Sawmill Creek Campground Special Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Sawmill Creek Campground Reconstruction, newest first.
File Type Posted
Atch5_AppC-HazardTree.pdf PDF
Atch3_AppA-Grill-2_2032_b2.pdf PDF
Atch6_ConstWR_GnlDec_AK1_M7_21Apr2017.pdf PDF
Atch3_AppA-FireRings_fs_30_18.pdf PDF
AG0120S170020SawmillCrkCG_RFP.pdf PDF
Atch3_AppA-Table-XTE-6EXP-V.pdf PDF
Atch3_AppA-Wheelstops.pdf PDF
Atch1_SawmillCrkCGCombinedDrawings09142115.pdf PDF
Atch4_AppB-Sign_Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0120-S-17-0020 Attachment 2, Special Project Specifications

SECTION 01111

MOBILIZATION

A. PART 1 - GENERAL

1.1 DESCRIPTION

A. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.

1.2 PAYMENT

A. Pay for the accepted work at the contract unit price for the PAY ITEM shown in THE

SCHEDULE OF ITEMS.

B. Make progress payments for mobilization as follows:

1. Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

2. When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

3. When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

4. Pay any unpaid amount for mobilization upon final acceptance of all work items.

END OF SECTION

SECTION 01330

SUBMITTALS

PART 1 - GENERAL

1.1 SUBMITTAL PROCEDURES

A. Provide submittals in timely manner to ensure sufficient time to complete all required reviews prior to required construction window. Allow 10 workdays for review. If a submittal is rejected, a resubmittal is required, and the time for review is restarted.

B. Submit all design submittals in electronic PDF format.

PART 2 – PRODUCTS

None

PART 3 – EXECUTION

3.1 MATERIAL SUBMITTALS

A. Provide manufacturer supplied cut sheets and installation submittals for all commercial items to including but not limited to: the culverts, toilet structure, metal roofing, benches, wood finish stains, picnic tables, signs, powder coating for shelter work, etc.

B. For the toilet, provide manufacturer’s installation instructions and specifications and manufacturer’s completed cost worksheet and order form showing all options, colors, etc. to obtain approval prior to ordering the unit.

C. Wildflower seed label and weed-free certification.

3.2 SIGN SUBMITTALS

A. Provide manufacturer prepared scale illustrations for each sign for approval prior to fabrication.

3.3 EROSION CONTROL PLAN

A. Obtain approval of erosion control plan prior to start of work.

3.4 METAL GATE

A. Provide shop drawings for metal gate with 16’ opening based on City’s Gate at bottom of Blue Lake Road.

SECTION 01331

CONSTRUCTION LAYOUT

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes the layout of the project for construction.

None

3.1 PROJECT LAYOUT

A. Layout to be by a Registered Land Surveyor from the electronic AutoCad drawings (provided). A Point Table showing survey control point coordinates is shown on the Existing Conditions Plan; however some or all of these points may have been removed by recent construction activity.

B. Provide all survey work necessary to lay out the work according to the plans and specifications. Provide vertical control for all work based on the grading plan or as staked by the Government.

C. Where inconsistencies with survey and/or proposed work are noted, contact CO for clarification.

D. After clearing, grubbing and rough grading of the roadway, parking areas and pads, field stake the grades of the vault toilet, picnic shelter, fire ring, culverts, bridge, the stone blanket toe and shoulder and other features. Obtain approval of staking before proceeding with work. The CO may make minor changes to the layout and site grading at this time to better fit the site. If adjustments are made, provide survey and staking of the revised plan to ensure its full implementation.

E. There are existing conduits buried under the Campground Road that must be protected from damage. Locate and mark the conduit/s in the project area prior to commencing construction. Notify the CO prior to commencing excavation in the vicinity of the 36” culvert under the Campground Road. Avoid disturbance of the conduit. If there are conflicts between the specified elevations of the culvert and the conduit/s, notify the CO prior to continuing work.

F. The CO will field stake the locations of boulders “A and B”.

SECTION 02230

CLEARING AND GRUBBING

Part 1 - GENERAL

1.1 Summary

A. This section specifies clearing, grubbing, removing, and disposing of all vegetation and debris within the clearing limits except objects designated to remain. Work also includes thinning of trees in designated areas and clearing snags and unstable trees.

B. Clearing Limits.

1. Clearing limits for brush and for trees 6” in diameter and under are 4 feet from the edge of all pads, trails, roads and pathways. Retain all trees within this area over 6” in diameter unless marked for removal.

Part 2 - PRODUCTS (not used)

Part 3 - EXECUTION

3.1 Surface Preparation

A. Clearing.

1. Clear all trees, brush and other objects not designated to remain.

B. Grubbing.

1. Grub stumps, shrubs, brush, and roots within the excavation limits unless tree roots are designated to be protected.

3.2 Hazard Tree Removal

A. Hazard Tree

1. Clear all snags and hazard trees which are marked for removal outside the clearing limits.

2. Protect trees over 6” diameter by not disturbing the area within their root zone.

3.3 Debris Disposal

1. Place all unsuitable excavation material and clearing debris in the approved waste site. Place suitable firewood in log form at approved location.

2. Cut alders 4” diameter and over into 8 foot lengths and stockpile at material storage site.

3.4 Stockpile Topsoil

1. Approximately 7,500 square feet of vegetated area is proposed to be disturbed.

Stockpile removed topsoil for re-use on site. Use soil around picnic areas, pads and parking areas as available.

3.5 Waste Site

1. The designated site to dispose of waste materials is at the intersection of the

Blue Lake Road and the Sawmill Creek Campground Road in a location that has been previously used as a waste site. At the completion of work, cover with soil and grade to a neat appearance.

3.6 Clearing

A. Do not remove any trees or other vegetative material outside the grading limits without approval.

3.7 Protection of Existing Trees

A. Do not operate or store equipment or materials within the drip lines of live trees.

3.8 Tree Pruning

A. Limb trees with clean cuts made flush with the outside edge of the branch collar.

B. Spur Road to Day Use Site and Parking Areas: Limb branches to 14’ above grade.

C. Picnic Areas: Limb branches to 8’ above grade

SECTION 02410

DEMOLITION

A. Section includes demolition of portions of existing roadways, the vault toilet and pad, and removal of site amenities. Specified camping pads will be abandoned to return to a natural condition in time. Restoration/relocation of certain signs is included.

A. None

3.1 VAULT TOILET AND PAD

A. Pump the vault empty.

B. Structure, vault, toilet and pad to be removed completely and disposed of off-site.

C. Fill the hole from the vault and pad with excess excavated material. Top 4 inches to be topsoil material.

3.2 DISPOSITION OF DEMOLISHED/RELOCATED MATERIALS

A. Roadways and Pads: For specified roadways and pads not used in the proposed work, surface with excess site topsoil to grades as shown on the drawings.

B. Signs and Signposts: Protect from damage to items and paint finishes. Relocate as shown on drawings and specifications.

C. Picnic Tables and Fire rings: Dispose at an off-site location.

D. Other: Dispose any other demolished materials at an offsite location.

SECTION 02800

SITE IMPROVEMENTS AND AMENITIES

A. This Section includes metal picnic tables, grills, fireplace rings and wheel stops.

A. Metal Picnic Table: As provided by Pilot Rock (www.pilotrock.com). Model: XT/G-

6VW/E 6-foor wheelchair accessible table extended one end with V-type thermoplastic coated expanded steel top and seats. Galvanized steel supports, 6 foot length of benches, 8 foot length of top, thermoplastic coating in brown color for table top and seats.

B. Fire Ring: As provided by Pilot Rock (www.pilotrock.com). FS 30 series wheelchair accessible fire ring.

C. Grill: As provided by Pilot Rock (www.pilotrock.com). Model N2-2032 twin grate accessible fire grill.

D. Wheel stop: As provided by Rubber form (www.rubberform.com). RF-PWS38, Color - black, 14” rebar, or approved equivalent.

See Manufacturers’ Specifications in Appendix A.

A. Metal Picnic Table: Install per manufacturer’s recommendations B. Fire Ring: Install per manufacturer’s instructions. Set in 8 inch diameter by 24 inches deep minimum concrete footings. If impact on roots of trees to be protected may occur, contact the CO for direction.

C. Grill: Install per manufacturer’s instructions. Set pole 14 inches deep in 36 inches deep concrete footing

D. Wheel stop: Install per manufacturer’s instructions.

SECTION 02920

SOIL, SEEDING AND TRANSPLANTING

PART 1- GENERAL

A. This section covers planting soil, seeding and transplanting. The seeded area is approximately ¾ acres in size, and includes the areas around the dry creek bed, new trails, picnic areas, group campsite and parking lots.

PART 2 - MATERIALS

2.1 SEED

A. Native grass seed mix to be provided by Government. Certified seed mixture to contain no more than 0.01% other seed to reduce the risk of invasive plants.

2.2 SOIL

A. Soil (provided at off-site location): Government to confirm that soil is certified weed free, contaminant free and from a known source. Soil to be free of all non-natural materials and free of rocks larger than 4” in any direction. Soil to support growth of native grass seed and transplanted alder plugs.

2.3 ALDERS AND EVERGREEN TREES

A. Alder saplings and small evergreen trees (3 feet high and less) shall be transplanted from on site locations as approved.

PART 3 - EXECUTION

3.1 TIMING

A. Apply seeds between May 15 and September 15.

3.2 APPLICATION METHOD

A. Apply seed at a rate of 25 lbs/acre.

B. Apply seed by broadcasting onto the finished and approved soil surface and into the soil by light raking.

3.3 TRANSPLANTING METHOD

A. Saplings to be removed from source areas at the time new locations are ready for planting.

B. Plants are to be planted immediately after removal from previous location.

C. Plants are to be carefully removed, preserving roots and, if possible, root ball with soil. Dig hole 6 inches deeper than height of rootball or roots and fill bottom 6 inches with planting soil.

Fill around plant roots with planting soil.

D. Plants are to be planted with the top of rootball in same relationship to finish grade as in original location.

E. Plants to be watered immediately after transplanting.

3.4 SOIL PREPARATION

A. Prepare soil as follows:

1. Scarify subgrade surface prior to placing soil.

2. Apply topsoil to a minimum depth of 4 inches over the scarified subgrade.

3. Lightly compact the topsoil as it is being placed. Remove any irregularities in the surface. The finished soil surface shall be at the identified grades and at an even fall for positive drainage.

4. Provide light application of 10-10-10 fertilizer after seed germination.

END SECTION

SECTION 03300

CAST-IN-PLACE CONCRETE

A. This section of the specifications covers the requirements for furnishing and installing cast-in-place concrete footings and slabs on grade, including formwork and reinforcement, in conjunction with notes as shown on Drawings.

1.2 REFERENCE SPECIFICATION

A. ACI 301-05 - Standard Specifications for Structural Concrete.

B. International Building Code (IBC) - Chapter 19.

C. American Society for Testing and Materials (ASTM).

1.3 QUALITY ASSURANCE

A. Concrete shall be supplied by a commercial ready-mix firm.

B. Mix design and trip tickets shall be provided at time of placing and then retained for the files.

1.4 TESTING

A. Compressive Strength Tests:

1. Obtain samples and conduct tests in accordance with ACI 301 Section 1.6.4.

2. One (1) set of three (3) cylinders per set shall be cast for testing for the concrete slabs, unless the slabs are placed on separate days, in which case one set of three cylinders shall be cast for each slab.

3. For each specified test: Cure one (1) cylinders for 28-day test age. Test one (1) cylinder at seven days, test one (1) cylinders at twenty-eight days, and hold one (1) cylinder in reserve. After fifty-six days, unless notified to the contrary, the reserve cylinder may be discarded without being tested for specimens meeting 28-day strength requirement.

4. Acceptance. Strength is satisfactory when:

i. The average of all tests equal or exceed the specified strength

ii. No individual test falls below the specified strength by more than 500 psi.

B. Slump Test:

1. Obtain samples and conduct slump tests in accordance with ASTM C143/C143M. Take concrete samples during concrete placement. Perform test at commencement of concrete placement and when test cylinders are made.

C. Air-Entrainment Test:

1. Obtain samples and conduct air-entrainment tests in accordance with ASTM C173/C173M. Test for air content at commencement of concrete placement and when test cylinders are made.

2.1 FORM MATERIALS

A. Conform to ACI 301 Section 2 - Formwork and Form Accessories.”

B. Removal of Forms shall conform to ACI 301 Section 2.3.2 except strength indicated in ACI 301 Section 2.3.2.5 shall be 0.75 f’c.

D. Forms: Steel, wood, or other suitable material of size and strength to resist movement during concrete placement. Use straight forms, free of defects. Use flexible spring steel forms or laminated boards to form curved edges.

E. Steel Pipe: meet AASHTO M 36 and M 218. 0.064 inch thick, 2-2/3” x 1/2” engineered corrugations.

F. Sonotube® round cast in place concrete column forms shall be as manufactured by Sonoco, 1 North Second Street, Hartsville, SC, 29550. 1-888-766-8823, www.sonotube.com.

2.1 WELDED WIRE FABRIC

A. Welded wire fabric shall conform to ASTM A 185. Provide flat sheets, rolls not acceptable.

2.2 REINFORCING BARS.

A. Furnish deformed, grade 60 bars conforming to AASHTO M 31.

2.3 CONCRETE MIXTURES

A. Conform to ACI 301 Section 4 - Concrete Mixtures.

B. Provide concrete mixes conforming to the following requirements:

Member Type/Location

STRENGTH

(psi)

TEST AGE

(days)

MAX.

AGGREGATE

MAX W/C

RATIO

AIR

CONTENT

ALL CONCRETE 3000 28 1” 0.45 6%

C. Mix Design Notes

1. Water Cement (W/C) ratio: Water-cementitious material ratios shall be based on the total weight of cementitious materials. Ratios not shown in the table above are controlled by strength requirements.

2. Cementitious content: The use of fly ash, other pozzolans, silica fume, or slag shall conform to ACI 301 Sec 4.2.2.8.B. Maximum amount of fly ash shall be 20% of total cementitious content unless reviewed and approved otherwise.

3. Air content: Conform to ACI 301 Section 4.2.2.4. Horizontal exterior surfaces in contact with the soil require entrained air. Use “Severe Exposure”. Tolerance is ±1-½%. Air content shall be measured at point of placement.

4. Slump: Conform to ACI 301 Section 4.2.2.2. Slump shall be determined at point of placement.

5. Chloride Content: Conform to ACI 301 Section 4.4.1 and Table 4.1.1 for “Other Reinforced Concrete Construction.”

6. Non-Choride Accelerator: Non-chloride accelerating admixture may be used in concrete slabs placed at ambient temperatures below 50ºF at the Contractor’s option.

2.4 CONCRETE MATERIALS

A. Portland Cement: Portland cement shall conform to ASTM C150, Type I or Type II. The cement shall be of the same brand and type and from the same plant of manufacture.

http://www.sonotube.com/

B. Aggregate: Conform to ASTM C33. Aggregates shall be free from any substance that may be deleteriously reactive the alkalis in the cement and in a sufficient amount to cause excessive expansion of the concrete.

C. Fly Ash: Pozzolanic mineral admixture conforming to ASTM C618, Class F. Maximum loss on ignition to be 1%. Use fly ash from one single source for the whole project. When fly ash is used, the maximum amount shall be 30% weight of the total cementitious materials, unless otherwise noted.

D. Admixtures: Use of admixtures shall be the responsibility of the Contractor. When more than one admixture is used in the mix, furnish satisfactory evidence that the admixtures to be used are compatible in combination with the cement and aggregates. Provide only one brand of each type of admixture. Accelerating admixtures shall not be used. Unless approved, admixtures shall be free of calcium chloride and thiocynate (no more than 0.05% chloride ions). The following types of admixtures are approved:

1. Air-Entrainment Admixture: Master Builders “Micro-Air,” Grace “Davavair,” Sika “AEA- 15,” or approved equal conforming to ASTM C260.

2. Water reducing Admixture (Low Range): Master Builders “Pozzolith 322-N,” Grace “WRDA with Hycol,” Sika “Plastocrete 161,” or approved equal conforming to ASTM C494, Type A.

3. Water reducing Admixture (High Range): Master Builders “Rheobuild 1000,” Grace “WRDA-19,” Sika “Sikament 86,” or approved equal conforming to ASTM C494, Type F.

2.5 ACCESSORIES

A. Form Release Agent: Colorless material which will not stain concrete, absorb moisture or impair natural bonding or color characteristics of coating intended for use on concrete;

Release #1, or Crystal Release as manufactured by Burke Concrete Accessories or approved equal.

B. Polyurethane Joint Sealer shall conform to ASTM C 920.

3.1 FOOTING EXCAVATION AND BEDDING

A. Excavate footings to depths as indicated and in conformance with requirements of Section 31230.

B. Footing excavations require review and approval prior to construction of concrete formwork.

3.2 FORMWORK

A. Conform to requirements of ACI 301 Section 2 -Formwork and Form Accessories.

3.3 WELDED WIRE FABRIC PLACEMENT

A. Conform to requirements of ACI 117. Extend welded wire fabric to within 2 inches of the concrete edge. Lap edges and ends of fabric sheets a minimum of 8 inches. Support welded wire fabric during placing of concrete to ensure required position in slab. Do not place welded wire fabric on subgrade and subsequently raise into position in concrete.

3.4 CONCRETE PLACEMENT

A. Preparation

1. Do not place concrete until all related submittals are approved.

Remove snow, ice, frost, water, and other foreign materials from form surfaces, reinforcement, and embedded items against which concrete is to be placed.

2. Place concrete on properly prepared and unfrozen subgrade and only in dewatered excavations and forms.

3. Do not allow mud or foreign materials into the concrete during placement operations.

4. When the ambient temperature necessitates the use of cold or hot weather concreting, make provisions in advance of concrete placement.

5. Do not begin placing concrete when the sun, heat, wind, or limitations of facilities furnished by the Contractor prevent proper consolidation, finishing and curing.

6. Do not begin placing concrete while rain, sleet, or snow is falling unless adequate protection is provided. Do not allow rainwater to increase mixing water or to damage the surface of the concrete.

B. Installation of Embedded Items

1. Position and secure in place expansion joint material, anchors, and other structural and non-structural embedded items before placing concrete. Contractor shall coordinate placement of all embedded items shown on the Drawings.

C. Reinforcing steel

1. Conform to the following cover requirements from ACI 301, Table 3.3.2.3, unless noted otherwise on the drawings. Concrete cast against earth – three inches, except as noted above for welded wire fabric. Concrete exposed to earth or weather – two inches.

2. Field bending. Conform to ACI 301 Section 3.3.2.8 – Field Bending or Straightening. Bar sizes #3 through #5 may be field bent cold the first time. Other bars require preheating.

Do not twist bars.

D. Concrete Measuring, Mixing, and Delivery

1. Conform to requirements of ACI 301 - Section 4.3.

E. Handling, Placing, Constructing and Curing Concrete

1. Conform to requirements of ACI 301 – Section 5.

3.5 FINISHES FOR UNFORMED SURFACES

A. General: Finish slab surfaces as described below. Finish all joints and edges with proper tools as approved.

B. Placement: Place concrete at a rate that allows spreading, straightedging, darbying or bullfloating before bleed water appears. Screed all slabs, topping fills to true levels and slopes. Work surfaces as required to produce specified finish. Do no finishing in areas where water accumulated; drain and re-screed. In no case use a sprinkling of cement and sand to absorb moisture.

C. Tolerances: Measure slabs-on-grade to verify compliance with the tolerance requirements of ACI 117 Section 4.5.7, Classification: Bullfloated. Measure floor finish tolerances within 72 hours after slab finishing.

D. Broom Finish: Immediately after concrete has received a floated finish; give the concrete a course transverse texture by drawing a stiff broom across the surface. Degree of texture shall be as approved.

3.6 CONCRETE CURING

A. Conform to the requirements of ACT 301 – Section 5.

SECTION 05500

METAL FABRICATIONS

A. Provide miscellaneous metal items, including metal gate, required for completion of the work as specified herein and in conjunction with notes on the drawings; include all bending, forming, rolling, cutting, and drilling of such items as necessary for installation and completion as specified.

1.2 RELATED WORK

A. Section 06100, Rough Carpentry

1.3 REFERENCE SPECIFICATION

A. AISC “Manual of Steel Construction, Allowable Stress Design (ASD), latest edition.

B. AISC “Code of Standard Practice for Steel Buildings & Bridges”, latest edition.

C. AWS D1.1-98 “Structural Welding Code –Steel”.

D. ASCE 3-84 “Standard for the Structural Design of Composite Slabs

E. American Society for Testing and Materials (ASTM).

F. The Society For Protective Coatings (SSPC), referenced standard.

1.4 STANDARDS

A. Building Code: Conform to requirements of International Building Code governing edition except as supplemented hereinafter.

B. AWS Code: Conform to American Welding Society Structural Welding Code, AWS D1.1.

C. Manual of Steel Construction by American Institute of Steel Construction, hereinafter called

AISC.

1.5 SUBMITTALS

A. Product Data: Submit manufacturer's published literature for specified products and accessories as applicable, including manufacturer's specifications, physical characteristics and performance data. Submit as a supplement, manufacturer's instructions and directions for application if not included in manufacturer's published literature.

B. Campground Gate: Submit detailed shop drawings.

1.6 QUALITY CONTROL

A. Fabricator: Experienced in the fabrication and working of metal, including cutting, rolling, bending, forming and finishing. Submit current AISC Certification for approval by Contracting Officer.

1.7 HANDLING

A. Shipping and Storage: Ship, store, and handle all items so as to protect all items from rust, misuse, and abuse; no bent or otherwise deformed items will be accepted; repair shop treatment as required before installation.

2.1 COATINGS

A. Steel Hardware: Where shown on the drawings, steel hardware components shall be hot-dipped in zinc after fabrication according to ASTM A 153/A 153M.

B. Steel Fabrications: Where shown on the drawings, steel fabrications shall be hot-dipped in zinc after fabrication according to ASTM A 123/A 123M. Tailings and sharp protrusions formed as result of the hot-dip process shall be removed and the edges shall be burnished.

Apply field touch-ups per reference specification. “Passivated” or “stabilized” galvanizing shall not be allowed for metal surfaces scheduled to receive paint.

C. Powder coat shelter truss plates with a system suitable for exterior use in Southeast Alaska’s maritime climate. Color: black.

3.1 FABRICATION

A. Conform to AISC Specification Sec. M2 “Fabrication” and AISC Code Sec. 6, “Fabrication and Delivery” and AISC Code Sec. 8 “Quality Control.” The fabricator and erector shall maintain a quality control program to the extent deemed necessary so that all of the work is performed in accordance with this Code, the AISC Specification and the contract documents.

3.2 WELDING

A. Perform welding by use of electric arc welding process. In making welded joints and joining component parts, for details of joints, technique of welding employed, appearance and quality of welds made, and the methods used in correcting defective work, conform to AWS D1.1.

3.3 INSTALLATION

A. Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions, and directions for installation of anchorages, such as concrete inserts, sleeves, and all-thread and miscellaneous items having integral anchors, which are to be embedded in concrete construction.

B. Galvanized Surfaces: Clean field welds, bolted connections and abraded areas and apply galvanizing repair paint to comply with ASTM A780.

SECTION 06100

ROUGH CARPENTRY

A. This section of the specifications covers the requirements for the picnic shelter, and picnic tables.

1.2 RELATED SECTIONS

A. Section 055000, Metal Fabrications

B. Drawing Set: Bridge Details: Sheets 19, 20 and 21

1.3 REFERENCES

A. Provide lumber graded in accordance with official grading rules of The Western Wood Products Association (WWPA) Western Lumber Grading Rules, West Coast Lumber Inspection Bureau (WCLIB), or National Lumber Grades Authority (NLGA).

In lieu of a grade stamp for Alaska Yellow Cedar and Western Red Cedar, the Contractor m a y submit a letter on company letterhead stating (1) the grade of the lumber and (2) that the lumber has been visually graded by a company employee who has held a grading certificate within the previous five years. Include a copy of the employee’s grading credentials with the letter.

B. International Building Code, current edition, Chapter 23 – WOOD.

C. American Society for Testing and Materials (ASTM).

1.4 HANDLING

A. Ship and store lumber to protect from exposure to moisture, store in dry location until incorporated into the work.

B. Handle lumber with rope slings. No cant dogs, peaveys, hooks or pike poles shall be used.

Use slings or other devices to protect corners of heavy construction timbers and banded packages of heavy construction timber.

2.2 TIMBER, LUMBER AND BOARDS

A. Lumber for Site Improvements

1. Picnic Shelter: Alaska Yellow Cedar, No. 1. Standard nominal dimensions except where special shapes are specified or indicated. Sizes as indicated on drawings. Select for appearance; no splits, warps, checks, or loose knots.

2. Picnic Tables: Alaska Yellow Cedar or Western Red Cedar, No. 1.

3. Moisture Content

i. Dimensional lumber less than 2”: kiln or air dried to a maximum moisture content of 19%.

ii. Dimensional lumber greater than 2”: unseasoned; air dried to ambient air moisture content.

2.3 METAL FASTENERS AND ACCESSORIES

A. Provide all necessary nails, screws, and bolts for proper installation of rough carpentry;

sizes and quantities as indicated. Unless otherwise noted, fasteners shall be of a size and type to suit application. Accessories shall include bolts with necessary nuts and washers, timber connectors, drift pins, dowels, nails, screws, straps and other metal fasteners.

B. Bolts shall be provided with washers under nut and head. Washers shall be provided under lag screw heads.

C. Common nails shall be round wire of standard form.

D. All bolts, screws, nuts, dowels, washers, nails, drift pins and all other fastening hardware shall be galvanized in accordance with ASTM A153.

2.4 ROOFING: STRUCTURAL STANDING SEAM STEEL ROOF PANELS

A. General: Structural standing seam sheet steel panels complying with ASTM E330.

Manufacturer: Metal Sales Manufacturing Corporation; Snap-Loc 24.

B. Basis of Design Product: Subject to compliance with requirements provide Metal Sales

Manufacturing Corporation; Snap-Loc 24.

C. Roofing shall be metal, 0.018-inch (26 gage) minimum, structural standing seam snap lock system roofing with matching ridge, eve, and gable flashing and fasteners. Provide roofing in precut lengths ready for installation. Color: Forest Green.

D. Product Options:

1. Panel Coverage: 24 inches (609.6 mm).

2. Rib Height: 3 inches (76.2 mm).

3. Material: Aluminum-zinc alloy-coated steel sheet, ASTM A 792, Class AZ50 coating designation, structural quality, Grade 50, 0.0236-inch minimum thickness.

4. Sealant: Factory-applied side lap sealant.

5. Attachment: Concealed clip designed for thermal movement.

6. Side Lap: Snap-together panel system.

7. Application: Applied over open framing or solid substrate.

8. Color: Forest Green

E. Roofing fasteners shall be as recommended by the roofing manufacturer.

1.5 UNDERLAYMENT

A. Roofing felt shall be 30 lb roofing felt, F.S. HH-R-595, Type 30A, Style A, (30-lbs/sq.) or ASTM D226, Type II.

3.1 GENERAL

A. Construct all items in locations and to elevations indicated on the plans, in conformance with details. Prepare subgrades, footings and foundations in accordance with applicable sections of these Specifications. Coordinate the work of all trades.

3.2 FASTENING

A. Nailing per IBC Table 2304.9.1 – Fastening Schedule unless indicated otherwise on Drawings. Use sufficient nails, drift pins, screws, and bolts to insure rigidity and permanence. Use framing anchors as shown on the drawings or where specified nailing is not possible. Make tight connection between members. Install fasteners without splitting wood; pre-drill as required.

B. Pre-drill for all lag screws using two diameters, one for the shank and one for the threads.

The lead hole for the shank is to be 1/16” diameter larger than the shank diameter and is to be bored to the depth of penetration of the shank. The lead hole for the threaded portion is to be 70% of the screw diameter as shown on the drawings and is to be bored at least to the length of the threads. Do not drive lag screws with a hammer.

C. Drill holes for bolts 1/16” larger than bolt diameter. Cut and peen all bolts after the nuts have been fully tightened, maximum 3/16”, touch up with galvanized paint.

D. Pre-drill holes for nails and spikes 75% of nail/spike diameter.

E. Bolts and screws shall be effectively tightened when installed and shall be re-tightened before final acceptance.

3.3 STRUCTURAL STANDING SEAM METAL ROOF PANEL INSTALLATION

A. General: Comply with panel manufacturer’s installation instructions including but not limited to special techniques, interface with other work, and integration of systems.

B. Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and using proper fasteners as recommended by panel manufacturer.

3.4 FRAMING

A. Carefully lay out and erect items. Install all work to required levels and lines, with members plumb, true to line, cut, and fitted.

B. Construct members of continuous pieces.

C. Fit to other construction; scribe and cope as needed for accurate fit.

D. Accurately cut and frame lumber in such manner that joints will have a close fit over the entire contact surfaces, except as noted otherwise in the drawings. No shimming will be permitted in making joints. Open joints not acceptable.

E. Align bolts and screws horizontally and vertically, countersink and plug where indicated.

Plug to be flush with adjacent surface.

3.5 CLEANING

A. Repair or replace any installed products that have been damaged.

B. Clean installed panels in accordance with manufacturer’s instructions.

3.6 PROTECTION

A. Protect products and finish surfaces from damage during construction.

SECTION 09930

STAINS AND TRANSPARENT FINISHES

A. Section includes exterior wood finish for picnic shelter.

1.2 SUBMITTALS

A. Submittal procedures to comply with Section 013300.

1.3 DELIVERY, STORAGE & HANDLING

A. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

PART 2 - PRODUCTS

1.1 WOOD FINISH

A. Provide Sikkens Cetol Log and Siding finish; COLOR: Natural, for SPECIFIED exposed wood surfaces.

3.1 APPLICATION

A. Exterior wood finish: Apply three coats, for exposed wood surfaces including posts, beams, rafters, blocking, etc. Apply in accordance with manufacturer’s directions.

Thoroughly saturate end grain of all finished members.

SECTION

10140 SIGNS

A. This work includes furnishing materials, labor and equipment necessary to install the signs. It also includes refurbishing and relocating existing signs.

1.2 QUALITY ASSURANCE

A. Sign Manufacturer:

1. Signs to be provided by: Rockart Signs and Markers (www.rockartsigns.com) or approved equivalent.

B. Submittals

1. Shop drawings for each sign to be provided for approval.

2.1 CUSTOM SIGNS

A. Sign type, materials and size shall conform to the requirements of EM-7100-15, Standards for Forest Service Signs and Posters", Chapter 7 - "Recreation Signs".

3.1 SIGN SCHEDULE

A. See Appendix B for the Sign Schedule and installation information.

http://www.rockartsigns.com/

SECTION 13126

VAULT TOILET

This work includes installation of a pre-manufactured vault toilet structure.

1.2 RELATED WORK

A. Section 01130, Submittals B. Section 03300, Cast in Place Concrete

PART 2 - PRODUCTS

2.1 CONCRETE

A. Concrete for footings, foundations and slabs per Section 03300.

2.2 VAULT TOILET

A. Provide vault toilet as manufactured by CXT Inc, 3808 N. Sullivan Road, Bldg. 7, Spokane, WA 99216, Ph (509) 921-8766; www.cxtinc.com as follows:

a. Model to be “Rocky Mountain Vault Restroom”, left hand building, vent on back wall (behind toilet riser).

b. Provide 2-tone color package of “Nuss Brown” walls and “Granite Rock” roof.

c. Roof to be “Cedar Shake” pattern, color: “Granite Rock”.

d. Top section of building to be “Horizontal Lap”

e. Bottom Section of Building to be “Napa Valley Stone”, color: “Natural Grey”.

f. Provide 2-tone paint touch-up kit option.

g. Provide the marine package option.

h. Door opener to be double pull/slide lock.

i. Provide “Raised Wet Hatch” option.

3.1 GENERAL

A. Carefully lay out, cut, fit together and erect all work. Install pre-manufactured equipment per manufacturers printed instructions.

B. Locate and orient building as detailed and shown on plans.

3.2 DRAINAGE AND GRADING

A. Excavate a 24” wide trench from the bottom of the vault excavation to daylight to provide positive drainage so the vault excavation does not hold water. Backfill the trench with drain rock as approved.

B. Set the finished floor elevation of the structure to provide positive drainage in all directions consistent with ADA standards.

http://www.cxtinc.com/

SECTION 31230

EXCAVATION AND FILL

A. This work shall consist of excavation and shaping of earth, rock and gravel in locations noted on the plans. Work includes excavation of drainage features, excavation of unsuitable material, embankment construction, excavation for footings and toilet vault, and disposal of excavated material necessary for the completion of construction.

2.1 EMBANKMENT MATERIAL

A. Provide material in accordance with FP-03.

3.1 CLEARING AND GRUBBING

A. Clearing and grubbing shall be accomplished before excavation or embankment placement begins.

3.2 EXCAVATION

3.2.1 Excavate as required to accommodate the new construction. Establish subgrade to an elevation below the finished grade to accommodate embankment and surfacing as specified and detailed on the plans.

3.2.2 Remove solid rock, if encountered, to depth as required to achieve required aggregate depths. Solid rock excavation is incidental to other work on the contract and no additional payment will be made.

3.2.3 Make excavations for posts to dimensions shown on the drawings. Take care not to disturb bottom of excavations.

3.3 UTILIZATION OF EXCAVATED MATERIALS

3.3.1 Approved excavated material shall be used in the construction of embankment, subgrade, bedding, and backfill for the structure.

3.3.2 Unsuitable material shall be excavated. Excavated areas shall be backfilled with embankment material when necessary to complete the work. Frozen material shall not be placed in embankments.

3.3.3 Stockpile excavated topsoil for use as planting soil.

3.3.4 Stockpile excavated shotrock that is suitable for use as base course.

3.4 OVERBUILDING AND LANDSCAPE PROTECTION

3.4.1 Confine excavation and embankment material to within the clearing limits to protect the native landscape.

3.5 GRADING

3.5.1 Uniformly grade areas within all work areas and establish natural transitions to adjacent undisturbed surfaces as approved. Finish surfaces free from irregularities and abrupt changes in grade.

3.5.2 Grade surface under concrete slab smooth and even, free of voids, compacted as specified and to required elevation. Grade areas adjacent to concrete slab to drain away from shelter and to prevent ponding. Slope grade away from shelter 2.5 inches in 10 feet.

3.6 LANDFORMS

3.6.1 Place overburden material to create body of landforms. Compact with excavator bucket at 12 inch deep intervals.

SECTION 32150

AGGREGATE AND STONE

A. Work covered under this section shall consist of furnishing, hauling and placing gravel, aggregate, base course and stone boulders for roads, trails, pathways, and pads.

1.2 REFERENCE SPECIFICATION

A. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03

1.3 RELATED WORK

A. Section 312300, Excavation and Fill

2.1 BASE COURSE

A. 12” minus shot rock.

B. Unclassified borrow from site excavation that meets standards for 12” minus shot rock.

2.2 SURFACE COURSE

A. D-1 crushed aggregate.

B. Government provided D-1 crushed aggregate stockpiled on site.

3.1 PREPARATION OF SUBGRADES

A. Establish subgrade as required and in conformance with Section 312300.

B. Prior to placement of any materials specified under this section, the subgrade shall be prepared by dressing, shaping, wetting or drying and compacting. Compacted subgrades require approval prior to final surfacing. Scarify, moisture condition, and recompact as required to achieve compaction.

C. Any ruts or soft yielding spots that may appear shall be corrected by loosening and r emoving unsatisfactory material and adding approved material as required, reshaping and recompacting the affected areas to the lines and grades indicated on the plans.

3.2 COMPACTION

A. Moistened or dry aggregate to uniform moisture content suitable for compaction.

B. Compact all gravel by mechanical vibratory over the full area of each layer until visual displacement ceases but no fewer than three complete passes.

3.3 THICKNESS REQUIREMENTS

A. The thickness of the compacted aggregate shall not vary more than ½ inch. The compacted thickness shall not be consistently above or below the specified thickness.

3.4 AGGREGATE FINISHING FOR WHEELCHAIR ACCESSIBLE SURFACE

A. All aggregate surfacing is wheelchair accessible surface.

B. After compaction, water the aggregate surface thoroughly until the fines have completely settled from the surface. Then remove loose aggregate and dispose offsite. Add or remove material as necessary to achieve specified slopes and grades. The finished surface will be smooth, hard, and meet wheelchair accessibility standards.

SECTION 33420

CULVERTS

1.1 This work consists of constructing culverts and culvert extensions.

PART 2- MATERIALS

2.1 Corrugated Polyethylene Pipe (CPP): Furnish nonperforated corrugated polyethylene pipe conforming to AASHTO M 294. For watertight joints, conform to ASTM D 3212. Pipe diameter to be as shown on the Plans. Furnish culvert pipe with a wall thickness not less than that required by ASTM F667 – 12.

2.2 Foundation Fill. In accordance with FP – 03 Subsection 704.01.

2.3 Bedding Material. In accordance with FP – 03 Subsection 704.02.

2.4 Backfill Material. In accordance with FP – 03 Subsection 704.03(b).

PART 3- CONSTRUCTION

3.1 General. Use the same material and coating on all contiguous pipe sections and special sections such as elbows and branch connections. For culvert extensions, furnish the same material as the existing culvert.

The plans show the size, approximate location, and length of culverts. Determine final location, skew, length, elevations, and grade according to the following:

Stake culverts to fit field conditions. The location of culverts may differ from the plans. Perform the following:

1. Survey and record the ground profile along the culvert centerline.

2. Determine the slope catch points at the inlet and outlet.

3. Set reference points and recorded information necessary to determine culvert length and end treatments.

4. When the field design has been approved, set drainage structure survey stakes, reference stakes, and stake inlet and outlet ditches to make the structure functional.

5. Stake or grade ditches to make the culvert functional.

6. Reset stakes as many times as necessary to construct the work.

Do not order culvert material until obtaining acceptance of the final structure size, length, and alignment.

3.2 Preparation for Structure Excavation. Clear the area of vegetation and obstructions according to FP – 03 Subsections 201 and 203.

3.3 Excavation. Excavate according to FP – 03 Subsection 208.04. Excavate to foundation grade without unduly disturbing the trench surface. Foundation grade is the elevation at the bottom of any bedding for installing the structure. Compact the foundation.

3.4 Channel Preservation. Preserve channels according to FP – 03 Subsection 208.05 except excavate inside separations such as dikes or sandbags.

3.5 Dewatering. Where necessary to dewater, dewater according to FP – 03 Subsection 208.08.

3.6 Foundation Preparation. Excavate any unsuitable material present at foundation grade, and replace it with foundation fill. Place and compact foundation fill material according to Subsection 208.09(d)

3.7 Bedding. Level the foundation. Place un-compacted bedding material over the foundation in a layer of uniform thickness. For pipe with diameters of 12 to 54 inches, the bedding thickness is 4 inches. For pipe diameters larger than 54 inches, the bedding thickness is 6 inches. For belled joints, recess the bedding to receive the joints. Place the culvert on un-compacted bedding layer.

3.8 Laying Plastic Pipe. Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

Lay plastic pipe according to the pipe manufacturer’s recommendation. Provide soil-tight and spigot joints for plastic pipe culverts. If plastic end sections are used, reinforce and stiffen them such that inward buckling during construction is less than 3/8 inch with 100 lbs of force

3.9 Backfill. Bring backfill up evenly on all sides of the structure, and extend each layer to the limits of the excavation or to natural ground. Place and compact material in evenly balanced layers on each side of each pipe culvert. Place and compact backfill to a height of 12 inches above the top of the pipe. Complete the backfilling of the trench with suitable roadway excavation or unclassified borrow.

Place material in layers that, when compacted, do not exceed 6 inches in thickness. Compact each layer according to FP – 03 Subsection 209.11.

3.10 Compacting. Compact backfill using designated compaction method A:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

SECTION 01111 MOBILIZATION
1.1 DESCRIPTION
1.2 PAYMENT
SECTION 01330 SUBMITTALS
1.1 SUBMITTAL PROCEDURES
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.1 MATERIAL SUBMITTALS
3.2 SIGN SUBMITTALS
3.3 EROSION CONTROL PLAN
3.4 METAL GATE
END OF SECTION
1.1 SUMMARY
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.1 PROJECT LAYOUT
END OF SECTION
1.1 Summary
Part 2 - PRODUCTS (not used)
3.1 Surface Preparation
3.2 Hazard Tree Removal
3.3 Debris Disposal
3.4 Stockpile Topsoil
END OF SECTION
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.1 VAULT TOILET AND PAD
B. Structure, vault, toilet and pad to be removed completely and disposed of off-site.
C. Fill the hole from the vault and pad with excess excavated material. Top 4 inches to be topsoil material.
3.2 DISPOSITION OF DEMOLISHED/RELOCATED MATERIALS
END OF SECTION
1.1 SUMMARY
PART 2 – PRODUCTS
C. Grill: As provided by Pilot Rock (www.pilotrock.com). Model N2-2032 twin grate accessible fire grill.
D. Wheel stop: As provided by Rubber form (www.rubberform.com). RF-PWS38, Color - black, 14” rebar, or approved equivalent.
See Manufacturers’ Specifications in Appendix A.
PART 3 – EXECUTION
B. Fire Ring: Install per manufacturer’s instructions. Set in 8 inch diameter by 24 inches deep minimum concrete footings. If impact on roots of trees to be protected may occur, contact the CO for direction.
C. Grill: Install per manufacturer’s instructions. Set pole 14 inches deep in 36 inches deep concrete footing
D. Wheel stop: Install per manufacturer’s instructions.
END OF SECTION
1.1 DESCRIPTION
PART 2 - MATERIALS
2.1 SEED
2.2 SOIL
2.3 ALDERS AND EVERGREEN TREES
PART 3 - EXECUTION
3.1 TIMING
3.2 APPLICATION METHOD
3.3 TRANSPLANTING METHOD
3.4 SOIL PREPARATION
END SECTION
1.1 DESCRIPTION
1.2 REFERENCE SPECIFICATION
1.3 QUALITY ASSURANCE
1.4 TESTING
PART 2 - MATERIALS
2.1 FORM MATERIALS
2.1 WELDED WIRE FABRIC
2.2 REINFORCING BARS.
2.3 CONCRETE MIXTURES
2.4 CONCRETE MATERIALS
2.5 ACCESSORIES
PART 3 - EXECUTION
3.1 FOOTING EXCAVATION AND BEDDING
3.2 FORMWORK
3.3 WELDED WIRE FABRIC PLACEMENT
3.4 CONCRETE PLACEMENT
3.5 FINISHES FOR UNFORMED SURFACES
3.6 CONCRETE CURING
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 REFERENCE SPECIFICATION
1.4 STANDARDS
1.5 SUBMITTALS
1.6 QUALITY CONTROL
1.7 HANDLING
PART 2 - MATERIALS
2.1 COATINGS
PART 3 - EXECUTION
3.1 FABRICATION
3.2 WELDING
END SECTION
1.1 DESCRIPTION
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 HANDLING
PART 2 - MATERIALS
2.2 TIMBER, LUMBER AND BOARDS
2.3 METAL FASTENERS AND ACCESSORIES
2.4 ROOFING: STRUCTURAL STANDING SEAM STEEL ROOF PANELS
PART 3 - EXECUTION
3.1 GENERAL
3.2 FASTENING
3.4 FRAMING
END SECTION
1.1 SUMMARY
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE & HANDLING
PART 2 - PRODUCTS
1.1 WOOD FINISH
PART 3 - EXECUTION
3.1 APPLICATION
END SECTION
1.1 DESCRIPTION
1.2 QUALITY ASSURANCE
PART 2 – PRODUCTS
2.1 CUSTOM SIGNS
PART 3 – EXECUTION
3.1 SIGN SCHEDULE
1.1 DESCRIPTION
1.2 RELATED WORK
PART 2 - PRODUCTS
2.1 CONCRETE
2.2 VAULT TOILET
PART 3 - EXECUTION
3.1 GENERAL
3.2 DRAINAGE AND GRADING
1.1 DESCRIPTION
PART 2 - MATERIALS
2.1 EMBANKMENT MATERIAL
PART 3 - EXECUTION
3.1 CLEARING AND GRUBBING
3.2 EXCAVATION
3.3 UTILIZATION OF EXCAVATED MATERIALS
3.4 OVERBUILDING AND LANDSCAPE PROTECTION
3.5 GRADING
3.6 LANDFORMS
END SECTION
SECTION 32150
AGGREGATE AND STONE
1.2 REFERENCE SPECIFICATION
1.3 RELATED WORK
PART 2 - MATERIALS
2.1 BASE COURSE
2.2 SURFACE COURSE
PART 3 - EXECUTION
3.1 PREPARATION OF SUBGRADES
3.2 COMPACTION
3.3 THICKNESS REQUIREMENTS
3.4 AGGREGATE FINISHING FOR WHEELCHAIR ACCESSIBLE SURFACE
END SECTION
SECTION 33420
CULVERTS
1.1 This work consists of constructing culverts and culvert extensions.