AG-0261-S-17-0005___BAUMGARTNER_CAMPGROUND_ASPHALT_PROJECT_2017.pdf
PDF 3 MB Posted
- Attached to
- Baumgartner Campground Asphalt Maintenance Project 2017 Federal contract opportunity
- Solicitation number
- AG-0261-S-17-0005
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_2.pdf | ||
| AMENDMENT_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0261-S-17-0005
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
04/23/2017
PAGE OF
PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
831856
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SW Idaho-Nevada Acquisition Center ATTN: Karen Morthland 1249 South Vinnell Way, Suite 200 Boise ID 83709
SW Idaho-Nevada Acquisition Center ATTN: Karen Morthland 1249 South Vinnell Way, Suite 200 Boise ID 83709
9. TECHNICAL INFORMATION
CALL:
a. NAME Kevin Duchow
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(208) 737-3318
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Baumgartner Campground Asphalt Project 2017
Sawtooth National Forest
Price Range The Government’s estimate is: Between $100,000 and $250,000
11. The Contractor shall begin performance within 10 calendar days and complete it within 30 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F, Clause 52.211-10)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and 3 copies to perform the work required are due at the place specified in Item 8 by 12:00 pm local time May 24, 2017. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required. (If “is required” see AGAR Clause 452.228-70)
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
Duns No. ______________________________________
TIN: ___________________________________________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
SW Idaho-Nevada Acquisition Center ATTN: Karen Morthland 1249 South Vinnell Way, Suite 200 Boise ID 83709
Submit invoice to COR for the work performed. Invoice will be reviewed and approved or rejected by the COR within 7 days of receipt of the invoice. Rejected invoices must be corrected and resubmitted. COR will forward the approved invoice to the CO who will submit to:
USDA, OCFO, COD, APB
PO Box 60075 New Orleans, LA 70160
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
KAREN L. MORTHLAND
30b. SIGNATURE
30c. DATE
31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 3 of 56
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BAUMGARTNER CAMPGROUND ASPHALT PROJECT 2017
SAWTOOTH NATIONAL FOREST
ITEM
NO. DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY
UNIT
PRICE
TOTAL
AMOUNT
BASE BID
151-01 Mobilization LSQ LS
1 $XXXXX $
404 Hot Asphalt Patching
404-01 Hot Asphalt Patching - Roads AQ Ton 50
404-02
Hot Asphalt Patching Camp Spurs and living areas - approximated on the drawings and will be staked in the field AQ Ton 400
TOTAL BASE $
OPTION #1
404-03
Hot Asphalt Paving – complete camping spurs (sites 6, 32-33, 35) and fee area AQ Ton 138
OPTION #2 $
404-04
Hot Asphalt -Trails (Road to Day Use, Day Use to Hot Pool and to the Swimming Hole) AQ Ton 34
OPTION #3 $
308-01
Asphalt Patching Prep. (placing and compacting gravel for asphalt patches) DQ SY 3300
OPTION #4
404-05
Hot Asphalt Paving - Willow Creek Bridge – remove and replacement 2.5 inch asphalt overlay on bridge and approaches AQ Ton 13
TOTAL OPTIONS $
TOTAL BASE
PLUS OPTIONS $
* Designated Method of Measurement: LSQ - Lump Sum Quantities AQ – Actual Quantity DQ – Design Quantity B.2 Payment for Bond Premiums
Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
The Government reserves the right to exercise optional bid items either at the time of award, or during the life of the contract. The Government may determine to award one or more items at various times thorughout the contract and option items selected for award may not necessarily be in numerical order (i.e., government may elect to exercise option H over option A).
E-Mail Address: _______________________Phone Number: _________________DUNS: ________________________________
B.3 Basis For Payment
All items shown or noted on the drawings, which are not specifically bid items, are considered incidental items. The cost of furnishing and installing all incidental items will not be paid for separately, but shall be included in the unit price bid for other items unless noted otherwise.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 4 of 56
PART I - THE SCHEDULE
SECTION C - DESCRIPTION/SPECIFICATIONS
C.1 Project Description
This project consists of placing asphalt to patch sections of roads, parking areas, and camp spurs plus adding asphalt to increase the size of existing camp spurs. Optional work includes placing asphalt for additional camping spurs, trails, and for the removal and placement of asphalt over the Willow Creek Bridge.
The Baumgartner Campground is going through renovations and there are sections of road cuts that need patched, camping spurs that require asphalt patching plus camping spurs and 48 inch wide trails that need complete new asphalt. All asphalt placed will match existing pavement and have an approximate depth of
2.5 inches. Asphalt patching within the camping spurs consists of a variety of sizes of patches as well as patching around the picnic tables, utilities tables, and fire rings. This will require some handwork and compaction by smaller equipment.
Baumgartner Campground will be closed at its gate for the duration of the project. There is a small section of the project that is outside of the gate. Traffic signage and control informing the public that the section of road will be closed for the day while work is being done will be the contractor’s responsibility.
The drawings represent an approximation of the patching to obtain an asphalt quantity. The large square patches within the living units are just a volume of patch representing multiple smaller patches within that camping unit. For example, the bollards that are shown on the drawings have been removed and replaced with boulders. Asphalt is to be placed up against the boulders as closely as possible. This is the same with picnic tables, utility tables, and fire rings.
The option item for asphalt preparation includes placing government furnished gravel in the asphalt patch locations and compacting the gravel until the approximate depth of 2.5 inches remains for the asphalt patch.
If the option item for asphalt preparation is not awarded the Forest Service will place and compact a layer of road base where the asphalt placing and patching is to occur. However the contractor will be required to perform a minimal final touch to the base gravel before patching.
There is an option item for removing and replacing the asphalt on Willow Creek Bridge at approximately milepost 6.0 on Forest Service Road 70227, on the way from Featherville, Idaho to Baumgartner Campground. The pavement over the bridge deck is currently 2.5 inches thick that is breaking up in places creating potholes. Asphalt removed can be wasted in the Big Water Gravel Pit, near Baumgartner Campground. Asphalt placed in the gravel pit shall be stored near the rest of the asphalt located in the gravel pit. The new pavement for the approaches and thickness over the deck will be 2.5 inches.
C.2 Project Location
Baumgartner Campground is located approximately 10 miles east of Featherville, Idaho on Forest Service Road 70227, along the South Fork of the Boise River. The road is gravel from Featherville to Baumgartner campground.
C.3 Government Cost Estimate, per FAR 36.204, is between $100,000 and $250,000.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 5 of 56
C.4 Specifications
Standard Specifications (FP-03) and attached Forest Service Supplemental Specifications (FSSS) are applicable to this Public Works contract. All applicable FSSS are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-03) are available on-line at www.wfl.fha.dot.gov/design/specs/fp03.htm in pdf format.
• The equipment used for this project must be washed prior to entering the National Forest for weeds. See FSSS 151 for more detail.
• All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site, including fuel spill kits, shovels, and absorbent pads. The on-site heavy equipment may use diesel and refueling may be required during the duration of the project. See FSSS 107 for more detail.
• Precautions should be taken for work around the bridges so that nothing is spilled into the water.
• Roll edges of asphalt patches when they are not touching existing asphalt.
C.5 Biobased
A. The contractor must comply with Section9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide bio based products.
The Contractor shall utilize products and material made from bio based materials (e.g., bio based greases, bio based hydraulic fluids, bio based absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). The following is an example list of products that may be used in this contract for Construction for which bio based products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of bio based products listed meeting the health and environmental specifications.
Anti-Slip Agents Automotive Care Products Chain and Cable Lubricants Concrete and Asphalt Cleaners Concrete and Asphalt Release Concrete Curing Agents Concrete Repair Materials Corrosion Preventatives Engine Crankcase Oil
Erosion Control Fluids Forming Lubricants Gasoline Fuel Additives Gear Lubricants Greases Hydraulic Fluids Lubricant Components Other Lubricants
Parts Wash Solution Penetrating Lubricants Personal Protection Pneumatic Equipment Lubricants Turbine Drip Oils Wood and Concrete Sealers 2-Cycle Engine Oils
B. Bio based products that are designated for preferred procurement under USDA’s Bio Preferred program must meet the required minimum bio based content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their bio based products such as bio based content. In addition to the bio based products designated by the U.S. Department of Agriculture in the Bio Preferred Program, the Contractor is encouraged to use other bio based products.
http://www.wfl.fha.dot.gov/design/specs/fp03.htm http://www.biopreferred.gov/
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 6 of 56
The Contractor shall comply with the provisions at FAR 52.223-1, Bio based Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Bio based Products under Service and Construction Contracts.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 7 of 56
SECTION E - INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - https://www.acquisition.gov/far and the Agriculture Acquisition Regulations – www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements. (Apr 1984) 52.246-12 Inspection of Construction (AUG 1996)
E.2 Inspection and Acceptance
Periodic field inspection will be made by the Contracting Officer’s Representative (COR) or the COR’s designated inspector. Work not completed to Contract specifications shall be reworked without additional compensation to the Contractor.
https://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 8 of 56
SECTION F - DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use within 30 Calendar Days. The time stated for completion shall include final cleanup of the premises.
ESTIMATED START DATE CONTRACT TIME
July 10, 2017 30 Calendar Days
F. 3 AGAR 452.236-75 Maximum Workweek--Construction Schedule (Nov 1996)
Within 3 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is between the hours between 7:00 a.m. and 7:00 p.m.
Monday through Friday.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 9 of 56
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 Government-Furnished Materials
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
If the option item for asphalt preparation is awarded the government will furnish the road gravel base material. Otherwise there is no government furnished material.
G.2 Submission Of Invoices Invoice Processing Platform (IPP)
The Contractor shall utilize the Invoice Processing Platform (IPP) for the electronic submission and tracking of purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service offered free of charge to Government Agencies and their suppliers.
A one-time enrollment in IPP will generate a series of emails that will be sent to the point of contact established in your SAM.gov account. The first email will be from “IPP User Administration” and will contain the IPP login ID and link to the IPP Website. A second email from “Treasure UPS User Administration” containing the password will be sent within 24 hours. Once both emails are received, the Contractor will login to the IPP application and complete the registration process. After login, you will be able to access IPP training information.
IPP System benefits include the ability to create invoices directly from a contract award and submit them electronically, as well as:
Email notification when invoice(s) are paid Online payment history Email notification when you are awarded a new contract
The email notification of payment is sent when a payment is distributed to your bank account and will include all pertinent payment information. For additional information, please visit the www.ipp.gov website to learn more. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding Federal holidays) from 8 a.m. to 6 p.m. ET, to answer questions related to accessing IPP or completing the registration process. Their toll-free number is 1-866-973.3131 or they can be reached at IPPCustomerSupport@fms.treas.gov.
G.3 Measurement
Units of measurement shall be as indicated in the Schedules of Items.
http://www.ipp.gov/ mailto:IPPCustomerSupport@fms.treas.gov
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 10 of 56
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996)
H.2 Site Information And Limitations
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required.
The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. The contractor shall coordinate inspection of the equipment by the Forest Service prior to off-loading from the trailer.
H.3 Temporary Access
Parking: Use designated areas for construction personnel or as approved by the Contracting Officer for parking.
H.4 Waste Management And Disposal
Processing waste material for salvage and recycling is encouraged.
The Contractor shall provide and maintain appropriate waste disposal containers or bins at the project site for the duration of the project construction. Verify with Contracting Office for placement of disposal containers and bins on the project site.
Waste material and debris shall be picked up and deposited in the waste disposal bins on a daily basis.
Containers must be emptied on a weekly basis unless more frequent emptying is needed.
Burning or burying of construction waste material on site will not be permitted. Material shall be disposed of in accordance with the Waste Material Disposal specification.
H.5 Field Offices, Work Camps, Staging And Storage Areas
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site. Overnight camping and housing on site will not be allowed.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 11 of 56
H.6 Inspection Of Worksite
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
H.7 Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 12 of 56
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 13 of 56
(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(12) Pump and Trailer.
(13) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Obtain a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
H.8 AGAR 452.236-77 Emergency Response (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 14 of 56
(1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.
(2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.
H.9 Loss, Damage, Or Destruction
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H.10 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H.11 Conformity With Drawings And Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H.12 Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H.13 Barricades, Warning Signs, And Other Devices
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 15 of 56
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
H.14 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H.15 Prework Conference
Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.
H.16 State Of Idaho’s Notice To Offeror
(a) Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage. See Section J.4 for Workers’ Compensation Form. This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
(b) Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 16 of 56
North Idaho Southwest Idaho 1221 Ironwood Street, Suite 100 317 Main Street Coeur d'Alene, ID 83814 P.O. Box 83720
(208) 769-1565 Boise, ID 83720-0041 Fax No. (208) 769-1465 (208) 334-6032
(800) 950-2110 Fax No. (208) 334-5145 Southeast Idaho 1070 Hiline, Suite 300 Pocatello, ID 83201
(208) 236-6366 Fax No. (208) 236-6040
(c) This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 17 of 56
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
52.202-1 Definitions. (NOV 2013) 52.203-5 Covenant Against Contingent Fees. (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) 52.203-7 Anti-Kickback Procedures. (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity(MAY
2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011) 52.204-7 System for Award Management. (OCT 2016) 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011) 52.204-10 Reporting Executive Compensation and First-tier Subcontract Awards (OCT 2016) 52.209-2 Prohibition on Contracting With Inverted Domestic Corporations-Representation (Nov
2015) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Nov 2015) 52.215-2 Audit and Records - Negotiation. (OCT 2010) 52.215-8 Order of Precedence - Uniform Contract Format. (Oct 1997) 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) 52.219-8 Utilization of Small Business Concerns. (NOV 2016) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2014) 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) 52.222-6 Construction Wage Rate Requirements. (MAY 2014) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (MAY 2014) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014) 52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations (MAY
2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014)
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 18 of 56
52.222-19 Child Labor-Cooperation with Authorities and Remedies (OCT 2016) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY
2014) 52.222-21 Prohibition of segregated facilities. (APR 2015) 52.222-26 Equal Opportunity. (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-37 Employment Reports on Veterans. (FEB 2016) 52.222-50 Combating Trafficking in Persons. (MAR 2015) 52.222-54 Employment Eligibility Verification. (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-14 Acquisition of EPEAT(R)-Registered Televisions. (JUN 2014) 52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011) 52.224-1 Privacy Act Notification. (Apr 1984) 52.224-2 Privacy Act. (Apr 1984) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.228-15 Performance and Payment Bonds - Construction. (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-1 Payments. (APR 1984) 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) 52.232-8 Discounts for Prompt Payment (FEB 2002) 52.232-11 Extras (APR 1984) 52.232-16 Progress Payments. (Apr 2012) 52.232-17 Interest. (MAY 2014) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
(APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984)
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 19 of 56
52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-14 Availability and Use of Utility Services. (APR 1984) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-16 Quantity Surveys. (APR 1984) 52.236-17 Layout of Work. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) - Alternate I (APR 1984) 52.236-26 Preconstruction Conference. (FEB 1995) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.243-5 Changes and Changed Conditions. (Apr 1984) 52.244-6 Subcontracts for Commercial Items. (JAN 2017) 52.245-1 Government Property. (JAN 2017) 52.246-13 Inspection - Dismantling, Demolition, or Removal of Improvements. (Aug 1996) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering - Construction. (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.224-70 Confidentiality of Information (FEB 1988) 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response. (NOV 1996)
I.2 FAR 52.219-28 Post-Award Small Business Program Representation (JUL 2013)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
AG-0261-S-17-0005 Baumgartner Campground Asphalt Project 2017 Page 20 of 56
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on…