A04 Statement of Work PR 40489097.doc
DOC document 6 MB Posted
- Attached to
- Annual Cross-Connection Backflow Control Certifica Federal contract opportunity
- Solicitation number
- 140L3920Q0068
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06 WDO Bid Schedule PR 40489097.xlsx | XLSX spreadsheet | |
| B03 DOL Wage Determination PR 40489097.pdf | ||
| Sol_140L3920Q0068.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANNUAL CROSS-CONNECTION CONTROL CERTIFICATION
SUMMARY
A. Summary Part 1: To provide a certified backflow prevention assembly tester to perform field testing of all assemblies for the prevention of backflow in accordance with the provisions of the Manual of Cross-Connection Control. (NAC 445A.67245, NRS 445A.860) Summary Part 2: To provide a certified backflow prevention assembly tester to perform field testing of all assemblies for the prevention of backflow in accordance with the provisions of the Manual of Cross-Connection Control. (NAC 445A.67245, NRS 445A.860) or For the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, National Fire Protection Association (NFPA) and Nevada Administrative Code NAC 477.346 & NAC 477.345.
1. The certified tester shall have their own testing equipment that is calibrated to the manufacturers’ specifications and have all necessary hoses and fittings to conduct the work.
B. Base year will require inspection and identification of all backflow prevention assemblies for adequacy at all locations. Should inadequate preventive measures be in place, the contractor shall first identify the cost to correct the existing systems and submit for approval by the Contracting Specialist.
C. Following the Base year of the contract after identification of the number and locations of backflow prevention assemblies, the remaining years will include inspection and providing certifications annually.
D. Count: There are backflow prevention systems located at the following two (2) sites.
| Location |
| Building |
| Count |
| McDermitt Fire Station |
| Shop Building |
| 3 |
| Crew Quarters |
| 1 |
| Hose Stand Pipe |
| 1 |
| Black Rock Station |
| Office Building |
| 1 |
| Fire Suppression |
| 1 |
| Central NV Interagency Dispatch Center |
| Main Dispatch Center |
| 1 |
| Expanded Dispatch |
| 1 |
| Air Base |
| 1 |
LOCATIONS
E. Physical addresses of the sites containing backflow prevention valves (see Figure 1 below):
1. McDermitt Fire Station, Hwy. 95 No. and North Reservation Road, McDermitt, NV 89421.
a. Irrigation Line Along the Sidewalk, southwest of the crew quarters
b. Irrigation Line near the southeast corner of the shop
c. Stand pipe/hydrandt near the northeast corner of the shop
d. Double-check valve between the tank house and the shop
e. Air gap funnel on the tank filling hose stand
2. Black Rock Station, 200 Transfer Road, Gerlach, NV 89412.
a. Main location, located outside of the compound, picture included.
b. Main Building, Fire Suppression System assembly inside the building.
3. Central Nevada Interagency Dispatch Center,
a. Main Dispatch, 5330 Jays Road, Winnemucca, NV 89445
b. CNIDC Expanded Dispatch, 5330 Jays Road, Winnemucca, NV 89445.
c. Winnemucca Air Base, 5500 Jays Road, Winnemucca, NV 89445
SCHEDULE
A. Before commencing certification work, provide a schedule and 48-hour notice to the Government’s Point of Contact (POC).
F. ESCORT
G. The government will provide an escort (POC) for access to buildings and sites including the outside locations.
Figure 1
Complex Backflow Preventor location, Black Rock Station
WINNEMUCCA DISTRICT OFFICE
Annual Cross-Connection BACKFLOW Control Certification
Project
File details come from the government source that posted it. Updated .