A1-SchematicPlan-A1.1.pdf
PDF 157 KB Posted
- Attached to
- Jacobs Creek Dining Hall Remodel Federal contract opportunity
- Solicitation number
- 1282A720Q0095
- Issued by
- Department of Agriculture Forest Service
About this file
This document includes schematic plans and specifications for a dining hall renovation project at Jacobs Creek Job Corps Civilian Conservation Center in Bristol, Tennessee. The plans detail proposed renovations to the kitchen, dishwashing area, and dining areas, including optional items to design and install new kitchen hoods; relocate the drink station, salad bar, and microwaves; and apply epoxy flooring in various rooms. The related federal contract opportunity is a solicitation from the Department of Agriculture Forest Service seeking a licensed vendor to provide design, preparation of plans and specifications, and renovation services for designated portions of the dining hall in accordance with the schematic plans. The solicitation number is 1282A720Q0095 and is titled the Jacobs Creek Dining Hall Remodel project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DiningHallBldg306All.PDF | ||
| MYSCAN_20200423_0003 - Dining Hall Annex.pdf | ||
| 1282A720Q0095.pdf | ||
| JAC-DiningHall-DB-SOW.pdf | ||
| DiningHallBldg306.pdf | ||
| TN20200105.pdf | ||
| Solicitation 1282A720Q0095 Jacobs Creek DH.pdf | ||
| JCJCC_Dining_dwgs_final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GUEST DINING
STORAGE
SERVER
DISHWASH
OFFICE
DINING ROOM ANNEX
(AKA "SUNROOM")
KITCHEN
EMERGENCY
GENERATOR
STOR
SERVING LINE
FREEZER
VACANT
CULINARY ARTS
ADDITION
BASE ITEM: KITCHEN EPOXY FLOORING
OPTIONAL ITEM: DINING HALL/OFFICE/STORAGE ROOMS EPOXY FLOORING
Jacobs Creek Job Corps Civilian Conservaton Center
DINING HALL SCHEMATIC A1
1 1
APPROXIMATE SCALE
" = 1'
OPTIONAL ITEM:
DESIGN/BUILD RELOCATION OF DRINK STATION,
SALAD BAR, AND MICROWAVES
BASE BID: DESIGN
KITCHEN HOODS
OPTIONAL ITEM:
INSTALL HOODS
BASE BID ITEM: REMOVE TILE AND DRYWALL IN
DISHWASHING AREA. REPLACE WITH DRYWALL
AND VINYL OR STAINLESS STEEL WALL PANELS.
OPTIONAL ITEM:
PROPOSED
LOCATION OF DRINK
STATION
OPTIONAL ITEM:
PROPOSED LOCATION OF SALAD BAR, AND
MICROWAVES
AutoCAD SHX Text W
AutoCAD SHX Text W/D
AutoCAD SHX Text
MECH
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
JAN
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text Sheet Title:
AutoCAD SHX Text
OF
AutoCAD SHX Text Checked:
AutoCAD SHX Text Drawn:
AutoCAD SHX Text Date:
AutoCAD SHX Text Design:
AutoCAD SHX Text Sheet:
AutoCAD SHX Text
D.VALLES
AutoCAD SHX Text 04/2020
AutoCAD SHX Text GENERAL NOTES 1. INSPECT FLOOR DRAINS AND DRAIN PIPE IN THE BUILDING AND ADDITIONS. INSPECT FLOOR DRAINS AND DRAIN PIPE IN THE BUILDING AND ADDITIONS. REPAIR/REPLACE ANY NON-FUNCTIONING DRAINAGE. 2. CONTRACTOR TO REMOVE, STORE AND REINSTALL ALL EQUIPMENT AND CONTRACTOR TO REMOVE, STORE AND REINSTALL ALL EQUIPMENT AND FURNISHINGS. EQUIPMENT CAN BE STORED IN OTHER ROOMS IN THE SAME BUILDING. 3. EXISTING FLOORING IS QUARRY TILE OVER CONCRETE SUBFLOOR. EXISTING FLOORING IS QUARRY TILE OVER CONCRETE SUBFLOOR. 4. EPOXY FLOOR TO BE SLOPED TO FLOOR DRAINS. EPOXY FLOOR TO BE SLOPED TO FLOOR DRAINS. 5. KITCHEN/DISHWASH FLOOR TO HAVE A NON-SLIP TEXTURE. KITCHEN/DISHWASH FLOOR TO HAVE A NON-SLIP TEXTURE. 6. INSTALL INTEGRAL EPOXY COVE AND BASE. HEIGHT OF BASE DEPENDENT INSTALL INTEGRAL EPOXY COVE AND BASE. HEIGHT OF BASE DEPENDENT ON HEIGHT OF REMOVED QUARRY TILE (OR OTHER) BASE. INSTALL STAINLESS STEEL TRANSITIONS/FLANGES WHERE TILE AND EPOXY ABUT. 7. KITCHEN HOOD DESIGN SHALL ALSO CONSIDER MAKE UP AIR KITCHEN HOOD DESIGN SHALL ALSO CONSIDER MAKE UP AIR REQUIREMENTS AND IMPACT ON HVAC REQUIREMENTS OF THE BUILDING. 8. RELOCATION OF DRINK STATION REQUIRES A COLD WATER CONNECTION, RELOCATION OF DRINK STATION REQUIRES A COLD WATER CONNECTION, FLOOR DRAIN AND ELECTRICAL. 9. RELOCATION OF SALAD BAR AND MICROWAVES REQUIRES ELECTRICAL. RELOCATION OF SALAD BAR AND MICROWAVES REQUIRES ELECTRICAL. 10. INSTALL STAINLESS STEEL PANEL BEHIND DISHWASHER IF VINYL PANELS INSTALL STAINLESS STEEL PANEL BEHIND DISHWASHER IF VINYL PANELS ARE THE SELECTED WALL COVERING.
| Sheets and Views |
| A1.1 |
| PLOT |
File details come from the government source that posted it. Updated .