A1_SOW_-_PSDS_Playground_Fence_Project.pdf

PDF 129 KB Posted

Attached to
FENCE - PINE SPRINGS DAY SCHOOL Federal contract opportunity
Solicitation number
140A2322R0027
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

View the file

Other files for this federal contract opportunity

Other files attached to FENCE - PINE SPRINGS DAY SCHOOL, newest first.
File Type Posted
Amd0001_A1_Question_Answers_0001.pdf PDF
Sol_140A2322R0027_Amd_0001.pdf PDF
A3_Applicable_Federal_Health_and_Safety_Codes_and_Standards.pdf PDF
Sol_140A2322R0027.pdf PDF
A2_Wage_Determination_AZ20220022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR PLAYGROUND FENCE INSTALLATION

AT

PINE SPRINGS DAY SCHOOL

SPRING 2022

Overview:

The Privacy Chain Link fencing installation project at Pine Springs Day School for security and wind/sand protection of the new Playground Equipment and protective surfacing shall follow this statement of work and be submitted through the Bureau of Indian Education (BIE) Acquisition Office.

General Information:

Contractor shall provide an itemized cost proposal breakdown to install new playground enclosure fencing.

Location:

The New Playground Fencing installation Project is located on the Navajo Indian Reservation in Houck, Arizona – Apache County.

Lat. +35.405253 Long -109.279226 at Pine Springs Community.

School Contact:

Darryl Boyd at (928) 871-4311, Pine Springs Day School, Houck (Pine Springs), Arizona

SCOPE OF WORK

Specifications and Submittals:

Contractor shall provide professional workmanship in procurement and installation of new Playground Fencing at the Pine Springs Day School per statement of work and specifications.

Vendor is to locate all utility and overhead and underground lines before any construction is to start. Submit all original documents to the Contracting Office Representative (COR).

Mobilization:

Contractor shall provide all labor, materials, equipment, supervision, necessary tools, transportation and all other services needed to complete project in full.

Contractor shall be responsible for mobilization costs of transporting materials, equipment, storage bins and debris to and from project site.

Installations of commercial chain link privacy fencing (with metal slats), including gates, gateways, galvanized steel terminal and line posts in concrete footing, corner braces and trusses.

Contractor shall supply and install approximately 390’ of 8’ tall 10-gauge Commercial Privacy Chain Link Fencing. The dimensions of the fence enclosure, approximately, will be 126’ x 78’ x 126’ x 60’ and will consist of four corners.

• Contractor to install terminal and gate posts of galvanized steel pipe @ 2 7/8” diameter.

• Contractor to install line posts of galvanized steel pipe @ 2 3/8” inner diameter spaced

10’ on center.

• Contractor to install posts in 3000 PSI concrete footings @ 30” deep.

• Contractor to install top rail of galvanized steel pipe @ 1 5/8” diameter.

• Contractor to install one walk-through gate @ no less than a 3’ finished opening (spanning

5’ wide sidewalk) w/2 7/8” galvanized steel pipe posts.

• Contractor to install one double gate gateway w/gates @ 5’ each for a 10’ opening.

• Contractor to install braces and truss rods at each terminal/gate post.

• Contractor to install middle and bottom tension wires to prevent wind billowing.

The Contractor will be responsible for and bear all costs of disposal of excess materials and construction debris from properties of the United States. In addition, the Contractor will be responsible for maintaining the safety of jobsite, construction laborers and occupants of facility.

Warranty:

Contractor to provide 1-year workmanship warranty from the date of completion.

Contractor’s Performance Time:

The Contractor shall complete the work under this contract within 90 calendar days from the issuance of the Notice to Proceed.

End of Statement of Work