A004_FSSS_Section255.pdf
PDF 12 KB Posted
- Attached to
- Kosciusko Road and Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-0120-S-15-0021
About this file
AG-0120-S-15-0021 Amendment 004 FSSS Replacement Pages
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0120S150021_A005.pdf | ||
| AG0120S150021_A004_SF30.pdf | ||
| A004_QuestAnswer.pdf | ||
| AG0120S150021_A003.pdf | ||
| 0120S150021_SF30.pdf | ||
| 0120S150021_RevSchedItems_A002.pdf | ||
| 0120S150021_PreBidMtgNts_A002.pdf | ||
| AG0120S150021_A001_SF30.pdf | ||
| AG0120S150021_A001_AtchPages.pdf | ||
| A1_Site1BridgePlans.pdf | ||
| A4_Site4BridgePlans.pdf | ||
| A3_Site3(Charley)BridgePlans.pdf | ||
| A2_Site2(Thayer)BridgePlans.pdf | ||
| A6_FSSupplementalSpecs_EdnaBayFSSS.pdf | ||
| AG0120S150021_KosRdBridgeReconstruct_IFB.pdf | ||
| A5_KozDrawingSetWkList_062515.pdf | ||
| A7_BioPreferredProductCategories.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG0120S150021, Amendment 004, FSSS Replacement Pages
255 – Mechanically Stabilized Earth Walls 255.00_1005_08_26_2015
Description
255.01 Replace this section with the following:
This work consists of constructing welded wire faced, mechanically stabilized earth (MSE) walls.
Materials 255.02 Add the following:
Permeable backfill Table 703-1
Construction Requirements
255.04 Wall Erection.
Add the following:
The walls shall be welded wire faced and supplied by an experienced fabricator.
The following mechanically stabilized earth wall suppliers have a history of supplying this type wall:
Hilfiker Retaining Walls Tensar International Corp.
3900 Broadway 5883 Glenridge Drive Eureka, CA 95502-2012 Suite 200 800-762-8962 Atlanta, GA 30328-5363 888-828-5126 T&B Structural Systems 6800 Manhattan Blvd.
Suite 304 Fort Worth, TX 76120
Other manufacturers of welded wire faced MSE walls, having a minimum of five years' continuous experience in the design and construction of MSE walls may be accepted.
Delete Sections (a) and (c).
255.05 Backfilling.
Add the following:
Backfill the bottom 4 feet of the mechanically stabilized earth walls with Permeable Backfill as specified in Section 703.04, Table 703-1.
AG0120S150021, Amendment 004, FSSS Replacement Pages
255.06 Acceptance.
Add the following to the fifth paragraph:
Sampling and testing requirements are shown in Table 255-1.
Materials
255.07 Replace the second and third paragraphs with the following:
All excavation, dewatering and select granular backfill is included in the 25501 pay item.
Permeable backfill is paid separately under pay item 25507.
Measure mechanically-stabilized earth walls by the square yard of front wall face.
Measure permeable backfill within the stabilized volume by the cubic yard in place.
| 255 – Mechanically Stabilized Earth Walls |
| 255.06 Acceptance. |
| 255.07 |