A04_-_SOW-VC_Boiler.pdf

PDF 67 KB Posted

Attached to
BLRI-REPLACE VISITOR CENTER BOILER Federal contract opportunity
Solicitation number
140P5324Q0029
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is a Statement of Work (SOW) for the removal and replacement of an existing boiler at the Asheville Visitor Center on the Blue Ridge Parkway. The work includes disconnecting the existing boiler, disposing of it, and furnishing and installing a new 199K BTUH gas-fired floor model boiler, reconnecting all electrical, mechanical, and control systems, and performing system startup and testing.

The related federal contract opportunity is a combined synopsis/solicitation (Solicitation Number 140P5324Q0029) issued by the National Park Service, Blue Ridge Parkway, for a vendor to perform this work. This is a firm fixed-price, 100% small business set-aside procurement with a period of performance from 7/1/2024 to 9/30/2024. The NAICS code is 238220 Plumbing, Heating, and Air-Conditioning Contractors with a $19 million size standard. Vendor questions are due by 6/14/2024, and quotes are due by 6/21/2024.

View the file

Other files for this federal contract opportunity

Other files attached to BLRI-REPLACE VISITOR CENTER BOILER, newest first.
File Type Posted
Sol_140P5324Q0029_Amd_0002.pdf PDF
Site_Visit_Sign_in_0002.pdf PDF
Questions_and_Answers_0002.pdf PDF
Sol_140P5324Q0029_Amd_0001.pdf PDF
Sol_140P5324Q0029.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Furnish & Install Boiler at Asheville Visitor Center, Blue Ridge Parkway

PART 1 GENERAL

1.1 DESCRIPTION

The work consists of removing existing HTI boiler from Asheville VC, disposal of the unit off park lands, and replacing with new Boiler as specified. The Contractor is to furnish and install unit in accordance with manufacturer’s specifications.

1.2 LOCATION AND ACCESS

The work is located at: 199 Hemphill Knob Road, Asheville, NC 28805

1.3 CONTRACTOR FURNISHED ITEMS

The contractor shall furnish all supervision, labor, transportation, equipment, tools, materials, layout and incidentals necessary to complete the contract requirements.

1.4 SITE CONDITIONS:

A. This site is an occupied unit and access inside mechanical room must be approved by the maintenance supervisor.

B. Coordinate all work with the Contracting Officer’s Technical Representative (COTR).

1.5 CONSTRUCTION CAMP:

A. Establishment of a camp within the park will not be permitted.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and the Park Staff working out of this facility.

C. Confine storage of materials to work area designated by the COTR. Confine all operations to work limits of the projects. Keep fire hazard to a minimum; remove from the site daily all oily rags, waste, and other combustibles. Place hazardous waste in marked containers, daily. Remove all trash and debris from the Government site to an approved facility off Government property.

D. Existing Utilities:

1. Contractor shall be responsible for locating and preventing damage to known utilities, if damage occurs, repair utility at no additional expense to the Government.

2. If damage occurs to an unknown utility, utility will be repaired by the contractor, an equitable adjustment will be made in accordance with the Changes clause of the contract.

3. Interruption of Existing Utility Service must have prior approval from the COTR.

1.6 FIELD VERIFICATION

A. Field verify all dimensions affecting the work of this contract before ordering products.

1.7 QUALITY ASSURANCE

All work and materials shall comply with the requirements of the National Electrical Code (NEC), American Association of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE), and all applicable local, state and federal codes, standards and regulations.

PART 2 MATERIALS

2.1 GENERAL

A. The contractor shall furnish all equipment, materials, labor and incidentals required for installation of the new heating and cooling system.

B. All parts and labor shall be warranted for a minimum of one (1) year from time of start-up of the system by contractor.

2.2 MATERIAL SPECIFICATIONS

A. FURNISH AND INSTALL ONE (1) 199K BTUH GAS FIRE FLOOR MODEL BOILER

BACK IN PLACE OF EXISTING.

B. RECONNECT TO EXISTING BOILER PIPING, POWER WIRING, CONTROL WIRING,

COMBUSTION PIPING, AND GAS PIPING

C. All Parts and Connections necessary for the turnkey operation of these units.

D. Perform systems start up and operations check.

PART 3 WORK REQUIREMENTS

A. All work for removal and installation of equipment will be done by contractor in accordance with specifications to provide a turnkey job. Location of all equipment will be designated by the Government. Equipment will be installed to existing power and piping.

B. This Project is subject to the Davis Bacon Act and the attached Wage Schedules.

PART 4 CONTRACT CLOSE OUT AND PAYMENT

A. Perform complete system startup to check lines and operation of unit.

B. Instruct government personnel in the proper operation and maintenance of the system and provide operation manuals and information.

C. Provide equipment warranty information to the designated Government representative.

D. Remove all trash and debris from Government property. Leave job site neat and clean.

E. Payment will be made at the lump sum price quoted price for work completed by the Contractor and accepted by the Government.