AG-0261-S-10-0074.pdf
PDF 881 KB Posted
- Attached to
- Casner Creek Stream Rehabilitation Federal contract opportunity
- Solicitation number
- AG-0261-S-10-0074
About this file
Solicitation Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ag-0261-s-10-0074 casner creek stream rehab amend 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 1
United States Department of Agriculture
Forest Service
SW Idaho/Nevada Acquisition Center
1249 South Vinnell Way Suite 200 Boise, ID 83709
SOLICITATION NO.: RFQ AG-0261-S-10-0074
OFFERS ARE SOLICITED FOR: Casner Creek Stream Rehabilation
OFFERS WILL BE DUE ON: July 22, 2010 @ 16:30 Mountain Daylight Time
AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR
REPONSE TO THIS SOLICITATION:
1. SF 1442: Complete, date, and sign.
2. Fill out the pricing schedule for all items (Pg. 4) (Complete Unit Prices and Amounts)
3. Provide your TIN and DUNS NUMBER. (Pg. 51)
4. Representations and Certifications (Pgs 37-41).
5. Provide a Technical Proposal which responds to the Evaluation Factors (Pg.42-46).
IT IS REQUESTED THAT YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF
YOUR ENVELOPE.
41-45Return to: SW Idaho/Nevada Acquisition Center
ATTN: TANYA SPANFELLNER
1249 S. Vinnell Way Suite 200 Boise, ID 83709
Offers may alternatively be faxed to us at 208-373-4197.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
424050
BOISE NATIONAL FOREST
1249 S VINNELL WAY
SUITE 200
BOISE ID 83709
TANYA SPANFELLNER 208-373-4130
107/12/2010
AG-0261-S-10-0074
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Casner Creek Stream Rehabilitation
FAR 36.204 Disclosure of the Magnitude of Construction Projects
The magnitude of the requirement is
Less than $25,000.00
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
07/16/2010
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
BOISE NATIONAL FOREST
1249 S VINNELL WAY
SUITE 200
BOISE ID 83709
TANYA SPANFELLNER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 4
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
UNIT OF
ISSUE
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
1 Casner Creek Stream Rehabilitation Project
LS 1 $
GRAND TOTAL $
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 5
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C1 SCOPE OF CONTRACT
The Contractor shall furnish all necessary labor, equipment, supervisions, transportation, and supplies necessary to perform the work in accordance with the specifications.
The purpose of this solicitation is to procure services for the Casner Creek Stream Rehabilitation project to be implemented in 2010. The services will include excavation, transportation and grading of fill material,, placement of biolog check dams, and planting willows/sedges (with an excavator).
The restoration will implement passive restoration by removing an earthen berm along the left (west) bank of Casner Creek and initiating meander development. The berm is a remnant of mining activities in the 1950s and is preventing overbank flow during spring runoff. The project implementation components are described below:
1. Remove berm: An excavator will be used to remove the berm’s full length, approximately 2050 feet in length, 10-20 feet wide and 1.5 feet deep or about 1500 cubic yards of material along the left (west) bank of Casner Creek. (See attachment 1)
2.
a. The existing vegetation on the berm will be retained as much as possible (by removing, temporarily storing and replacing “green side up” where feasible, see photo below).
b. The existing sedge strip at the water’s edge on the left bank of Casner Creek
(see photo above) will be retained as much as possible. During berm removal, there is expected to very limited disturbance at the water’s edge.
c. Berm material will be transported and deposited in the tailings borrow pit between Casner Creek & Bear Valley Creek. Passes by the excavator and dump truck will be concentrated and limited to a designated route.
Berm vegetation
Sedge strip at water’s edge.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 6
3. Biolog structures:
Up to 12 biolog check dams would be installed at several locations throughout the reach. The biolog mini check dams would be installed to begin to raise the channel bed elevation. The biolog check dams would be installed with an excavator and by hand.
4. Revegetation: plant sedges, willow clumps.
Sedge mats and willows will be transplanted with an excavator from locations approved by the Botanist in the Casner Creek floodplain to the Casner Creek streambank where excavation or disturbance has created a need for revegetation.
Data available: A full topographical survey was conducted, using a total station, in 2000 and 2005, with additional high flow data collected in 2006.
C2 PROJECT LOCATION
The project area is located on Casner Creek, a tributary to Bear Valley Creek in the Middle Fork Salmon River drainage. The stream is located on the Lowman Ranger District of the Boise National Forest. Please see Vicinity Map (attachment1).
This project involves approximately 0.5 mile of Casner Creek, from approximately 0.10 mile downstream of the 582 road crossing downstream approximately 0.5 mile. It is estimated that approximately 100 feet on either side of the existing Casner Creek channel may be affected by the implementation of this project with ground-disturbing activities.
C.3 SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required.
The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. All equipment shall be free of oil, gas or fluid leaks. Equipment will be inspected before arriving on site to ensure cleanliness to prevent spills into the waterways and to prevent the spread of noxious weeds. In addition, a spill containment kit commensurate with the amount of fuel stored in the vehicles will be required onsite.
C5 TRAFFIC CONTROL AND CONSTRUCTION SIGNING RESERVED
C6 WORK CAMPS, STAGING AND STORAGE AREAS
Camping on National Forest Lands, on or near the job site, must be approved in writing by the Lowman District Ranger. If the contractor chooses to camp, a permit would be issued and the contractor would be expected to follow the permit requirements. A final inspection of the campsite would be conducted by a contract inspector or the COR prior to receiving the final payment.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 7
C7 INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
C8 START DATE
The approximate start date for the project is August 2, 2010. All in channel and streamside work MUST be completed August 30, 2010.
C9 RESERVED
C10 TECHNICIAL REQUIREMENTS
Equipments Requirements: The excavator operator must be skilled and excavator must have adequate equipment (i.e. bucket with thumb) to perform fine-scale work near a stream. (Fine-scale work in this context would be similar to finished landscaping). Removal of the berm material will include carefully removing (and setting aside for replacement) the top layer of sod from the berm. It is estimated that at least 1 excavator, at least 1 dump truck and at least 2 operators will be needed. The excavator should be tracked with a minimum of 90 horsepower, minimum bucket size of 0.5 cubic yard and equipped with a hydraulic thumb for placement of boulders. The dump truck should have a minimum capacity of 10 cubic yards.
The contractor is expected to provide the necessary heavy equipment and operators needed to complete the work as described above and as summarized below:
1. Remove approximately 1,500 cubic feet of berm material and transport material to an identified storage location, under direction of a Forest Service Representative. Grade waste material at storage location to fill in borrow site.
2. Construct up to 12 bio-log check dams, under direction of a Forest Service Representative.
3. Excavate and transplant identified shrubs, under the direction of a Forest Service Representative.
C11 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C12 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 8
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 9
SECTION E--INSPECTION AND ACCEPTANCE
E1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-12 Inspection of Construction (AUG 1996)
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 10
SECTION F--DELIVERIES OR PERFORMANCE
F1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than AUGUST 30, 2010 The time stated for completion shall include final cleanup of the premises. All in channel and streamside work MUST be completed August 30, 2010.
AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996)
Within 10 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is 40.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 11
SECTION G--CONTRACT ADMINISTRATION DATA
G1 AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held at a date and time to be determined.
G2 GOVERNMENT-FURNISHED PROPERTY There is a FAR Clause that addresses this topic
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
The government will furnish bio-logs, boulders and revegetation material.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 12
SECTION H--SPECIAL CONTRACT REQUIREMENTS
{For this Solicitation, there are NO clauses in this Section}
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 13
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-9 Personal Identity Verification of Contractor Personnel (SEP 2007) 52.215-8 Order of Precedence -- Uniform Contract Format (OCT 1997) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) (Applicable if contract exceeds
$10,000) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
(DEC 2007)
52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) http://farsite.hill.af.mil/� http://www.usda.gov/procurement/policy/agar.html�
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 14
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
Alternate I (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.246-12 Inspection of Construction (Aug 1996
Alternate I (APR 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-77 Emergency Response (NOV 1996)
I2 52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 15
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
http://fedgov.dnb.com/webform�
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 16
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 17
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
I3 FAR 52.225-9 Buy American Act-Construction Materials (FEB 2009)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
http://www.ccr.gov/�
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 18
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 19
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 20
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 21
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Pages Exhibit 1 Casner Maps and Figures 5
Exhibit 2 Davis Bacon Wager Determination 8
No. ID20080012, dated 4/16/10
Exhibit 3 Fire Precautions 2 tu55 tu21 tu17 tu21tu55
Boise
Stanley
Cascade
0 10 20 30 405 Miles
Major Roads
" City
Casner Creek Restoration
Lowman Ranger District
Boise National Forest
Idaho Boise National Forest Lowman Ranger DistrictCasner Creek
Restoration
Vicinity Map Casner Creek Restoration Project
Casner Creek
Be ar
V al le y
C re ek
C as ne r C re
To Stanley ek Project reach
To Whitehawk Lookout
Casner Creek "Complete" BEHI Analysis Middle Cross Section - surveyed on 07/13/09
Left Bank Height (bermed side) 2.5 (ft) Right Bank Height 2.5 (ft) Bankfull Height 2.5 (ft) Average Rooting Depth 1.0 (ft) Bank Angle (bermed side): 24 (degrees) x 4.60 y 2.01 z 5.02
Notes:
BEHI BEHI
Score Category
Bank Height/Bankfull Height 1.0 1.45 Very Low Root Depth/Bank Height 40% 4.95 Moderate Root Desity 90% 1.45 Very Low Bank Angle 24 2.95 Low Surface Protection 90% 1.45 Very Low BEHI Totals 12.25 Low
Photo: Middle cross section looking downstream
Banks are fully vegetated with grass, sedges, and forbs at this location.
XS Middle - Proposed Conditions
5997.0
5997.5
5998.0
5998.5
5999.0
5999.5
6000.0
6000.5
6001.0
6001.5
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Station (ft) - from left bank
E le va ti o n ft ar b it ra ry ve rt ic al d at u m
Left Bank Right Bank x y z
Analysis Bankfull Water Surface ElevationRemove Top of Berm
Existing Ground
Proposed Ground
Exhibit 9B. BEHI Analysis for Proposed Conditions Bankfull Height of 2.5 Feet Casner Creek Restoration Technical Memorandum
Casner Creek "Complete" Method BEHI Analysis
Exhibit 10. Restoration Alternative 2 Biolog Details Middle Reach (Bermed Reach) Casner Creek Restoration Technical Memorandum
Exhibit 10. Restoration Alternative 2 Biolog Details Middle "Bermed" Reach Casner Creek Restoration Technical Memorandum
Note:
Exact location of biologs are not shown on Exhibit 9 and will be determined during construction.
Casner Creek "Complete" BEHI Analysis Middle Cross Section - surveyed on 07/13/09
Left Bank Height (bermed side) 2.5 (ft) Right Bank Height 2.5 (ft) Bankfull Height 2.5 (ft) Average Rooting Depth 1.0 (ft) Bank Angle (bermed side): 24 (degrees) x 4.60 y 2.01 z 5.02
Notes:
BEHI BEHI
Score Category
Bank Height/Bankfull Height 1.0 1.45 Very Low Root Depth/Bank Height 40% 4.95 Moderate Root Desity 90% 1.45 Very Low Bank Angle 24 2.95 Low Surface Protection 90% 1.45 Very Low BEHI Totals 12.25 Low
Photo: Middle cross section looking downstream
Banks are fully vegetated with grass, sedges, and forbs at this location.
XS Middle - Proposed Conditions
5997.0
5997.5
5998.0
5998.5
5999.0
5999.5
6000.0
6000.5
6001.0
6001.5
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Station (ft) - from left bank
E le va ti o n ft ar b it ra ry ve rt ic al d at u m
Left Bank Right Bank x y z
Analysis Bankfull Water Surface ElevationRemove Top of Berm
Existing Ground
Proposed Ground
Exhibit 9B. BEHI Analysis for Proposed Conditions Bankfull Height of 2.5 Feet Casner Creek Restoration Technical Memorandum
Casner Creek "Complete" Method BEHI Analysis
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 27
EXHIBIT 2
General Decision Number: ID100012 04/16/2010 ID12 Superseded General Decision Number: ID20080012 State: Idaho
Construction Type: Heavy
Counties: Adams, Bear Lake, Benewah, Bingham, Blaine, Boise, Bonner, Bonneville, Boundary, Butte, Camas, Caribou, Cassia, Clark, Clearwater, Custer, Elmore, Franklin, Fremont, Gem, Gooding, Idaho, Jefferson, Jerome, Kootenai, Latah, Lemhi, Lewis, Lincoln, Madison, Minidoka, Nez Perce, Oneida, Owyhee, Payette, Power, Shoshone, Teton, Twin Falls, Valley and Washington Counties in Idaho.
HEAVY CONSTRUCTION PROJECTS
Supersedes General Decision ID020030001
Modification Number Publication Date 0 03/12/2010 1 04/16/2010
CARP0001-010 09/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES
Rates Fringes
CARPENTER (Including Cement Form Work)....................... $ 26.06 10.56
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee.
WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 28
CARP0808-004 01/01/2010
ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA,
CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE
46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA,
OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES
ZONE 1
Rates Fringes CARPENTER (Including Cement Form Work)....................... $ 26.57 8.10
ZONE PAY:
ZONE 1 0-30 MILES: FREE
ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR
ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR
If a project is located in more than one zone the lower zone rate shall apply
ZONES SHALL BE MEASURED FROM THE FOLLOWING U.S. POST OFFICES:
BOISE: 304 N. 8TH STREET
TWIN FALLS: 253 2ND AVE. WEST
POCATELLO: CLARK STREET
IDAHO FALLS: 875 NORTH CAPITAL AVE.
* ELEC0073-007 01/01/2010
IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY
Rates Fringes
CABLE SPLICER $ 28.62 3%+12.98
ELECTRICIAN $ 28.37 13.98
* ELEC0073-008 01/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES
Rates Fringes Cable Splicer $ 28.62 3%+12.98
ELECTRICIAN $ 28.37 13.98
ELEC0291-007 01/01/2009
ADAMS, BOISE, ELMORE, GEM, PAYETTE, VALLEY AND WASHINGTON COUNTIES
Rates Fringes
CABLE SPLICER
Adams, Valley and Washington Counties $ 35.79 3%+$10.00 Boise, Elmore, Gem and
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 29
Payette Counties $ 32.50 3%+$10.00
ELECTRICIAN
Adams, Valley and Washington Counties $ 32.54 3%+$10.00 Boise, Elmore, Gem and Payette Counties $ 29.54 3%+$10.00
ELEC0449-001 06/01/2009
BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER, FRANKLIN,
FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA, POWER AND TETON COUNTIES
Rates Fringes
ELECTRICIAN
All remaining counties...... $ 27.00 5.5%+$10.00 Fremont and Teton Counties.. $ 24.58 $9.10
ELEC0449-006 07/01/2009
BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND TWIN FALLS
COUNTIES
Rates Fringes
ELECTRICIAN $ 23.00 5.5% + $8.90
ENGI0370-013 01/01/2010
ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE, CARIBOU, CASSIA,
CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE
46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA,
OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES
ZONE 1
(Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)
Rates Fringes Power equipment operator -bulldozer Including all attachments $ 25.59 9.60 Power equipment operator crane Over 50 tons................ $ 25.96 9.60 Tower Crane Operator........ $ 25.96 9.60 Up to and including 50 tons. $ 25.59 9.60 Power equipment operator - oiler $ 24.57 9.60 Power equipment operator - scraper
ALL SCRAPERS UP TO AND
INCLUDING 40 YARDS $ 25.59 9.60
All scrapers, pulling wagons, belly dumps and attachments, over 40 yards
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 30 to and including 60 yards $ 25.31 9.60 Elclid and similar, pulling wagons, belly dumps and attachments, over 60 yards to and including 80 yards $ 25.96 9.60 Euclid and similar, pulling wagons, belly dumps and attachments, over 80 yards to and including 100 yards $ 26.42 9.60 Euclids and similar, pulling wagons, belly dumps and attachments, over 100 yards $ 26.67 9.60
ZONE PAY:
ZONE 1 0-30 MILES: FREE
ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR
ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR
If a project is located in more than one zone the lower zone rate shall apply
ZONES SHALL BE MEASURED FROM THE FOLLOWING U.S. POST OFFICES:
BOISE: 304 N. 8TH STREET
TWIN FALLS: 253 2ND AVE. WEST
POCATELLO: CLARK STREET
IDAHO FALLS: 875 NORTH CAPITAL AVE.
BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale
NOTE: When the crane operator receives additional pay for long boom, the Oiler shall also receive such additional pay. In computing the length of the boom on Tower Cranes, they shall be measured from the base of the tower to the point of the boom.
ENGI0370-014 06/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES
ZONE 1: (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification) Rates Fringes Power equipment operator - bulldozer (D-6 & equivalent and over) $ 25.29 11.05 (To D-6 or equivalent) $ 24.69 11.05
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 31
Power equipment operator - crane
25 TONS AND UNDER (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE) $ 25.01 11.05
85 TONS AND OVER, AND ALL
CLIMBING, OVERHEAD, RAIL
AND TOWER. $ 26.66 11.05
OVER 25 TONS UP TO AND
INCLUDING 45 TONS (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE) $ 25.29 11.05
OVER 45 TONS TO BUT NOT
INCLUDING 85 TONS (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE). $ 25.56 11.05
Power equipment operator - oiler $ 24.85 11.05 Power equipment operator - scraper (All, Rubber-Tired). $ 25.29 11.05 (Multiple engine with three or scrapers) $ 25.56 11.05
Zone Differential (Add to Zone 1 rate): Zone 2- $2.00
BASE POINTS: Spokane, Pasco, Washington; Lewiston, Idaho
Zone 1: Within 45 radius miles from the main post office Zone 2: Outside 45 radius miles from the main post office
BOOM PAY: (All Cranes, including Tower) 180' to 250' $.50 over scale Over 250' $.80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
IRON0014-009 07/01/2009
ADAMS (REMAINDER OF COUNTY), IDAHO (SOUTH OF THE 46TH PARALLEL), LEMHI
(NORTHWEST CORNER), VALLEY (NORTHEASTERN 1/3) AND WASHINGTON
(NORTHWESTERN 1/2) COUNTIES
Rates Fringes
Ironworkers: Rebar, Structural, Fence Erector $ 30.79 17.40
IRON0014-010 07/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
Rates Fringes Ironworkers: Rebar, Structural, Fence Erector. $ 30.79 17.40
IRON0732-005 06/01/2009
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 32
ADAMS (EAST CORNER), BEAR LAKE, BINGHAM, BLAINE, BOISE, BUTTE, BONNEVILLE,
CAMAS, CARIBOU, CASSIA, CLARK, CLUSTER, ELMORE, FRANKLIN, FREMONT, GEM,
GOODING, JEFFERSON, JEROME, LINCOLM, LEMHI (REMAINDER OF COUNTY), MADISON,
MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY
(SOUTHEAST 2/3), AND WASHINGTON (SOUTHEAST 1/2) COUNTIES
Rates Fringes
Ironworkers: Rebar, Structural, Fence Erector. $ 24.74 13.86
LABO0155-003 01/01/2010
ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE, CAMAS, CARIBOU,
CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH
OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA,
ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON
COUNTIES
ZONE 1 (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification) Rates Fringes
Laborer: General/Cleanup $ 22.68 10.90
ZONE PAY:
ZONE 1 0-30 MILES: FREE
ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR
ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR
If a project is located in more than one zone the lower zone rate shall apply
ZONES SHALL BE MEASURED FROM THE FOLLOWING U.S. POST OFFICES:
BOISE: 304 N. 8TH STREET
TWIN FALLS: 253 2ND AVE. WEST
POCATELLO: CLARK STREET
IDAHO FALLS: 875 NORTH CAPITAL AVE.
LABO0238-013 06/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES
ZONE 1 Rates Fringes
Laborer: General/Cleanup $ 22.66 8.75
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
AG-0261-S-10-0074 Casner Creek Stream Rehabilitation Project Page 33
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
SUID2003-007 09/03/2003
Rates Fringes Cement Mason/Finisher. $ 20.22 7.98 LABORER: Tamper $ 8.00 2.84 Pipe layer $ 14.26 0.00 Power equipment operator - backhoe $ 18.96 4.42 Power Equipment Operator (Gradall) $ 22.84 3.62 Power Equipment Operator (Loader) $ 21.33 3.43 Power Equipment Operator Excavator $ 20.24 0.00 TRUCK DRIVER (6 Axle Dump) $ 24.70 3.90 Truck Driver, Dump $ 17.82 0.00 TRUCK DRIVER: Water Truck $ 20.89 4.06 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those…
This is the start of the file's text. The full file is on GovTribe.