A04_Statement_of_Work.docx
DOCX document 24 KB Posted
- Attached to
- 2500 TONS OF HAY Federal contract opportunity
- Solicitation number
- 140L6222Q0014
About this file
This statement of work outlines requirements for the delivery of hay to the Bureau of Land Management's Rock Springs Wild Horse and Burro Facility in Wyoming. The contract will be for a base year of 1800 tons of hay and an option quantity of 700 tons, for a total of 2500 tons to be delivered between September 2022 and September 2023. Hay requirements include 700 tons of alfalfa, 300 tons of grass, and 800 tons of alfalfa for the base year, with 700 tons of alfalfa for the option year. Deliveries of approximately 300-500 tons per month will be scheduled by the contracting officer's representative based on facility needs. Hay must meet specifications for crop year, origin, quality, composition, and bale size. The contractor will unload and stack bales on site. Pricing will be proposed by vendors and incorporated into the contract. Evaluation will be based on lowest price among technically acceptable proposals meeting assurances for hay specifications and an unloading plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_0003.docx | DOCX document | |
| Sol_140L6222Q0014_Amd_0003.pdf | ||
| Questions_Addressed_0002.docx | DOCX document | |
| Sol_140L6222Q0014_Amd_0002.pdf | ||
| Questions_Addressed_0001.docx | DOCX document | |
| Sol_140L6222Q0014_Amd_0001.pdf | ||
| Sol_140L6222Q0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluation section of the Statement of Work goes over the additional requirements that will need to be provided with quote.
STATEMENT OF WORK
GENERAL: The Bureau of Land Management (BLM), Rock Springs Wild Horse and Burro Facility in Rock Springs, Wyoming has a requirement of 1800 tons of hay for the base year and an option quantity of 700 tons of hay for a total of 2500 tons to be delivered to Rock Springs WH&B Facility. Below is specific requirements for delivery dates, tonnage and type of hay for contract. All deliveries shall be coordinated with the Bureau of Land Management (BLM) Contracting Officer Representative (COR). The hay Contractor will deliver, unload and stack all the square bales into the BLM’s hay shed or designated area’s.
| Base Year: | Line Item 10: 700 tons of alfalfa hay, 2022 crop. | |
| Line item 20: 300 tons of grass hay, 2022 Crop | ||
| Line item 30: 800 tons of alfalfa hay, 2022 crop |
Option Quantity: 700 tons of alfalfa hay, 2022 crop Specific Requirements: Delivery dates
· The period of performance will be 09/06/2022 through 09/05/2023. Delivery schedule will be negotiable and incorporated upon award.
Base year: 1800 tons of hay
· Approximate delivery schedule for the hay could be once a month or more frequent (i.e. deliver approximately 300-500 tons of hay as determined necessary by the COR (i.e. the quantity of hay being consumed is greater, the number of animals being housed increases, or necessary for hay contractor operations). Hay deliveries will be required in a timely manner and not drawn out except for extenuating circumstances which will require the prior approval by the on-site COR.
Option Quantity: 700 tons of hay
· Approximate delivery schedule for the hay could be once a month or more frequent (i.e. deliver approximately 300-500 tons of hay as determined necessary by the COR (i.e. the quantity of hay being consumed is greater, the number of animals being housed increases, or necessary for hay contractor operations). Hay deliveries will be required in a timely manner and not drawn out except for extenuating circumstances which will require the prior approval by the on-site COR.
Alfalfa HAY SPECIFICATIONS:
0. Shall:
0. Be from 2022 crop
0. Be domestically grown.
0. Be leafy, green, well cured, properly stored and free of dust, mold, or heating.
0. Be barn stored or covered with hay tarps. Any hay stored outside uncovered must be free from any weather related damage.
0. Be free of any Russian Thistle or prickly herb, "Cheat" grass, and any other weed or grass not considered healthy forage for domestic animals.
0. Shall not:
1. Have any bearded grain or any forage plant containing long awns (spikelets).
Grass Hay Specifications:
A. Shall:
1. Be from 2022 crop
1. Be domestically grown.
1. Be timothy, orchard and brome grasses mixed
1. Be green, well cured, properly stored and free of dust, mold, or heating.
1. Be barn stored or covered with hay tarps. Any hay stored outside uncovered must be free from any weather related damage.
1. Be free of any Russian Thistle or prickly herb, "Cheat" grass, and any other weed or grass not considered healthy forage for domestic animals.
B. Shall not:
1. Have any bearded grain or any forage plant containing long awns (spikelets).
BALE REQUIREMENTS
Large Bales
a. Shall:
i. 3 foot x 4 foot by 8 foot bales
ii. Weigh approximately 1100 pounds for 3 foot X 4 foot by 8 foot bales.
b. Shall not:
i. Be ragged, have varying lengths, have wires or twine of unequal tension, or, be broken.
ii. Consist of bales that are on top or bottom of stacks stored outside.
1. Be rain damaged.
CERTIFIED WEIGHT TICKETS:
Tonnage shall be established at the Contractor's facility prior to shipment, and confirmed in writing.
a. Total weight (per ton) shipped by the Contractor will be confirmed by the Project Inspector (PI).
b. A State Certified Weight Ticket shall be provided to the PI.
c. Hand written weight tickets WILL NOT be accepted
PLACE OF DELIVERY: The hay shall be delivered, unloaded, and stacked by the contractor at the following location:
Rock Springs Wild Horse and Burro Facility Lionkol Road Rock Springs, WY 82901 Point of Contact: Jacob Benson- (307) 350-0002
TIME OF DELIVERY: shall be delivered upon request of the Rock Springs Wild Horse and Burro Facility. Period of performance throughout the contract: 09/06/2022 – 09/05/2023
UNLOADING AT DESTINATION
a. The Contractor shall be responsible for unloading and stacking the hay bales under the hay shed and in other designated areas at Rock Springs Wild Horse and Burro Facility. Also the contractor shall provide appropriate machinery to unload the hay and stack the hay 6 bales high in the hay sheds. Skid steers will not be allowed to unload hay because of how high the hay will be stacked and having the bales stacked correctly.
b. Three (3) work days prior to shipping the hay, the Contractor shall furnish to the PI the following:
1. Anticipated shipment date;
2. Anticipated total tonnage to be shipped; and
3. The name of the carrier responsible for the shipment.
b. Delivery shall be made between the hours of 7:30 a.m. and 3:30 p.m., local time, Monday through Friday, excluding weekends and national holidays.
c. If an emergency occurs, deliveries may be requested for a Saturday, Sunday, or national holiday, providing the Contractor notifies the PI on the preceding Friday and/or within the preceding work day of the delivery date.
Evaluation Methodology This procurement will be evaluated using the lowest price technically acceptable (LPTA) methodology. Vendors shall provide the following to be considered technically acceptable:
1. Assurance the alfalfa and grass is from 2022 crop.
2. Assurance the alfalfa and grass is domestically grown.
3. Assurance the alfalfa and grass will be leafy, green, well cured, properly stored and free of dust, mold, or heating. Hay must pass a visual inspection prior to being accepted.
4. Assurance the grass will be timothy, orchard, and brome grasses mixed.
4. Assurance the alfalfa and grass will be barn stored or covered with hay tarps. Any hay stored outside uncovered must be free from any weather-related damage.
5. Assurance the alfalfa and grass will be free of any Russian Thistle or prickly herb, "Cheat" grass, and any other weed or grass not considered healthy forage for domestic animals.
6. Unloading plan that details the equipment to be used in the completion of this procurement (found in Section Uploading at Destination).
7. Assurance of bond requirements within solicitation in accordance with 52.228-16 Performance and Payment Bonds-Other than Construction
Payments
Payment schedule shall be proposed by the vendor and incorporated into the contract upon award.
File details come from the government source that posted it. Updated .