Addendum 1 Phase 2 16399.pdf
PDF 1 MB Posted
- Attached to
- 472/16399. JAG - Central MI CF-Pavement - Phase Two State and local contract opportunity
- Solicitation number
- RFQ 171 180000000380 2
- Issued by
- Gogebic County, Sterling Heights City, Michigan
About this file
This is an Addendum 1 to bidding documents for the Central Michigan Corrections Pavement Improvement Phase II project issued by the State of Michigan Department of Technology, Management and Budget on behalf of the Department of Corrections. The project involves parking lot paving repair and replacement at the Central Michigan Correctional Facility in Lansing, Michigan. A pre-bid meeting was held on February 20, 2018, with an attendance sheet provided as part of this addendum. The bid opening date is February 28, 2018. The addendum requires bidders to acknowledge receipt of two signed copies and return them with their proposals for submission of valid bids. Key project requirements include phasing adjustments mandating a minimum of 50 temporary parking spaces and a maximum of 99 spaces with ADA compliance, reopening of the West Administration entrance on Thursday afternoons at 1:00 p.m., and salvage of existing stone mulch, brick pavers, and boulders for relocation by Department of Corrections staff.
The addendum specifies additional technical requirements including installation of a 10-foot long 8-inch PVC Schedule 40 stub with removable cap in an existing catch basin for future foundation drain connection, amendment of post and chain fence details on sheet C-7 to require 3-inch Schedule 40 steel posts with black powder coating, and provision of fifteen additional posts for the owner's future use. Plan sheet C-8 has been updated to include red pavement markings for visitor parking spots in the new administration lot and a revised concrete walk fronting the administration building with 8-inch concrete in the segment shared with the security roadway, along with an edge drain cross section. All installation and necessary restoration work related to these specifications is included in the contractor's scope.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Advertisement - Phase Two.pdf | ||
| Specifications - Phase Two.pdf | ||
| LEIN Check - Phase Two.pdf | ||
| Drawings-Phase Two.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 3/11)
STATE OF MICHIGAN Date Issued: February 23, 2018 Department of Technology, Management and Budget Index No(s): 61220 Facilities and Business Services Administration File No: 472/16399.JAG 3111 W. St. Joseph Street Department: Department of Corrections
Lansing, MI 48917 Project Name: Central Michigan Corrections Pavement Improvement Phase II
Subject: Addendum #1
Bid Opening Date: February 28, 2018 Professional: Nowak & Fraus Engineers
ADDENDUM #1
TO: All bidders
SUBJECT: Revision to Bidding Documents
INTENT: This Addendum is issued to
Item 1 –Pre-Bid Meeting Attendance
The attendance sheet from the pre-bid meeting, held on February 20, 2018, is enclosed.
Item 2 – Phasing Notes
Phasing note 3 shall be adjusted to require a minimum of 50 temporary spaces and a maximum of 99 spaces. 1 ADA space shall be provided for each 25 spaces provided.
Phasing note 1 shall be amended to require reopening of the West Administration entrance on Thursday afternooons at 1:00pm.
Item 3 – Salvage / Stockpile Materials
The Contractor shall salvage all existing stone mulch and brick pavers outlined for removal, and transport to a location identified by DOC staff. All boulders noted for removal, and not reutilized as a part of the patio reconstruction, shall also be salvaged and transported for the Owner.
Item 4 – Foundation Drain Stub
A 10’ long 8” PVC Sch. 40 stub with removable cap shall be installed in the existing beehive catch basin adjacent to the west maintenance building for future foundation drain connection. The stub shall be installed at elevation 728.00 in the north direction, or as otherwise approved by the Engineer. All installation and necessary restoration work shall be included.
Item 5 – Post / Chain Fence Detail
The detail on sheet C-7 shall be amended to require 3” schedule 40 steel posts, with black powder coating.
In addition, the Contractor shall supply fifteen (15) additional posts for the Owners future replacement / use.
Item 6 – Plan Updates
Plan sheet C-8 has been updated to include for red pavement markings along the most southerly bay of parking within the new administration lot to designate visitor spots. In addition, proposed concrete walk fronting the administration building entry has been revised to include for 8” concrete within the segment shared with the security roadway. A edge drain cross section has also been included.
ACKNOWLEDGEMENT: Two copies of this Addendum, properly signed in the space provided below, must be acknowledged and returned with the bidder's proposal for submission of a valid proposal. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
Bidder's Signature Date
Joel Gordon Project Director Design and Construction Division Facilities and Business Services Administration
J C
E
N G
B
Y
P R
O J E
C T
O
I N
D E
X
P C
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
E n g i n e e r i n g
P l a n
A r e a
C
J J H
S W
S
T D
W
P R
O J E
D
E S
C R
I P
T I O
N
N F
E N
G I N
E E
R S
C i v i l
E n g i n e e r s
L a n d
S u r v e y o r s
L a n d
P l a n n e r s
W o o d w a r d A v e n u e
P o n t i a c M
I
T e l (2
F a x (2
C I V
I L
E
N G
I N
E E
R
C E
N T
R A
L
M
I C
H I G
A
R
R E
C T
I O
N A
L
F
A C
I L I T
Y
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
P A
R K
I N
G
L
P
A V
I N
G
R E
P A
I R
E P
L A
C E
M E
P
H A
S
NF EW
S
M A
T C
H L
I N
E
S
H E
LEGEND
PAVING LEGEND
DRAINAGE STRUCTURE ADJUSTMENTS
SWALE SECTION
J A
G
R e v i e w
D A
T E
I S
S U
D
F
B
D
S
P H
A S
E
A D
D E
N D
A
BOULDER WALL DETAIL
PERFORATED UNDERDRAIN
File details come from the government source that posted it. Updated .