A1. Draft PWS_LG Mast Display_7.28.2023.docx

DOCX document 34 KB Posted

Attached to
Mast Display Fabrication and Installation Federal contract opportunity
Solicitation number
M00264-23-SSA-0030
Issued by
United States Marine Corps

About this file

This performance work statement outlines requirements for the fabrication and installation of a mast display at the National Museum of the Marine Corps. The scope of work includes fabricating a semi-circular steel platform approximately 22 feet in diameter with an integral handrail and rubber floor covering. Additional requirements include modifying an existing railing, providing fabrication drawings, samples of paint and floor covering, and installing the completed display. The vendor must complete all work by April 1, 2024 at the museum located in Triangle, Virginia. The solicitation number for this opportunity is M00264-23-SSA-0030.

View the file

Other files for this federal contract opportunity

Other files attached to Mast Display Fabrication and Installation, newest first.
File Type Posted
A1. Attachment 1 - LG Mast Display Design Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT Performance Work Statement (PWS) Mast Display Fabrication and Installation National Museum of the Marine Corps (NMMC)

1.0 Background:

Open since November 10, 2006, the National Museum of the Marine Corps (NMMC) is a military history museum dedicated to showcasing the material history of the United States Marine Corps (USMC). Within this document NMMC, Government, and Museum are used interchangeably.

The NMMC consists of various extant themed exhibit spaces. Each gallery portrays the history of the Marine Corps through a complex integration of artifacts, graphics, audio and video media, theatrical lighting, life cast figures, interactive displays, scenic tableaus, and dioramas.

The NMMC intends to create a new display location within Gallery 1, Leatherneck Gallery. This location will display artifact vehicles up to 3,000 lbs. in weight which will be annually changed out by museum staff. The finished display structure is designed to blend in with the existing architectural design of the gallery and have features that facilitate these change outs with minimum effort and with readily available resources.

2.0 Scope:

This requirement is for fabrication and installation of a semi-circular platform approximately 22 feet in diameter with an integral handrail and rubber floor covering. The railing shall have two (2) built-in holders for paper graphics that will be generated by NMMC. To facilitate installation of artifacts, one section of the railing will pivot out of the way and a removable ramp will be provided to roll the vehicle up onto the display. The display will be custom fabricated of steel (or approved alternative) and painted to match the existing gallery color. See attached drawings for more information.

The Vendor’s responsibilities include:

· Fabrication of the display to meet the design intent

· Performance of field survey to verify conditions and dimensions

· Modification of existing railing to accommodate new design

· Creation of fabrication drawings for approval by NMMC

· Sample submission of paint and floor covering

· Installation of the display

The NMMC has achieved and maintained a high level of quality in its exhibits, earning it a gold standard rating with independent museum rating organizations and winning awards for excellence from themed entertainment associations. It is incumbent on the Vendor, and their sub-contractors, to maintain or exceed this level of quality and durability in the fabrication, installation, overall look, and quality in the completed exhibitry. Any work failing to meet this standard, as deemed by the Government Technical Point of Contact (TPOC), shall be corrected by the Vendor at their expense. Time spent correcting rejected work shall not be accepted as a reasonable excuse for missing project deadlines. It is also the responsibility of the Vendor, and their sub-contractors, to understand and adhere to the requirements of this document. It shall be understood that, for the sake of simplicity and to reduce redundancy, details listed herein are not always repeated on drawings. This is not meant to release the Vendor from meeting these requirements. Any work not meeting the level of quality as specified in this document shall be corrected at the Vendor’s expense to the satisfaction of the TPOC.

2.1. Place of Performance: NMMC is located within Prince William County and subject to concurrent jurisdiction with Marine Corps Base (MCB), Quantico, VA 22134 address:

The National Museum of the Marine Corps (NMMC) 1775 Semper Fidelis Way, Triangle, VA 22172-1949

2.2. Period of Performance: All work to be fully complete in accordance with the terms of the PWS by April 01, 2024.

2.3. List of Deliverables:

· Display platform with integral railings and graphic holders.

· Removable ramp.

· Modification of existing railings.

· Fabrication drawings

· Paint and floor covering samples

2.4. Working Hours: The NMMC is open to the general public from 9:00 AM until 5:00 PM, 364-days per year, every day except December 25. All work associated with this procurement will take place outside of these hours. The display location is in a high traffic and high visibility area of the museum and work of any kind will not be permitted with guests in the area.

2.5. Field Conditions: The Vendor shall conduct a site visit and verify all field conditions, dimensions, and materials in the field before commencing work with the understanding that the government drawings represent design intent and are not to be interpreted as ready-to-build. Deficiencies with the final product caused by a lack of field verification shall be corrected by the Vendor at their expense to the satisfaction of the TPOC. It is the responsibility of the Vendor to evaluate the site conditions to understand the scope of work completed.

2.6. Working on a Government Installation: The Vendor and their employees shall be subject to all traffic, security, and registration regulations for personnel and vehicles.

All Vendor and sub-contracted personnel attending meetings, answering Government telephones, or working on site where their status is not known to third parties, must identify themselves as such on demand by Government personnel. Unless otherwise directed by the TPOC, all documents produced or revised by Contractors or developed through Contract participation must be marked as “Contractor generated documents” or otherwise identified in a manner that discloses the Contractor’s participation.

The Vendor and their sub-contractors shall understand they are working at a Government, military installation and shall comply with all posted rules and laws and/or as directed by Government personnel.

While on-site, all contracted personnel shall conduct themselves in a professional manner at all times and not create a situation that interferes with Museum operations or with the general public’s visitor experience. Unacceptable or unsafe behavior will be documented by the TPOC and delivered to the Vendor via email. It shall be the responsibility of the Vendor to correct the behavior or remove the offending personnel per direction of the TPOC.

2.7. Deadlines: It shall be the Vendor’s responsibility to meet all schedule milestones and deadlines agreed upon in the contract. It is the responsibility of the Vendor to complete all work, to include any punch list items, in time for the agreed upon deadline. Payment will not be granted for incomplete work.

2.8. Accident Reporting: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. The Vendor shall notify the TPOC immediately in the event of a reportable accident. All other accidents shall be reported within eight (8) hours of incident. The Vendor shall follow up, in writing, with an accident report that includes: Time, date, location of occurrence, names of involved parties and witnesses, description of events and injuries, and a plan of correction to the TPOC. The Vendor will provide their on-site staff with adequate training to ensure prompt and efficient first aid.

2.9. Hazardous Materials: The Vendor shall ensure that all hazardous materials are stored in approved containers and are handled in a safe manner in accordance with OSHA guidelines. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

2.10. Onsite Work: The Vendor shall have the appropriate licenses and shall acquire the appropriate approvals required to work in Prince William County, VA. The Vendor shall comply with federal, state, and local regulations, and shall understand that the Museum is subject to concurrent jurisdiction, including Marine Corps Base Quantico, Prince William County, and the Commonwealth of Virginia.

2.11. Delivery Dates: The Vendor is responsible for designating or arranging mutually agreeable delivery dates of Government property and for receiving, unloading, and handling Government property at the site.

2.12. Contract Performance: The Vendor shall fulfill this contract in such a manner that all key personnel will be able to successfully manage all requirements of this PWS.

· Vendor key personnel include:

· Project Manager: The Vendor shall provide a Project Manager to be present at all times when contractor personnel are working on government premises. The Project Manager will be the Government’s single point of contact on the job site for all issues.

2.13. Fire-Retardant Materials: The Vendor shall supply inherently fire-retardant materials for all specimens, including artificial foliage, fabrics, draperies, and plywood. Certification of all materials to be provided to TPOC before final invoice.

2.14. Security Requirements: During on-site installations, the Vendor is responsible for:

· Security of equipment and materials left on the Museum campus, including but not limited to the lay down area.

· Security breaches perpetrated by all Vendor employees and all sub-contractors.

· Security and safety during truck delivery, offload, staging, and other potentially dangerous work performed on the Museum campus.

2.15. Material Submittals: The Vendor shall follow the following Submittal Process:

· Materials, supplies, and equipment procured by the Vendor shall meet the specifications, standards, and manuals listed in the drawings and approved by the TPOC prior to installation.

· Submittals are required for approval by the TPOC.

· The TPOC may at any time require test data showing that any materials or supplies procured by the Vendor meet the industrial specifications standards, equal to or better than the manufacturer’s original, and will be compatible with existing systems.

· Replacement parts shall be new. If new parts are not available, the Vendor may request approval, in writing, from the TPOC to use rebuilt parts. The use of rebuilt parts prior to written approval of the TPOC is at the Vendor’s sole risk. All parts, whether new or rebuilt, shall carry the full warranty required by this contract.

· The Government acceptance, review, or submittal approval of any portion of the proposal or final design shall not relieve the Vendor from fulfilling their responsibility of any errors or omissions with respect thereto.

2.16. Government Property: The Vendor is responsible for protecting Government Property from damage, including damage from exposure to the elements, and to repair or replace items damaged as a result of mishandling by the Vendor’s handling or operations. The Vendor shall not accept any Government Property without receiving a Transmittal from the TPOC. The transmittal will be signed by the Vendor and the TPOC showing receivership of the materials. Condition of the Government Property will be noted on the transmittal at time of signature.

· The details of anything that the Vendor may design or develop under the Vendor shall become and remain the property of the Government and shall not be published or disclosed in any manner without the express written consent of the Government.

2.17. Administrative Submittals: The Vendor shall submit the following within 14 days of contract award:

(a) Permits, if required

(b) Insurance Certificates, if required

(c) Preliminary schedule for the work

Submittals shall be reviewed by the TPOC within thirty (30) business days of receipt. Any submittals not meeting the requirements of the contract shall be rejected. The Vendor has ten (10) business days within which to correct and resubmit to the TPOC for approval. Although the Government understands there are instances requiring a fast approval of a submittal, the TPOC will not waive their right to the stated review period due to improper planning on the part of the Vendor. The Government shall not be liable for project delays in situations where the Vendor failed to allow for the full approval period. Any expenses associated by delays due to this situation shall be the responsibility of the Vendor.

2.18. Project Schedule: The Vendor shall act as project scheduler and provide a critical path document in both electronic and paper format to the TPOC within thirty (30) business days of award. The document shall be created in PC-compatible Microsoft Project or similar software and published in PDF format. The document shall include milestones, all critical path elements, start and end dates for all activities critical to the installation and integration of all exhibit elements. The Project Schedule shall incorporate all scheduling and milestone information from all other contractors that impact and or interface with the Vendor.

2.19. Coordination: The Vendor shall coordinate exhibit fabrication and installation activities to assure efficient and orderly installation of each part of the work. Coordination must assure safe and timely fabrication, transportation, and installation of all exhibits and associated elements listed in the Solicitation. Coordination shall involve the coordination of all work by all Contractors and Vendor’s sub-contractors. Vendor to provide on-site project coordinator as point of contact during any site work.

Where installation of part of the work is dependent on installation of other components, either before or after its own installation, exhibit fabrication activities shall be scheduled in the sequence required to obtain the best and most efficient results.

The Vendor shall hold production meetings with the TPOC and any other parties needed, to report on progress, resolve issues and coordinate efforts of all Contractors. The meeting location and frequency shall be mutually agreed upon by the TPOC and the Vendor.

2.20. Review of Fabrication and Installation Schedule: During production meetings, the Vendor will:

· Report where each activity is in relation to the schedule, whether on time, ahead of, or behind schedule.

· Determine how delays shall be mitigated; secure written commitments from parties involved to do so.

· Discuss whether schedule revisions are required to ensure that current and subsequent activities shall be completed within the contracted schedule.

· Review the present and future needs of each entity present, including the following, if applicable:

(1)Interface requirements
(2)Time
(3)Sequences
(4)Status of submittals
(5)Deliveries
(6)Off-site fabrication problems
(7)Access
(8)Site utilization
(9)Temporary facilities and services
(10)Hours of work
(11)Hazards and risks
(12)Housekeeping
(13)Quality and work standards
(14)Changes, if required
(15)Potential challenges and proposed solutions

2.21. The Vendor shall notify the TPOC via E-mail upon completion of any and all completed exhibit elements ready for review. The TPOC will respond, in writing, with an approval or a list of deficiencies to be corrected after review.

2.22. The Vendor shall correct all deficiencies in accordance with the TPOC’s direction. All corrective work shall be complete within seven (7) working days unless otherwise agreed to by the TPOC in writing.

2.23. Field Measurement: The Vendor shall be responsible for field measurement and verification of locations of all facility elements. This data is to be used to verify proper fitting of all exhibit elements.

Any discrepancies that affect the exhibit design with recommended corrective fixes are to be submitted to the TPOC, in writing, for resolution. Locations and elevations shown on the drawings are subject to final field adjustment by the TPOC before fabrication and installation. The Vendor shall immediately notify the TPOC, in writing, of apparent errors discovered on the drawings or in the initial stakeout indicating any discrepancies in field dimensions on a plan or elevation drawing. All work improperly located due to Vendor’s errors or omissions shall be corrected at no additional cost to the Government.

2.24. Miscellaneous Vendor Responsibilities:

· The Vendor and its employees shall conduct only business covered by the contract during periods paid for by the Government, and will not conduct any other business on Government premises.

· Vendor personnel shall abide by all rules and regulations applicable to the Government premises, on which they work, including any applicable safety and security regulations as well as any measures necessary to verify Vendor labor hours.

· Vendor employees assigned to the contract shall not solicit business while performing within the scope of the contract.

· Personnel assigned by the Vendor to perform services under this contract shall be acceptable to the Government in terms of personal and professional conduct. Should the continued assignment of any person in the Vendor’s organization be deemed by the TPOC to conflict with the interest of the Government, that person shall be immediately removed from the assignment, and the reason for removal shall be fully explained, in writing, by the TPOC.

· Employment and staffing difficulties shall not be justification for failure to meet established schedules, and if such staffing difficulties impair performance, the Vendor may be subject to default. If a dispute arises the Contracting Officer shall have the final decision.

· The details of anything that may be revealed to the Vendor by the Government in the course of performing under the contract shall not be published or disclosed in any manner without the express written consent of the Government.

3.0 Government Responsibilities:

3.1. Document and Sample Review: The TPOC shall return one (1) copy of all deliverables submitted, within ten (10) business days of receipt, marked with one of the following actions:

(a) Approved – Vendor is clear to proceed.

(b) Revise and Resubmit – Vendor is required to revise the material noted by the TPOC and resubmit for approval and/or discussion.

Under no circumstances shall the Vendor proceed with an unapproved sample.

The TPOC will always strive to provide a quick response for all drawing reviews, but reserves the right to utilize the full ten (10) days. The Vendor should allow for the full window of TPOC review time in their scheduling. Under no circumstances will the TPOC expedite a review due to a lack of Vendor planning and the government will not incur costs due to insufficient review time.

3.2. Meeting Minutes: During all meetings with the TPOC, the Vendor shall take meeting minutes. At a minimum, the minutes shall include:

· Date of meeting

· Meeting attendance

· Old business

· New business

· Open and closed items

· For all open items, the party responsible for its resolution shall be noted.

· Open items shall remain on the minutes until closed.

· Closed items shall be removed from the next minutes after they become closed.

Minutes will be given a unique number for tracking. Minutes will be submitted to TPOC in no more than (5) business days for review. TPOC will request changes, if needed, in no more than (10) business days after which the Vendor will resubmit to TPOC. This cycle continues until agreement has been reached by both parties and the final document is signed by the TPOC.

3.3. The TPOC shall review and approve work prior to fabrication and final finish after installation.

3.4. The TPOC shall have ten (10) working days to respond to Vendor requests for information, proposals, queries, or review of invoice.

3.5. The TPOC shall provide feedback to each critical path document within ten (10) workdays of receipt.

3.6. The TPOC shall de-conflict schedules and facilitate conflict resolution between contractors. The TPOC shall involve the Contracting Officer, as required.

3.7. The TPOC shall provide digital copies of text, imagery, graphics package, and design drawings.

3.8. The TPOC shall provide curatorial expertise such as instruction on handling artifacts, acceptable levels of ultraviolet exposure for artifacts, artifact mounting considerations and requirement, and other curatorial information from the Curatorial Services Branch.

3.9. The TPOC shall be the field art director during fabrication and installation. The Vendor and their subcontractor may provide art directors to monitor and guide their crews but the TPOC will make the final determination of esthetics. Once the TPOC has judged the work to be complete, no further changes are to be done. Any changes to the esthetics of an exhibit made by the Vendor after buy-off by the TPOC shall be corrected at no cost to the Government.

3.10. The TPOC shall provide a receiving/laydown area within the museum. This space is accessible from outside the building via a roll up door and is proximal to the installation location. This area is provided for staging only and is not to be used for fabrication.

4.0 List of Attachments:

· Attachment 1: Leatherneck Gallery Mast Display Design Drawings

5.0 Government Technical Point of Contact (TPOC): To be provided upon award of contract.