This document outlines roofing material specifications for multiple projects at Hawaii Volcanoes National Park. It includes specifications for commercial rib roofing panels, hip and valley ridges, wall flashing, screws, caulking, and other roofing materials in various quantities and sizes. The materials must be delivered no later than December 30, 2023 to the Hawaii Volcanoes National Park rain shed, located approximately half a mile from the main entrance. On delivery, vendors must coordinate with park personnel for an inspection for invasive species such as little fire ant, which will take approximately 20 minutes to complete, in accordance with the attached standard operating procedures. This roofing material specification list supports Solicitation 140P8223Q0017 issued by the National Park Service within the Department of the Interior for roofing materials at Hawaii Volcanoes National Park.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8223Q0017_Amd_0002.pdf | ||
| A06_Gutter_Material_Specification_List_0001.docx | DOCX document | |
| Sol_140P8223Q0017_Amd_0001.pdf | ||
| HAVO_Invasive_Pest_SOPs_20220308.pdf | ||
| HAVO_Buildings_Map_(KVC_Rainshed).pdf | ||
| Sol_140P8223Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roofing Material Specifications
Material Specifications:
Q27 A & B
| 1. Commercial Rib roofing panels- RFG Z/A 24 GA P7 | Cool LG Forest Green-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” 35in wide COLOR EQUAL TO: HPM Forest Green SRI; 37 | |||
| Must meet or exceed ASTM E1592, ASTM E1680 & | E1646. Must be or same as | HPM Forest Green SRI: 37 Durapon 70 Duracoat. Certificate of Compliance | must be presented upon delivery. |
1) Quantity: 82pcs at 14’ 3 ½” length
2) Quantity: 18pcs at 9’ length
3) Quantity: 22pcs at 3’5” length
2. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24 gauge 21" HIP RIDGE COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 21 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
3. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24-gauge VALLEY Pan COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 3 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
4. Wall Flashing 24 Gauge Low Gloss Forest Green 4’’ High against wall 6’’ on roof with ½'’ 5 degree kick bend and 10’ft in length 24gauge WALL FLASHING COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 7 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
5. Screw Roofing SS 9X2" Forest Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Forest Green SRI; 37 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 1250 Each
6. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
1) Quantity: 12
Q203
7. Commercial Rib roofing panels- RFG Z/A 24 GA P7 Cool LG Forest Green-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” 35in wide COLOR EQUAL TO: HPM Forest Green SRI; 37 Must meet or exceed ASTM E1592, ASTM E1680 & E1646. Must be or same as HPM Forest Green SRI: 37 Durapon 70 Duracoat. Certificate of Compliance must be presented upon delivery.
1) Quantity: 32pcs at 17’6” length
2) Quantity: 15pcs at 13’8” length
3) Quantity: 9pcs at 39” length
8. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24gauge 21" HIP RIDGE COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 10 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
9. Wall Flashing 24 Gauge Low Gloss Forest Green 4’’ High against wall 6’’on roof with ½'’ 5 degree kick bend and 10’ ft in length 24gauge WALL FLASHING COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 10 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
10. Screw Roofing SS 9X2" Forest Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Forest Green SRI; 37 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 1250 Each
11. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
Q199
| 12. Commercial Rib roofing panels- RFG Z/A 24 GA P7 | Cool LG Forest Green-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” 35in wide COLOR EQUAL TO: HPM Forest Green SRI; 37 | ||
| Must meet or exceed ASTM E1592,ASTM E1680 & E1646. Must be or same as HPM | Forest Green SRI: 37 Durapon 70 Duracoat. Certificate of Compliance must be presented | upon delivery. |
1) Quantity: 10pcs at 22’ 3” length
2) Quantity:10pc at 17’3’’ Length
3) Quantity: 20pcs at 16’ length
4) Quantity: 16pcs at 15’6” length
5) Quantity: 16pcs at 12’ length
6) Quantity: 9pcs at 11’3” length
13. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24gauge 21" HIP RIDGE COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 23 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
14. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24gauge VALLEY Pan COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 3 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
15. Screw Roofing SS 9X2" Forest Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Forest Green SRI; 37 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 1250 Each
16. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
Q201
| 17. Commercial Rib roofing panels- RFG Z/A 24 GA P7 | Cool LG Forest Green-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” 35in wide COLOR EQUAL TO: HPM Forest Green SRI; 37 | ||
| Must meet or exceed ASTM E1592,ASTM E1680 & E1646. Must be or same as HPM | Forest Green SRI: 37 Durapon 70 Duracoat. Certificate of Compliance must | be presented upon delivery. |
1) Quantity: 9pcs at 22’4” length
2) Quantity: 22pcs at 16’ length
3) Quantity: 7pcs at 15’6” length
4) Quantity: 4pcs at 14’ length
5) Quantity: 15pcs at 13’6” length
6) Quantity: 16pcs at 12’ length
7) Quantity: 12pcs at 11’4” length
8) Quantity: 9pcs at 11’2” length
18. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24gauge 21" HIP RIDGE COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 17 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
19. 24 Gauge Low Gloss Forest Green 17.6" to 21.1" 24gauge VALLEY Pan COLOR EQUAL TO: HPM Forest Green SRI; 37
1) Quantity: 3 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
20. Screw Roofing SS 9X2" Forest Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Forest Green SRI; 37 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 1250 Each
21. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
1) Quantity: 24
Art Center
| 22. Commercial Rib roofing panels- RFG Z/A 24 GA P7 | Cool LG Platinum-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” | |
| 35in wide COLOR EQUAL TO: HPM Platinum SRI; 42 | ||
| Must meet or exceed ASTM E1592,ASTM E1680 & E1646. Must be or same as HPM Platinum SRI: 42 Durapon 70 Duracoat. Certificate of Compliance must be presented | upon delivery. |
1) Quantity: 32pcs at 13’3 ¼'’ length
2) Quantity: 32pcs at 12’3” length
3) Quantity: 5pcs at 12’ 1 3/4” length
4) Quantity: 32pcs at 10’ length
5) Quantity: 32pcs at 9’3” length
23. 24 Gauge Low Gloss Platinum 17.6" to 21.1" 24gauge 21" HIP RIDGE COLOR EQUAL TO: HPM Forest Green SRI; 42 Roof pitch 8/12
1) Quantity: 11 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
24. Screw Roofing SS 9X2" Forest Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Platinum SRI; 42 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 1250 Each
25. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
1) Quantity: 12
Kahuku B404
26. Commercial Rib roofing panels- RFG Z/A 24 GA P7 Cool LG Kelly Green-Low Gloss Duracoat 7/8” high rib spaced at 2‐2/3” 35in wide COLOR EQUAL TO: HPM Kelly Green SRI; 30 Must meet or exceed ASTM E1592,ASTM E1680 & E1646. Must be or same as HPM Kelly Green SRI: 30 Durapon 70 Duracoat. Certificate of Compliance must be presented upon delivery.
1) Quantity: 20pcs at 19’ length
2) Quantity: 86pcs at 18’ length
27. 24 Gauge Low Gloss Kelly Green 17.6" to 21.1" 24gauge paint Flashing Bend 1/2"x10"x10"x1/2" RIDGE CAPS, PITCH 4/12
1) Quantity: 18 Each
a. Durapon 70 Duracoat. Must meet or exceed ASTM E1592, ASTM E1680 & E1646.
28. Screw Roofing SS 9X2" Kelly Green-BIMETAL EVERGRIP COLOR EQUAL TO: HPM Kelly Green SRI; 30 (1/4” head, Stainless Bond Seal) #9-15 x 2”
1) Quantity: 4000 Each
29. Caulking Flexible Seal 60 Clear 10.6OZ - 12/CASE
1) Quantity: 0
30. CMR Edge Seal Chemical Pint #DC599R3
1) Quantity: 6
31. Protecto wrap Alum Face 9"x50' Roll (9” or 12”)
1) Quantity: 84
Delivery Information:
All materials shall be delivered no later than December 30, 2023.
The Roofing components shall be delivered to Hawaii Volcanoes National Park rain shed. The rain shed is approximately a half of a mile from the main entrance station to: Hawaii Volcanoes National Park.
Park address:
1 Crater Rim Drive, Hawaii National Park, HI. 96718
LFA Inspections Requirements:
Materials shall be free of little fire ant (LFA) and other invasive species. Inspection of materials shall be conducted in accordance with the attached Invasive Pest Prevention Standard Operating Procedures. On delivery, the vendor is required to have an LFA inspection. LFA inspection is performed by Hawaii Volcanoes National Park Personnel. Vendor must coordinate with the COR or POC for the delivery to ensure the inspection is performed. Inspections happen at the entrance of the park and take a roughly 20 minutes to perform.