Addendum 1 16344.pdf
PDF 513 KB Posted
- Attached to
- Central Michigan Correctional - Fire Alarm Upgrade State and local contract opportunity
- Solicitation number
- RFQ-171-180000000115-5
- Issued by
- Sanilac County, Michigan
About this file
This is Addendum No. 1 issued by Tower Pinkster Architects Engineers for the Central Michigan Correctional Fire Alarm Replacement project in St. Louis, Michigan, on behalf of the State of Michigan Department of Corrections. The project involves replacing fire alarm systems across multiple buildings, with specifications for Siemens Desigo panels, metal single-action pull stations, plenum-rated red fire alarm cabling, and new elevator-associated devices. The contract period has been extended to 180 calendar days, with bids due by 3:00 PM to Linda Feldpausch via email. The original bidding documents were dated October 20, 2017, with this addendum issued on November 2, 2017.
The addendum provides technical clarifications including requirements for CAT 6 cable between fire alarm control panels and the existing fiber network, building-specific fire alarm panels reporting through the Starnet 2 system, and remote test switches for inaccessible duct detectors. Notable modifications include the removal of printer requirements, elimination of Secure One programming references, and specification that existing IT racks are located in housing unit boiler rooms. The addendum also removes requirements for 2-inch conduit and category 6 cables on the west end of the Housing Unit HQ building.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign In 171030.pdf | ||
| 16344 Advertisement.doc | DOC document | |
| 16344 Specifications.pdf | ||
| Correction Lein Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
DATE OF ISSUANCE November 2, 2017
PROJECT Central Michigna correctionl – Fire Alarm Replacement St. Louis, Michigan File No.: 472.16344.RMP Index No.: 61220
OWNER State of Michigan – Department of Corrections
ARCHITECT’S PROJECT NO. 17-551.00
BIDDING DOCUMENT DATE October 20, 2017
SCOPE OF WORK
This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents.
The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form.
Failure to do so may result in disqualification of the Bid.
DOCUMENTS INCLUDED IN THIS ADDENDUM
This Addendum includes three (3) pages of text and the following documents:
• Bidding Documents: None.
• Contract Conditions: None.
• Specification Sections: None.
• Sketches: None.
• Drawings: None.
• Sign in sheet.
MDOC CENTRAL MICHIGAN CORRECTIONAL ADDENDUM NO. 1 PAGE 2 OF 3
PROJECT NO. 17-551.00
ADD-1 Item No. S-1 - Approved Manufacturers
Refer to previously issued specifications. Siemens Desigo is an approved panel.
ADD-1 Item No. S-2 - Pull Stations
Refer to previously issued documents. Pull stations shall be metal single action type.
ADD-1 Item No. S-3 - Programing
Refer to previously issued documents. Omit reference to Secure One programing in section 26 0500.
ADD-1 Item No. S-4 - Fire Alarm Cable Color
Refer to previously issued documents. The wire for the fire alarm cabling shall be red.
ADD-1 Item No. S-5 - Plenum Rated Cable
Refer to previously issued documents. All fire alarm wiring shall be plenum rated.
ADD-1 Item No. S-6 - Elevator Devices
Refer to previously issued documents. All fire alarm devices associated with the elevator are to be new and connected to the new fire alarm system. All required equipment and programming shall be included as part of the bid to ensure existing operation is maintained.
ADD-1 Item No. S-7 - Wiring to New Panel
Refer to previously issued documents. Wiring between the new fire alarm control panel and existing fiber network shall be CAT 6 cable. Coordinate with existing network for final connection point and type.
ADD-1 Item No. S-8 - Items Reported Back to Central Control
Refer to previously issued documents. Each building will have its own fire alarm panel and report back via the Starnet 2 system Alarm, Trouble and Supervisory. The system does not auto-dial the fire department. Provide a new transponder for each building.
ADD-1 Item No. S-9 - Remote Test Switches
Refer to previously issued documents. Remote test switches are only required where duct detectors are not accessible.
MDOC CENTRAL MICHIGAN CORRECTIONAL ADDENDUM NO. 1 PAGE 3 OF 3
PROJECT NO. 17-551.00
ADD-1 Item No. S-10 - Printer
Refer to previously issued documents. A printer is not required.
ADD-1 Item No. S-11 - Housing Unit HQ
Refer to previously issued drawing E111. Remove note for 2” conduit and category 6 cables located on the west end of the building.
ADD-1 Item No. S-12 - Bid Confirmation
Provide confirmation of bid via email prior to the 3:00 PM deadline to Linda Feldpausch at FeldpauschL1@Michigan.Gov
ADD-1 Item No. S-13 - Existing IT Racks
Refer to previously issued documents. The existing IT racks in the housing units are located in the boiler rooms.
Contractor shall field verify exact locations.
ADD-1 Item No. S-14 - Contract Time
Refer to previously issued documents. Extend the schedule toe 180 calendar days.
END OF ADDENDUM
File details come from the government source that posted it. Updated .