A06_ATT_2_Construction_Drawings_CRLA_Chimney_Stabilization_FY23.pdf
PDF 3 MB Posted
- Attached to
- CHIMNEY STABILIZATION Crater Lake NP Federal contract opportunity
- Solicitation number
- 140P8423Q0040
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_ATT_1_Revised_Project_Specifications140P8423Q0040_CRLA_Chimney_0001.pdf | ||
| Sol_140P8423Q0040_Amd_0001.pdf | ||
| B08_ATT_4_Technical_Info_Form_140P8423Q0040_CRLA_Chimney_Stabilization_FY23.pdf | ||
| Sol_140P8423Q0040.pdf | ||
| A06_ATT_1_140P8423Q0040_Project_Specifications_CRLA_Chimney_Stabilization_FY23.pdf | ||
| B08_ATT_3_Construction_Wage_Decision_140P8423Q0040_CRLA_Chimney_Stabilization_FY23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBSHEET
SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D A
TE
N
O
R
EV
IS
IO
N S
310186
NWA
G1
B U
IL
D
IN
G
C H
IM
N
EY
S
TA
B
IL
IZ
A
TI
O N
K
LA
M A
TH
C
O U
N
TY
, O R
EG
O
N
TIC NO.
106-188094
TI
TL
E
SH
EE
T
SHEET INDEX
DESCRIPTIONSHEET
G1 TITLE SHEET
WHERE PUBLIC UTILITY FIXTURES OR FACILITIES ARE SHOWN AS EXISTING ON
THE PLANS OR ENCOUNTERED WITHIN THE CONSTRUCTION AREA, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OWNERS OF THESE
UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION INVOLVING
EXCAVATION. THE CONTRACTOR SHALL AFFORD ACCESS TO THESE FACILITIES
FOR NECESSARY MODIFICATION OF SERVICES OR RELOCATION. UNDERGROUND
FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE
SURVEYS, RECORDS AND UTILITY OPERATOR LOCATION MARKINGS; THEREFORE
THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. TYPE, SIZE AND
GENERAL LOCATION OF THE FACILITIES WERE REQUESTED OF THE OPERATORS
AND SHOWN ON THE PLANS, AND IF NECESSARY, UPDATED WITHIN 90 DAYS OF
COMPLETION OF THE FINAL PLANS. IT IS POSSIBLE THERE MAY BE OTHERS, THE
EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN OR SHOWN. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE AND EXACT
LOCATION AND TO AVOID DAMAGE THERETO. NO CLAIMS FOR ADDITIONAL
COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY
INTERFERENCE OR DELAY CAUSED BY THE WORK.
A1 PROJECT LOCATION
A2 PHOTOS
A3 SHORING PLAN
PROJECT LOCATION
A4 UNDERPINNING DETAILS
SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D A
TE
N
O
R
EV
IS
IO
N S
310186
NWA
A1
B U
IL
D
IN
G
C H
IM
N
EY
S
TA
B
IL
IZ
A
TI
O N
K
LA
M A
TH
C
O U
N
TY
, O R
EG
O
N
TIC NO.
106-188094
PR
O
JE
C
T
LO
C A
TI
O
N
PROJECT
CHIMNEY EXTERIOR
CHIMNEY INTERIOR
NOTE 2" SEPARATION
EXTERIOR CHIMNEY EXPOSED CONCRETE FOOTING SOIL BORING IN PROGRESS
SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D A
TE
N
O
R
EV
IS
IO
N S
310186
NWA
A2
B U
IL
D
IN
G
C H
IM
N
EY
S
TA
B
IL
IZ
A
TI
O N
K
LA
M A
TH
C
O U
N
TY
, O R
EG
O
N
TIC NO.
106-188094
PH
O
TO
S
NOTE FORM REMNANT
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D A
TE
N
O
R
EV
IS
IO
N S
310186
NWA
A3
B U
IL
D
IN
G
C H
IM
N
EY
S
TA
B
IL
IZ
A
TI
O N
K
LA
M A
TH
C
O U
N
TY
, O R
EG
O
N
TIC NO.
106-188094
SH
O
R
IN
G P
LA
N
EXISTING BUILDING & SHORING SECTION
EXISTING MASONRY CHIMNEY
MOBILE HOME OR OTHER REMOVABLE SOIL
ANCHOR TIE-DOWN. INSTALL EACH SIDE OF
SHORING FRAMING, CONNECT WITH STEEL CHAIN
SECURELY FASTENED TO FRAMING TO RESIST
UPWARD THRUST DUE TO BRACE LOADING
EXISTING CHIMNEY FOUNDATION
2'
2X4 FRAMING 12" O/C VERT AND
ACROSS TOP/BOTTOM - NAIL
PLYWOOD TO FRAMING W/10D
AT 6" O/C
4X4 BLOCKING BETWEEN STUDS, 4X6 STRONGBACK
ACROSS BACK, CONNECT W/(3) 1/4"X6" SIMPSON SDS
SCREWS EACH STUD - CONTRACTOR TO PROVIDE SECURE
CONNECTION BETWEEN BRACE AND
BLOCKING/STRONGBACK
6X6 POST SET IN 12" DIA X 4' DEEP
CONCRETE FOOTING - ALTERNATIVE
BRACE FOOTING CAN BE PROPOSED BY
CONTRACTOR - FOOTING MUST BE
REMOVED AT END OF CONSTRUCTION.
4" DIA. STEEL PIPE MIN. OR
OTHER EQUIVALENT
STRENGTH STEEL BRACE
SCREW OR HYDRAULIC HAND
OPERATED JACK -
CONTRACTOR TO PROVIDE
SECURE CONNECTION
BETWEEN BRACE AND
ANCHOR POST
2" RIGID INSULATION FOAM (F-250 OR
SIMILAR) GLUED TO 3/4" PLYWOOD AFTER
PLYWOOD HAS BEEN NAILED TO STUD
FRAMING - FOAM PLACED DIRECTLY
AGAINST CHIMNEY
SPLAY BRACES APPROX
30 DEG. VERTICALLY AND
IN PLAN VIEW TO ALLOW
EQUIPMENT ACCESS
WOOD SHORING PER SECTION
ANCHOR POST AND FOOTING PER SECTION
BRACE PER SECTION
FOAM & PLYWOOD PER SECTION
TIE DOWN ANCHOR PER SECTION
EXISTING BUILDING SHORING PLAN
~30°
CHAIN CONNECTION
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D A
TE
N
O
R
EV
IS
IO
N S
310186
NWA
A4
B U
IL
D
IN
G
C H
IM
N
EY
S
TA
B
IL
IZ
A
TI
O N
K
LA
M A
TH
C
O U
N
TY
, O R
EG
O
N
TIC NO.
106-188094
U N
D
ER
PI
N
N
IN
G D
ET
A
IL
S
INSITU SOIL INFORMATION
6" DIA., 3' LONG (MIN) HORIZONTALLY
AUGERED REINFORCING BEAM
8" DIA. X ~ 6' DEEP CIP PILE
(TYP OF 8)
NO. 4 BAR REINFORCEMENT
(STANDARD HOOKS)
ROUGHEN COLD JOINT & CLEAN PRIOR
TO PLACING CAP
15"
PLACE AGAINST FOOTING
BACKFILL & HAND COMPACT SOIL
EXCAVATE TO MINIMUM EXTENT
REQUIRED TO AUGER UNDER
FOOTING
RESTORE SURFACE UPON COMPLETION
TWO NO. 4 HORIZONTAL BARS AT 6"
DEPTH MAY VARY DUE TO
OBSTRUCTIONS. NPS ENGINEER TO
APPROVE FINAL DEPTH DURING
CONSTRUCTION
1 2 343214
NUMBER INDICATES POUR SEQUENCE
1'
EXTEND 1' BEYOND EDGE OF
CHIMNEY
CIP GRADE BEAM
6" DIA., 3' LONG (MIN) HORIZONTALLY
AUGERED REINFORCING BEAM &
PILE (TYP OF 8)
EXISTING MASONRY CHIMNEY
0-1' TOPSOIL
1' - 6' SANDY LOAM
WITH GRAVEL/CINDER
6' REFUSAL
SB1
EXISTING MASONRY CHIMNEY
UNDERPINNING SECTION DETAIL
UNDERPINNING PLAN VIEW
CIP PILE CAP. PLACE
AFTER CONSTRUCTING PILES
SHEET NOTES
1. REFERENCE SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE REQUIREMENTS INCLUDING
SPECIALIZED MIX DESIGN. CONCRETE PLACED IN VERTICAL PILES AND HORIZONTALLY AUGURED BEAMS SHALL BE TREMIE POURED, PUMP PLACED WITH A 2” MAXIMUM DIAMETER HOSE AND VIBRATED
OR TAMPED AS NECESSARY TO ELIMINATE VOID POCKETS
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT DAMAGE TO THE EXISTING HISTORIC CHIMNEY DURING CONSTRUCTION. THE FOLLOWING CONSTRUCTION SEQUENCE MUST BE
FOLLOWED:
A. INSTALL SHORING FORMWORK ON CHIMNEY, SEE SHORING DETAIL
B. PLACE STEEL PIPE OR BEAM BRACING TIGHT TO SHORING. ENGAGE SCREW TYPE JACK TO
ENSURE A SNUG-TIGHT COMPRESSION BETWEEN BRACING AND SHORING FORMS
C. EXCAVATE EXISTING GRADE TO BOTTOM OF CHIMNEY FOUNDATION. DO NOT OVER EXCAVATE.
DO NOT UNDERMINE FOUNDATION
D. UNDER NPS ENGINEER SUPERVISION USE HAND SCREW OR HAND PUMP HYDRAULIC JACKS TO
PUSH ON CHIMNEY AT THE TWO UPPER BRACE POINTS, WHILE KEEPING STRESS ON THE
LOWER BRACE POINTS. THE INTENT WILL BE TO MOVE THE CHIMNEY 1/2" TO 1" TOWARDS THE
BUILDING TO REPLUMB THE ENTIRE CHIMNEY.
E. AUGER HORIZONTAL BEAM HOLES FOLLOWED BY VERTICAL PILE HOLES OF THE SAME
SEQUENCE NUMBER. SEE PLAN DETAILS FOR HOLE SEQUENCE NUMBERS.
F. PLACE REINFORCING AND CONCRETE IN OPEN HOLES
G. ALLOW 48 HOURS MINIMUM BETWEEN NEXT BEAM/PILE PLACEMENT IN SEQUENCE
H. PLACEMENT OF CAP BEAM IS PERMISSIBLE ON SAME DAY AS FINAL BEAM/PILE PLACEMENT
I. ALLOW 7 DAYS MINIMUM BETWEEN CAP BEAM PLACEMENT AND SHORING REMOVAL AND
EXCAVATION BACKFILL
J. BACKFILL WITH NATIVE SOIL AND LIGHTLY COMPACT BY HAND
3. AUGURED HOLES ARE LIKELY TO SLUFF. AT HORIZONTAL AUGURED HOLES, CONTRACTOR SHALL ANTICIPATE FOR TWICE THE REQUIRED CONCRETE VOLUME TO ENSURE ADEQUATE MATERIAL IN THE FIELD TO COMPLETELY FILL THE HORIZONTAL EXCAVATION. AT VERTICALLY AUGURED HOLES, IT IS ACCEPTABLE TO UTILIZE 8” DIAMETER CARDBOARD FORMWORK (“SONOTUBE”) TO BE ABANDONED.
CONTRACTOR SHALL ANTICIPATE FOR CONCRETE VOLUME REQUIRED TO FILL 8” DIAMETER VERTICAL
HOLES.
4. BEDROCK/REFUSAL IS ANTICIPATED AT 5 TO 6 FEET BELOW GRADE. ROCKS MAY BE ENCOUNTERED PRIOR TO BEDROCK. AN NPS REPRESENTATIVE WILL BE ONSITE TO REVIEW AND ADVISE HOW TO
PROCEED SHOULD REFUSAL BE ENCOUNTERED PRIOR TO DEPTH REQUIREMENTS.
EXISTING CHIMNEY FOUNDATION
PLASTIC SPACER (TYP) AT
ENDS TO MAINTAIN 2" COVER
PLASTIC SPACER (TYP) AT
ENDS TO MAINTAIN 2" COVER
| Sheets and Views |
| CRLA 310186 PLANS-G1 |
| CRLA 310186 PLANS-A1 |
| CRLA 310186 PLANS-A2 |
| CRLA 310186 PLANS-A3 |
| CRLA 310186 PLANS-A4 |
File details come from the government source that posted it. Updated .