Attachment_1_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Virginia Creek Trail Bridge Construction Project Federal contract opportunity
Solicitation number
AG-0261-S-13-0096
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to Virginia Creek Trail Bridge Construction Project, newest first.
File Type Posted
ag0261s130096.pdf PDF
attachment_3.pdf PDF
Attachment_2_TrailBridgeWP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
PLEASE COMPLETE PAGE 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
Virginia Creek Trail Bridge Replacement
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
AG-0261-S-13-0096Humboldt-Toiyabe NF, Bridgeport Ranger District
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
151MobilizationLump Sum10.000.000.000.000.000.000.00
203Removal of Existing Bridge, Disposal Method ALump Sum10.000.000.000.000.000.000.00
557-1Concrete Abutments and WingwallsLump Sum20.000.000.000.000.000.000.00
557-2Glulam Stringer Bridge 28'x4'Lump Sum10.000.000.000.000.000.000.00
557-3Approach FillLump Sum20.000.000.000.000.000.000.00
TOTALS0.000.000.000.00
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$0.00

TOTAL LABOR COSTS $ 0.00

TOTAL OTHER DIRECT COSTS $ 0.00

TOTAL DIRECT COSTS $ 0.00

OVERHEAD 0 % $ 0.00

SUBTOTAL $ 0.00

PROFIT 0 % $ 0.00

TOTAL PRICE $ 0.00

DATE FIRM NAME Government Estimate

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .