upon approval of the Contracting Officer.
2.4 Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored and collected in a sanitary manner and disposed of in a State-approved sanitary landfill.
Oil from crankcases or gear boxes, equipment waste or spilled or excess fuel shall be placed in containers and removed from the work site and disposed of as approved and required by Federal, State and Local laws.
Equipment uses for operations in close proximity to streams or bodies of water will be required to meet more stringent requirements regarding seals and fittings that prevent the leaking of hydraulic fluids, lubricants and fuels. Failure to comply will result in immediate rejection of equipment.
2.5 Grading and Shaping. Performance of Road Maintenance includes grading and shaping the roadbed, including shoulders and turnouts and removing ruts, washes, slough, and other irregularities that prevent normal runoff from the road surface. The end result shall be the restoration and maintenance of the original cross section, grade and drainage of the road. The following standard industry practices will be reviewed during inspections to determine the results will be met.
2.5.1 – Grading to restore surface without loss of aggregate/gravel surfacing or disturbance or loss of road base material. Performance on gravel surfaced road shall be accomplished so the base is not disturbed and no surface material is lost in ditches or over the road shoulders. Grading of unsurfaced roads shall be performed so no base material is lost. Surface material shall be bladed from one edge of the road to the other in a berm in order to eliminate any segregation prior to spreading. Sections having segregated materials after spreading shall be reprocessed and spread.
2.5.2 – Elimination of ruts, chuckholes, and washes. These defects shall be repaired by scarifying or cutting to the bottom of such defects to provide for uniform compaction of roadbed material. Large rock or organic material removed from drainage facilities during cleaning process shall not be used as fill. High grading, or any method which merely fills depressions with loose material, does not eliminate the defect or provide for uniform compaction and is therefore not acceptable.
2.5.3 – Repair of Settlement sections shall be performed where possible by cutting from the roadbed on each end of the settled area and filling into the settled area to provide smooth transitions to adjacent road grades. If this will not accomplish the objective, the COR shall be informed.
2.5.4 - Grading and shaping operations shall not undercut road backslopes.
2.5.5 - Sections of roads constructed without roadside ditch shall be uniformly insloped or outsloped the entire width of the roadbed, unless otherwise specified on each individual task order (i.e. crowning). The inslope or outslope grade shall be a minimum of 2 percent and a maximum of 8 percent unless staked otherwise on the ground.
2.5.6 - Existing drainage dips shall be cleaned and the outslope grade restored to equal or exceed the gradient of the road.
2.5.7 - Sections of roads constructed with a roadside ditch shall be bladed and reshaped to maintain crown at centerline of the roadbed, or insloped except on curves where crown is omitted. Road cross section shall slope uniformly both ways from crown apex to shoulders at a minimum blade of 2 percent and a maximum blade of 6 percent.
2.5.8 - At the conclusion of the grading and shaping operations the roadbed shall be smoothed and dressed to produce a uniform grade and cross section and a surface free of hollows, depressions, and projections above the adjacent roadbed surface. No berm or ridge or any material shall be left along either shoulder of the roadbed unless directed by the COR.
2.6 Drainage Facilities - Cleaning and Repair
2.6.1 - Wood, rocks, and other debris shall be removed from roadside drainage ditches to provide unobstructed flow of water and disposed of on the jobsite as directed by the Contracting Officer's Representative. The backslope of the ditch shall not be undercut by ditch cleaning operations; and the slope to road shoulder shall be maintained at an approximate ratio of 3:1 from the bottom of the ditch to the edge of the roadbed. Roadside ditches shall not be excavated to a depth of greater than 2 feet below roadbed grade. Typical depth of roadside drainage ditches below roadbed is one foot. Existing ditch dikes shall be restored, reshaped, and compacted as needed for effective drainage through culverts.
2.6.2 - On aggregate-surfaced roads, material may be bladed across the road provided it is not deposited in ruts, washes, or chuckholes in the road surface. Such material shall be sidecast on stable fill slopes or natural ground out of streambeds, streams, or other waterways. No sidecasting will be permitted on roads paralleling streams where the ground slope from the outside road shoulder to the stream edge is steeper than 2:1. On roads without aggregate surfacing, surface soil with rocks less than 3 inches in greatest dimension may be spread evenly over the adjacent roadbed.
2.6.3 - Remove from bridge decks all rock and other material that would create a hazard to traffic or is otherwise detrimental to the traveled surface. Cattleguards shall be left clean between the bottom of the rails and ground beneath. No additional material may be deposited within cattleguards.
2.7 Maintenance of Traffic and Use of Warning Devices. The Contractor shall provide, erect, and maintain all necessary traffic control and devices for the protection of the work and public safety. The traffic control includes areas where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All traffic control methods and devices shall conform with the current edition of the Manual Uniform Traffic Control Devices for Streets and Highways (MUTCD), published by the Federal Highway Administration and applicable safety codes.
2.8 Removal of Obstructions. All fallen trees, limbs, brush, small slides or debris in the travelway or road ditchline shall be removed and scattered outside the travelway and ditchline.
2.9 Damage to Structures. The Contractor shall be held liable and is responsible for any damage caused by his/her personnel or equipment to any existing traffic loops, cattle guards, culverts, signs, and riprap protecting culvert inlets or fill slopes. Repair to these structures shall be at the Contractor's expense. Traffic loops will be marked on the ground with lath and fluorescent pink ribbon.
2.10 Soil Moisture – Retention of Fines. Contractor is responsible to ensure that performance does not reduce the level of fines in the road surface. Therefore, operations may be suspended when soil moisture conditions are not favorable for obtaining a satisfactory result. Suitable moisture conditions are determined to be in excess of five (5) percent and less than 15 percent by weight unless otherwise authorized by the COR.
3 ACCEPTANCE REQUIREMENTS
3.1 Inspection and Acceptance
The Contractor shall assure performance meets contract specifications, in accordance with FAR 52.212-4 Contract Terms and Conditions-Commercial Items prior to requesting the Government to inspect for payment or acceptance. Upon completion of a road, or segment of road not less than 5 miles in length, the Contractor shall notify the COR in writing to set a mutually agreed upon date for inspection of completed work. The Government will inspect completed sections of road within 3 business days (i.e. Monday – Friday, excluding Holidays) following Contractor’s notification of completion of the work.
3.2 Acceptance. Acceptance of the work under the contract will be made after steps above have been taken and the COR has made the determination of satisfactory compliance with the specifications. For acceptance purposes, complete segments as defined above, or an entire road if shorter in length, shall be satisfactorily completed before acceptance will be made. Acceptance will not be made for segments broken by unacceptable portions of work.
3.3 Rework and Reinspection After Rework. When inspection indicates the performance objectives were not met, the work will be deemed unacceptable and payment will not be made until the Contractor has corrected the deficiencies. Inspections after rework will be made in the same manner as the first inspection. The Contractor may be charged for actual costs incurred by the Government for inspection of rework.
4. DELIVERIES OR PERFORMANCE
4.1 Performance Period. Each task order will identify the performance period for the work being ordered and the contractor shall maintain progress at a rate, which will assure completion of the work within the period specified on the task order. The amount of contract time allowed for each task order will be determined by estimated rate of production.
4.1.1 Work may be accomplished during daylight hours (one-half hour before sunrise to one-half after sunset). The Government may restrict operations on weekends or Holidays of expected high use.
4.1.2 The Government reserves the right to specify the sequence in which the work is performed.
4. 2 Additional Deliveries or Performance Requirements. Non-operating Damages. When the Government is providing water for the road grading operation, it is the responsibility of the Contractor to notify the COR or Inspector if the grader is inoperative or the operator is unavailable. This notification shall be provided at least 12 hours prior to commencement of the subsequent grading operation. Failure to effect the notification stated above may result in the Contractor being assessed actual damages to the Government, including, but not limited to, all costs incurred in preparation of the road surface, as well as the COR’s and/or Inspectors salaries, per diem, and vehicle use.
5. Measurement
5.2. Measurement. Accepted work will be measured in miles to the nearest tenth mile along the centerline of the roadway cross section, and shall include only those roads or road portions which are ordered under the contract and completed to satisfactorily meet the contract objectives. Measurement will be by a Forest Service vehicle. The measuring device will be checked for accuracy and calibrated as necessary on a section of road that has been carefully measured with a surveyor's chain. NOTE: Parking areas, turnouts, and approach road connections are considered as incidental to the main roads and shall not be measured separately. Mileage measurement includes all work on both sides of the road, regardless of the number of passes made to accomplish the work. A daily activity log has been provided in the attachments for contractor use in recording work activity.
5.2.1 Hourly Work Method of Measurement. An hour consists of 60 minutes of actual operation of equipment on authorized Government work. Moving of equipment under its own power, when so ordered by the Contracting Officer, will constitute authorized work. Non-productive time such as, but not restricted to, lack of operating supplies or being stuck, or moving and loading time of equipment and specified accessories, shall not constitute "actual operation". When working on the hourly portion of the contract, the government may furnish a "Service" activity/inactivity vehicle motion clock recorder and an inspector to record the contractor’s hourly operational time.
5.2.1.1 Record of Work. The government will maintain a daily written record for each piece of equipment showing:
Contract and Task Order number and work sub-item number applicable to the equipment.
Name of Contractor and Operator.
Hours of operation authorized to nearest quarter hour.
Hour of actual operation on regular work.
Authorized hours of operation lost and reason.
This daily record can be documented on a shift ticket. The Operator performing the work or Designated Representative and the COR or Inspector shall sign the daily record each day. The daily record will be used to reconcile the contractor’s proper invoice for payment. Appropriate Government surveillance of contractor performance is required for ALL hourly work to give reasonable assurance that efficient methods and effective cost controls are being used.
52.212-1 Instructions to Offerors—Commercial Items. (Feb 2012)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show --
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) “Remit to” address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation.