A06_-_140L1722Q0029-Specifications_1.pdf

PDF 878 KB Posted

Attached to
GAOA, TRFO ROAD WORK 2022 Federal contract opportunity
Solicitation number
140L1722Q0029
Issued by
Department of the Interior Bureau of Land Management Colorado Region

View the file

Other files for this federal contract opportunity

Other files attached to GAOA, TRFO ROAD WORK 2022, newest first.
File Type Posted
A06_-_140L1722Q0029-Plans_1.pdf PDF
A04_-_140L1722Q0029-Schedule_of_Items_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior Bureau of Land Management

Tres Rios Field Office

Road Reconstruction and Maintenance 2022

SPECIFICATIONS

Tres Rios Road Work 2022

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS

DIVISION 31 - EARTHWORK

31 00 00 AGGREGATE

31 00 50 ROAD MAINTENANCE AND RECONDITIONING

31 00 60 ROLLING DIP CONSTRUCTION AND MAINTENANCE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The work includes, but is not limited to; road maintenance, road reconstruction, aggregate placement, moisture conditioning, and compaction.

1.2 LOCATION

The project is located within Montezuma County and Dolores County, Colorado.

1.3 WORK DURATION AND SCHEDULE

Work shall be completed within 270 days of the notice to proceed. The work will not take that long. The allowable duration is to allow multiple opportunities to work within the work restrictions. Work shall occur Monday - Friday, excluding federal holidays.

1.4 WORK RESTRICTIONS

Road maintenance work will only be allowed after the ground has received precipitation, or when the ground has some moisture. Work will not be allowed when the ground is dry, after prolonged periods without precipitation.

1.5 SPECIAL COORDINATION

The following roads are located within an archaeologically sensitive area. All road maintenance work must be monitored by the Canyons of the Ancients National Monument (CANM) archaeologist. Work will not be allowed without the archaeologist present. The archaeologist will monitor the work for disturbance to archaeological sites.

BLM Road 4721, 4722, & 4525 BLM Road 4526

1.6 ROAD WORK SUMMARY

1.6.1 Bradfield Bridge Recreation Area Roads

Bradfield Bridge Recreation area roads are gravel surfaced roads.

Maintain the recreation area roads, the campsite parking spurs, and the boat ramp. Place aggregate, moisture condition and compact the aggregate with vibratory compaction equipment.

1.6.2 BLM Roads 4526, 4721, 4722, and 4525

BLM Roads 4526, 4721, 4722, & 4525 are native surfaced roads. Work is only required at the aggregate placement locations. Prepare the road surface, at the aggregate placement locations, in accordance with section

SECTION 01 11 00 Page 2

31 00 50 ROAD MAINTENANCE AND RECONDITIONING prior to placing aggregate.

Moisture conditioning and vibratory compaction of the aggregate is not required.

Do not disturb the ground surface outside of aggregate placement locations.

1.6.3 BLM Roads 4110 and 4111

BLM Road 4110 and 4111 are native surfaced roads. Maintain the roads.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 BRADFIELD BRIDGE ROADS - ROAD MAINTENANCE

1.1.1 Payment

Payment will be made for all costs associated with maintaining Bradfield Bridge Roads. Including; camping spurs, parking areas, boat ramp, and mobilization and demobilization from the road site.

1.1.2 Unit of Measure

Unit of measure: Mile.

1.2 BRADFIELD BRIDGE ROADS - AGGREGATE BASE COURSE

1.2.1 Payment

Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, and placement.

1.2.2 Unit of Measure

Unit of measure: Ton.

1.3 BRADFIELD BRIDGE ROADS - MOISTURE CONDITIONING AND COMPACTION

1.3.1 Payment

Payment will be made for all costs associated with moisture conditioning and vibratory compaction of the aggregate at Bradfield Bridge roads.

1.3.2 Unit of Measure

Unit of measure: Job.

SECTION 01 20 00 Page 4

1.4 BLM ROAD 4110 - ROAD RECONSTRUCTION AND MAINTENANCE

1.4.1 Payment

Payment will be made for all costs associated with maintaining BLM Road 4110. Including mobilization and demobilization from the road site.

1.4.2 Unit of Measure

Unit of measure: Mile.

1.5 BLM ROAD 4111 - ROAD RECONSTRUCTION AND MAINTENANCE

1.5.1 Payment

Payment will be made for all costs associated with maintaining BLM Road 4111. Including mobilization and demobilization from the road site.

1.5.2 Unit of Measure

Unit of measure: Mile.

1.6 BLM ROAD 4721, 4722, AND 4525 - AGGREGATE BASE COURSE

1.6.1 Payment

Payment will be made for all costs associated with providing aggregate base course. Including road surface preparation, transportation, and placement.

1.6.2 Unit of Measure

Unit of measure: ton.

1.7 BLM ROAD 4526 - AGGREGATE BASE COURSE

1.7.1 Payment

Payment will be made for all costs associated with providing aggregate base course. Including road surface preparation, transportation, and placement.

1.7.2 Unit of Measure

Unit of measure: ton.

SECTION 01 20 00 Page 5

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 6

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.

This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with

SECTION 01 33 00 Page 7 appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 8

�4

�3

� 2 � � � � � 8

� � � 2 � � 2 �

� � 7

2 � � � � � � 2 � � � � �

� 2 � � � � 2 � � �

� 2 � � � � 2 � � �

<4

<3

<5

<0

SECTION 01 57 60

SUPPLEMENTAL ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.1 DEFINITIONS

Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Spill Prevention And Cleanup Plan; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 FIRE PREVENTION

All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.

3.2 EQUIPMENT CLEANING AND MAINTENANCE

Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative prior to arriving on site. Notify the Contracting Officer's Representative at least 7 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite and returns at a later date, then equipment shall be re-inspected before reentering the work site.

Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.

3.3 SPILL PREVENTION

The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.

SECTION 01 57 60 Page 9

3.4 WASTE CONTROL

All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.

SECTION 01 57 60 Page 10

SECTION 31 00 00

AGGREGATE

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

The contractor shall assume that construction water is available from the Dolores River for use on the Bradfield Bridge recreation area roads.

Contractor shall verify the availability of water with the Colorado Division of Water Resources prior to using water.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Aggregate Base Course; G

SD-07 Certificates

Weight Tickets

PART 2 PRODUCTS

2.1 AGGREGATE BASE COURSE

Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2021, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.

PART 3 EXECUTION

3.1 AGGREGATE BASE COURSE PLACEMENT

Contractor shall receive written approval of the subgrade prior to placing aggregate. Submit weight tickets. Weight tickets will be used as basis for payment.

3.2 AGGREGATE BASE COURSE COMPACTION

Compaction is only required on the Bradfield Bridge Recreation Area Roads.

Moisten material as necessary to achieve compaction. Compact the aggregate base course by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

SECTION 31 00 00 Page 11

SECTION 31 00 50

ROAD MAINTENANCE AND RECONDITIONING

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Maintain and recondition existing roads. Rebuild and reshape the;

traveled way, turnouts, shoulders, ditches, waterbars, and rolling dips.

Clean culverts.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 ROADWAY SHAPING AND GRADING

3.1.1 SCARIFY

Prior to shaping, scarify the roadway to a depth greater than existing ruts, washboards, potholes, or other surface irregularities.

3.1.2 SHAPING AND GRADING

Shape the roadway in a manner that will conserve usable material; usable material shall not be graded into ditches and/or over the shoulders of the road.

Provide a cross slope that will drain water across the roadway. Maintain an inslope, outslope, or crown.

3.1.3 TURNOUTS AND INTERSECTIONS

Turnouts shall be maintained to the same requirements as the roadway.

Provide smooth transitions at all intersections.

3.1.4 SURFACED ROADS

Establish a blading pattern that will retain the surfacing on the roadbed and provide a thorough mixing of the materials within the completed surface width. Surfacing material shall not be graded into ditches and/or over the shoulders of the road.

3.1.5 FINISHING

Finish the road surface to be reasonably smooth, uniform, and shaped to conform to the typical sections as shown on the drawings.

Remove from the road surface any rock larger than 3 inches in its greatest dimension.

Vegetation and organic material larger than 12 inches in length, or larger than 2 inches in diameter, shall be removed from the roadway.

SECTION 31 00 50 Page 12

3.2 ENTRENCHED ROAD SECTIONS

Entrenched road sections shall be excavated, shaped and graded as shown on the drawings. Excavated material from entrenched sections shall be incorporated into the roadway. The excavated, and incorporated, material shall be compacted in layers not exceeding six inches.

3.3 ROLLING DIPS AND WATERBARS

Where rolling dips and waterbars exist, they shall be cleaned and restored as nearly as possible to their original dimensions.

3.4 DITCH MAINTENANCE

Clean existing ditches, and leadoff ditches, of obstructions that impede or hinder the flow of water. Reshape existing ditches and leadoff ditches, to the configuration typical to the roadway or as shown on the drawings.

Debris and organic material accumulated during ditch maintenance shall be removed and spread outside the ditches limits, and shall not be placed on the roadway.

Slough material removed from the ditches may be used to rebuild the shoulders of the road. Material in excess of that needed to rebuild the shoulders shall not be placed on the traveled way.

Ditches leading to drainage structures shall be cleaned and reshaped to the invert elevation of the structure.

3.5 CULVERT CLEANING

Clean culverts to drain. Remove material and debris from the inlet and outlet. Grade as necessary to provide free flow into, and out of, the culvert.

3.6 CATTLEGUARD MAINTENANCE

Remove cattleguard decks. Clean the deck and the area beneath the cattleguard of soil and other material to the bottom of the original foundation over the entire width of the installation. Clean drainage pathway. Do not leave the cattleguard opening unattended or open.

SECTION 31 00 50 Page 13

SECTION 31 00 60

ROLLING DIP CONSTRUCTION AND MAINTENANCE

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Construct rolling dips as shown on the drawings and as specified.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 ROLLING DIP CONSTRUCTION

3.1.1 EXCAVATION

Material excavated in the creation of the rolling dip shall be conserved.

Excavated material shall be used to construct the crest of the rolling dip. Excess excavated material shall be spread uniformly over the roadway.

3.1.2 EMBANKMENT

The crest of the rolling dip shall be compacted to a uniformly firm surface in layers not exceeding six inches.

3.1.3 DRAINAGE INLET

Grade the ditch to run into the rolling dip at location "B" as shown on the drawings.

3.1.4 DRAINAGE OUTLET

Provide outlet ditch to daylight.

3.2 ROLLING DIP MAINTENANCE

Where rolling dips exist, they shall be cleaned and restored as nearly as possible to their original dimensions. Provide drainage ditches as necessary to allow free flow of water into, and away from, the dip.

SECTION 31 00 60 Page 14