The government requries additional materials, see attached: Schedule of items Addendum 1. To facilitate this the solicitation response date is extended to 2August2017.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 112S170011Amd1.pdf | ||
| AG-0112-S-17-0011BbvBoilerReplace.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
2 July 27, 2017 856235
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Tongass National Forest 123 Scow Bay Loop Road PO Box 309 Petersburg, AK 99833
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0112-S-17-0011
9B. DATED (SEE ITEM 11)
2June2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Begich Boggs Visitor Center boiler system upgrade The government requries additional materials, see attached: Schedule of items Addendum 1. To facilitate this the solicitation response date is extended to 2August2017.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kim Toland, Supervisory Contract Specialist Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
July 27, 2017 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Schedule of items Addendum 1
Quantity- description Price each Total 4- 1 ¼” x 3” brass nipples 4- 1 ¼” brass threaded unions 4- 2 ½” x 1 ¼” brass reducing bushing 4- 2 ½” copper FIP adapters 1- 2” x ½” copper bell fitting reducer 4- 2 ½” x 2 ½” x ¾” copper tees 6- 3” copper 90’s 12- 2 ½” copper 90’s 2- 2 ½” sweat swing check valve ( if you don’t have sweat, threaded is ok just add 4 copper FIP adapters) 2- 3” copper tees 1- 3” sweat ball valve 2- 3” x 2 ½” x 2 ½” copper tees 4- well style thermometers ( sweat in model ) 2- 2 ½” sweat ball valves 10’- 3” L copper pipe 2- 10’ sections of 2 ½” L copper pipe 5- 3” propress copper couplings 5- 3” propress copper 90’s 1- 2 ½” propress coupling 2- 3”x 2 ½” copper bell reducers 1- 2” copper propress tee 8- 2 ½” copper strut clamps 4- 3” copper strut clamps 2- 20’ sticks of 1 5/8” deep strut unistrut 4- 3” loop hangers 1- 1” x 20’ copper L 1- ¾” 20’ copper L 5- 1 lb Bridget Solder 1- large jar of no corrode flux 4- pair green fuzzy soldering gloves 2- 55 gallon barrels of DOW frost 50/50 propylene glycol 1- large jar megalock pipe thread compound 3- rolls Teflon tape 8- 20’ sticks 4” pvc 25- 4” pvc 90 deg fittings 8- 4” pvc 45 deg fittings 4- 4” pvc couplings 1- large jar PVC glue 1- large jar pvc primer 100’- 4” pvc pipe 24- 4” 90’s 8- 4” pvc 45’s 40’ deep strut 20’ shallow strut 1- Siemens sensor 2- set pump phlanges Strut clamps