Activity Hazard Analysis Form (2015).pdf
PDF 2 MB Posted
- Attached to
- Fort Supply Refuse Collection Federal contract opportunity
- Solicitation number
- W912BV22Q0045
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FTS REFUSE 2022 MAPS.pdf | ||
| Exhibit 1 Quality Assurance Report SWT Form 982.pdf | ||
| FTS REFUSE 2022 PRC SCH.xlsx | XLSX spreadsheet | |
| Solicitation W912BV22Q0045 Fort Supply Lake Refuse.pdf | ||
| FTS REFUSE 2022 PRC SCH.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
ACTIVITY HAZARD ANALYSIS
SPK SO Form 385-17 June 2014 S e v e r i t y Risk Assessment Code (RAC) Matrix Assess the impact of each hazard in terms of potential loss and cost, based on the probability and severity should an incident occur.
E = Extremely High Risk H = High Risk Probability M = Moderate Risk L = Low Risk E E H H M E H H M L H M M L L M L L L L
PRINCIPLE STEPS
Break down the job into individual steps, e.g., mobilization, erect forms, erect scaffolding, install reinforcement bar, remove forms, demobilization.
HAZARDS
(Recognized/Anticipated) Identify the hazards, what are the man, machine, and environmental hazard factors of an operation. Note: include hazards that could potentially change the risk, such as weather, changing site conditions, abnormal operating procedures, etc. Do a change analysis when site conditions change.
CONTROLS
(ACTIONS TO ELIMINATE OR MINIMIZE HAZARDS)
List the controls needed to eliminate or reduce the risks. Controls can be in the form of educational controls (training), physical controls (barriers, guards, signs, etc.), Administrative Controls, Personal Protective Equipment, or Engineering Controls. Risk avoidance is another alternative, are there ways to do the job differently so that risks aren't encountered.
RAC
EQUIPMENT TO BE USED
List equipment needed for the job.
TRAINING REQUIREMENTS
List any specialized training or certifications needed for the job.
INSPECTION REQUIREMENTS
List any inspection requirements, before, during, or after the job is completed.
INSTRUCTIONS FOR COMPLETING THE ACTIVITY HAZARDS ANALYSIS FORM
Activity Hazard Analysis (AHA) is an important accident prevention tool that works by assisting with hazard identification, elimination and control methods before an activity.
Contractor Risk Management Process (AHAs) - 'Risk management is a business process that includes the identification, assessment, and prioritization of risks, followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events to an acceptable level. The USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process.
a. The AHA shall identify;
(1) The activity to be performed (Any activities listed in the project schedule, activities requiring and AHA by specific sections of EM 385-1-1 and as otherwise directed by GDA).
(2) The Principle step of the activity (Work sequences)
(3) Hazards (Recognized and anticipated hazards for each principle step)
(4) The action to eliminate or minimize the hazards (Site specific control measures to eliminate or reduce each hazards to an acceptable risk level)
(5) The Risk Assessment Code (RAC) for each principle step (See RAC Process below)
(6) Equipment to be used (Identify all equipment, PPE, signage, etc)
(7) Training Requirement (General and specific training, for ex. current CP/QP certifications and qualification cards)
(8) Inspection Requirement (Daily/Periodic as required by the manufacturer, the contractor's APP, and CP/QP).
b. Once the process has occurred, an overall Risk Assessment Code (RAC) will be assigned to this AHA.
c. Acceptance of risk. The residual risk is that which remains after controls have been applied. This residual risk must be communicated to the proper authority for acceptance in order to proceed with the activity.
d. No work will begin on the activity until the initial AHA has been accepted by the GDA addressing the activity-specific hazards.
e. Detailed requirements for the AHA process is identified in Section 01 of the EM 385-1-1. You are responsible for the review of those requirements prior to the submittal of the AHA.N
Risk Assessment Code (RAC) Matrix Step 1: Review each "Hazards" with identified safety "Controls" and determine RAC
a. Probability - is the likelihood to cause an accident, near miss, or accident and identified as: Frequent, Likely, Occasional, Seldom or Unlikely
b. Severity - is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each "Hazards" on the AHA. Annotate the overall highest RAC at the top of AHA.
E - Extremely High Risk H = High Risk M = Moderate Risk L = Low Risk
Use the AHA for activity clarification and hazard awareness, as a guide in new worker training, for retraining of experienced workers, as a refresher on activities performed infrequently, and as an accident investigation tool. Set priorities for doing AHA's: activities that have a history of incidents, activities with high potential for injury, and new or non-routine activities. Key value for AHA process: Focus more on activity specific hazards and challenges, and the solutions for the same.
NOTE:
1. This Activity Hazard Analysis is a fillable form.
2. Click on drop down box for appropriate RAC.
3. Click in date box to enter date.
EMPLOYEE DOCUMENTATION SHEET
This AHA serves as the hazard assessment required by EM 385-1-1, Section 01. The employees covered by this AHA have been instructed in the tasks to be performed, the hazards that may be encountered, the potential adverse effects of exposure to such hazards and the controls to be used. It also confirms that the employees have received adequate training specifically related to safe work practices, administrative and engineering controls and PPE to be used in order to ensure assigned work tasks are conducted in a safe and healthful manner. This Employee Documentation Sheet provides (1) the names of each employee performing work under this AHA, and (2) the training received, dates of such training, and the subject matter taught. By entering your name below, the contractor Site Safety & Health Officer and the employees performing the work, verify they full understand the content of the AHA and will follow the guidance contain therein.
EMPLOYEES PERFORMING WORK ACTIVITY
NAME
(Print: Last, First, Mi)
OCCUPATION
(Trade or Job Title)
DESIGNATED
(Competent or Qualified Person)
TRAINING DOCUMENTATION
(Attach)
DATE
8.0.1291.1.339988.308172 d2_del2@yahoo.com 17 June 2014 U.S. Army Corps of Engineers Del H. Dayrit & Robert E. Stout Activity Hazard Analysis
| Person authorized to allow work given the residual risk determined for the job.: |
| ResetButton1: |
| PrintButton2: |
| For multiple job steps, use the highest obtained Risk Code. Note: the risk code is the residual risk after controls have been implemented. The following codes require the appropriate personnel approvals: |
E = Division Commander (E = Extremely High Risk). Equates to loss of ability to accomplish mission if hazards occur during mission.
H = District Commander (H = High Risk). Results in significant degradation of mission capabilities if hazards occur during mission.
M = Program Manager, Project Manager, Project Engineer (M = Moderate). Minor injury, lost workday accident, compensable injury or illness, minor system damage, or minor property damage.
L = First Line Supervisor, Quality Assurance Representative (L = Low). Little or no impact on mission accomplishment.:
| Continuously experiences or occurs very often. Likely to occur often in the life of an item with a probability of occurrence greater than 10-1 in that life.: |
| Occurs frequently. Several times in the life of an item with a probability of occurrence less than 10-1 but greater than 10-2 in that life.: |
| Occurs several times. Likely to occur some time in the life of an item with a probability of occurrence less than 10-2 but greater than 10-3 in that life.: |
| Unlikely but can reasonably be expected to occur. Unlikely but possible to occur in the life of an item with a probability of occurrence less than 10-3 but greater than 10-6 in that life.: |
| Unlikely to occur but possible. So unlikely, it can be assumed occurrence may not be experienced with a probability of occurrence less than 10-6 in that life.: |
| Click to add row: |
| Click to delete row: |
| Could result in injury or occupational illness resulting in one or more lost work days, loss exceeding $10K but less than $200K, or mitigable (minor) environmental damage without violation of law or regulation where restoration activities can be accomplished for the environment. Lost day due to injury or illness not exceeding 3 months (accident risk).: |
| Could result in injury or illness not resulting in a lost work day, loss exceeding $2K but less than $10K, or minimal environmental damage not violating law or regulation. A first aid or minor medical treatment (accident risk). Slight equipment or system damage but fully functional and serviceable. Little or no property or environmental damage.: |
| Give location, i.e., McNary Dam Fish Facility.: |
| Date AHA form was prepared or last revised.: |
| Name of person(s) preparing this AHA form.: |
| Describe specific job in which this AHA form is being prepared for, i.e., Unit 2 Annual Maintenance.: |
| Responsible person who has reviewed the AHA form for accuracy and completeness. Note: the AHA does not need to list minor hazards but should list major hazards most likely to result in personal injury, damage to property, materials, or the environment.: |
| JobSteps: |
| Hazards: |
| Actions: |
| Select risk assessment code from drop down list based on matrix above: |
| Equipment: |
| Training: |
| Inspections: |
| TextField6: |
| DateTimeField1: |
| TextField7: |
| TextField17: |
| DropDownList10: |
| DropDownList9: |
| DateTimeField2: |
| TextField8: |
| TextField18: |
| DateTimeField3: |
| TextField9: |
| TextField19: |
| DateTimeField4: |
| TextField10: |
| TextField20: |
| DateTimeField5: |
| TextField11: |
| TextField21: |
| DateTimeField6: |
| TextField12: |
| TextField22: |
| DateTimeField7: |
| TextField13: |
| TextField23: |
| DateTimeField8: |
| TextField14: |
| TextField24: |
| DateTimeField9: |
| TextField15: |
| TextField25: |
| DateTimeField10: |
| TextField16: |
| TextField26: |
| DateTimeField11: |