A16 JOFOC for HQ Water Line_1.pdf
PDF 357 KB Posted
- Attached to
- Special Notice - JOFOC Federal contract opportunity
- Solicitation number
- DOIPFBO210034
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
NATIONAL CAPITAL REGION
1100 Ohio Drive S.W.
Washington, D.C., 20242
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
(for SIMPLIFIED ACQUISITIONS OVER $3,500 ($2,000/$2500 for Construction/Services) AND UP TO $150,000)
(See FAR 13.106-1)
PR Number:
1. Nature and/or description of the item/service being procured and its intended use (include the anticipated cost):
2. Sole Source Justification rationale (Check one and explain below):
Only one responsible source.
Urgent and compelling circumstances exist. Include critical delivery or performance dates, and when you became aware of the requirement. Provide a specific statement of the impact on Government operations, financial or otherwise, if the required delivery or performance dates are not met.
Other Explain:
3. Market Research. Please explain the results or why one was not performed. State whether any other offers were received or anyone expressed interest:
PR Number:
4. If this is a determination for sole source, the contracting officer certifies:
a. Only one source is available, or urgent and compelling circumstances exist.
b. The anticiapted price will be determiend fair & reasonable using the price analysis techniques described in FAR Part 13.106-3(a).
Contracting Officer Signature
Over $25,000:(if applicable)
Project Officer Signature
Warranted CO, 1 Level Above Contracting Officer
Signature
Date
Date
Date
| 1 Nature andor description of the itemservice being procured and its intended use include the anticipated cost 1: Repairs to the underground water line that supplies water to critical infrastructure in Greenbelt Park that has a severe leak. Leak is is pushing water into the adjacent landscapes and through the roadway, seepage from under the asphalt. The estimate is around USD 6500.00, should Ms. Utility correctly mark the line, where the watermain leak is occurring. |
| Check Box1: |
| 0: Off |
| 1: Yes |
| 2: Off |
| Text2: The leaking water line supplies water to essential government buildings. These buildings operate emergency services non stop 365 day a year. This line is spilling water onto adjacent landscapes and the road causing environmental concerns both below and above ground. Additionally, If the water line starts to leak more or cracks fully this could lead to loss of water to critical infrastructure, in term halting emergency services. This halting of emergency services can lead to loss of life and/or property | |
| Text3: The contractor has done work in the park on numerous occasions and familiar with the park utilities and understand the layout of the park providing consistent fair market pricing and quality work. Additionally, other contractors were not able to provide immediate response, less 8 hrs, due to lack of materials and/or equipment needed to reach the waterline. | |
| PR Number: 0040530199 | |
| 2021-03-24T12:03:16-0400 | |
| VINCENT GENTILCORE |
| Text5: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 2021-04-27T19:30:34-0400 | |
| ANALE YOUNG |
| Check Box8: |
| 0: Yes |
| 1: Off |
Text1:
File details come from the government source that posted it. Updated .