A04_SOW_SND_Fire_Facilities_Pest_Control_Final_07-10-2023.docx
DOCX document 8 MB Posted
- Attached to
- SND FIRE FACILITY PEST CONTROL Federal contract opportunity
- Solicitation number
- 140L3923Q0137
About this file
This scope of work document outlines pest control services required at four fire facilities operated by the Bureau of Land Management in southern Nevada. The contractor will be responsible for conducting initial surveys of the facilities to identify entry points for rodents and other pests, then developing and implementing an annual pest control plan. Services will include installing traps both inside and outside the buildings and applying EPA-registered insecticides. The period of performance is one base year with four optional one-year extensions. The solicitation number for this opportunity is 140L3923Q0137.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3923Q0137_Amd_0001.pdf | ||
| Sol_140L3923Q0137.pdf | ||
| B03_Wage_Determinations_Clark_County.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Service
FINAL
Southern Nevada District Office Las Vegas, NV
Pest Control Services at Red Rock Fire Station, Logandale Fire Station, Pahrump Fire Station, and Las Vegas Interagency Communication Center Southern Nevada District
Bureau of Land Management Nevada
1.0 Project Introduction
Project Name: Pest Control Services at Southern Nevada Fire Facilities Address:
BLM-SNDO
4701 North Torrey Pines Drive Las Vegas NV 89130
1.1 Location of Facilities
The Red Rock Fire Station is located on Moenkopi Road, west of Las Vegas. Moenkopi Road intersects SR-159 approximately 3.3 miles west of the Bruce Woodbury Beltway. The Red Rock Fire Station complex is situated approximately 0.6 miles south of the SR-159/Moenkopi Road intersection. The address is 2925 Moenkopi Rd. Las Vegas, NV 89135
The Logandale Fire Station is located on I-15 exit 93, North of Las Vegas. The Fire Station is situated approximately 0.27 miles west of exit 93, East of Pahrump.
The Pahrump Fire Station is located on SR 160, Southeast of Pahrump. The Fire Station is situated approximately 0.90 miles East of the SR 160/Carpenter Canyon Road intersection. The address is 7501 Chromium Blvd. Pahrump, NV 89040.
The Las Vegas Interagency Communication Center is located at 2980 N Rancho Dr, Las Vegas, NV 89130.
Section 4.0 of this Statement of Work shows maps to each site.
The facilities covered under this Statement of Work are located at the Red Rock Fire Station, the Logandale Fire Station, the Pahrump Fire Station, and the Las Vegas Interagency Communication Center. Unless indicated otherwise in the listings below, Section 5.0 of this Statement of Work provides the physical layout and floorplans of these facilities.
1.1.1 Red Rock Fire Station, 2025 Moenkopi Rd. Las Vegas, NV 89135 Engine Bay-6,384 sf Law Enforcement Office Building-2,312 sf Barracks and Engine Office-3,524 sf
1.1.2 Logandale Fire Station- I-15 exit 93, Logandale, NV 89040 Engine Bay-5,160 sf Crew Quarters-3,524 sf
1.1.3 Pahrump Fire Station. 7501 Chromium Blvd. Pahrump, NV 89061 Engine Bay-2,340 sf Crew Quarters-1,769 sf
1.1.4 Las Vegas Interagency Communication Center. 2980 N. Rancho Rd. Las Vegas, NV 89130.
Building Area: 4,940 sf
1.2 Short Description of Required Services
The BLM places a high priority on preserving the health and safety of all employees, partners, volunteers, and the visiting public and therefore requires ongoing monitoring and control of pests throughout these areas. The Occupational Safety and Health Administration (OSHA) is one of the governing authorities driving the need for a pest control program. Specifically, the Code of Federal Regulations, 29 CFR 1910 Subpart J, Section 1910.141(a)(5), requires effective vermin control around every enclosed workplace. Also, the Department of the Interior (DOI) Departmental Manual 517 DM 1, Chapter 1 establishes the requirement for an integrated pest management policy for all DOI properties.
This contract is to obtain the services of a pest control contractor licensed and permitted in the State of Nevada for the control and removal of animals typically deemed a public health and safety hazard in and around public facilities (“pests”). These include, but are not limited to, insects, rodents, spiders, snakes, and scorpions. Pest control shall be performed in accordance with the Nevada Administrative Code (NAC) Chapter 555 - CONTROL OF INSECTS, PESTS, AND NOXIOUS WEEDS. As a minimum, the Contractor shall comply with NAC 555.250 - NAC 555.530 in the application of pesticides. Also, the Contractor shall employ certified applicators in accordance with NAC 555.600 - NAC 555.700.
0. BLM Points of Contact
Project Inspector (PI) Fire Operations Technician/Dispatch Center Manager (to be identified after contract award)
| 2.0 | CONTRACT REQuirements |
| 2.1 | Scope of Work and Summary/Requirements of Services To Be Performed |
The scope of work outlined in this section applies all facilities identified in Paragraph 1.1. All facilities are expected to have frequent services both inside and outside the buildings. The Contractor shall develop the pest control plan for each location per Paragraph 2.1.2.
2.1
2.1.1 Survey of Large Facilities
2.1.1.1 The Contractor shall perform an initial survey and evaluation of the following facilities, prior to start of pest control services: Red Rock Fire Station Law Enforcement Office, Red Rock Fire Station Engine Bay, Red Rock Fire Station, Engine Office/Crew Quarters, Logandale Fire Station Engine Bay, Logandale Fire Station Crew Quarters, Pahrump Fire Station Engine Bay, Pahrump Fire Station Crew Quarters, and the Las Vegas Interagency Dispatch Center.
2.1.1.1.1 The survey shall identify points of vulnerability that could allow for rodent entry into the building. These points of vulnerability shall be identified throughout the building exterior to include the roof, walls, window casings, door jambs, outdoor electrical ports, and foundation openings.
2.1.1.1.2 Upon completion of the building surveys, the Contractor shall summarize their findings in a written report to be provided to the COR. This report shall clearly and methodically identify all known points of vulnerability for each building. For each point of vulnerability, the Contractor shall provide a written recommendation on how to eliminate, or to the maximum extent practicable, how to mitigate the vulnerability.
2.1.2 Develop Pest Control Plan for BLM Approval
2.1.2.1 The contractor shall develop a plan for the trapping, extermination, and removal of pests indoors and outdoors, including roof, as applicable at all the listed facilities. The plan shall include the following:
2.1.2.1.1 A proposed list of traps, chemicals (lethal indoor and deterring outside), bait stations and other industry standards to be employed both inside and outside all facilities. The plan shall also identify the type of pest for which each of these items will be employed. These shall be subject to the Special Terms and Conditions listed in Section 2.1.5 of this Statement of Work.
2.1.2.1.2 A proposed schedule for trap installation, pesticide application, inspections, removal, cleanup, and other related work. The schedule shall recognize a need for flexibility in the event the Contractor and/or BLM identify surges in pest activity despite the current regimen.
2.1.2.1.3 A brief explanation for proposed pest control methods with sufficient detail to help BLM approve or disapprove.
2.1.2.2 Prior to the implementation of any pest control methods, the Contractor shall submit this plan for approval to the BLM COR. The BLM will review and provide written approval or disapproval of the Contractor’s proposed plan within five (5) working days of submission.
2.1.2.3 If the BLM disapproves of the proposed pest control plan submitted by the Contractor, the BLM will include written feedback. The Contractor shall revise and resubmit their pest control plan for approval to the BLM COR within two (2) working days after receiving the BLM’s written feedback. The BLM will review and provide written approval of the Contractor’s revised plan within two (2) working days of resubmission.
2.1.2.4 BLM’s written approval shall be construed as authorization for the contractor to proceed with the proposed pest control methods. The Contractor shall begin work within two (2) working days after receiving BLM’s written approval of their plan.
2.1.3 Pest Control Execution
2.1.3.1 The Contractor shall implement pest control services in accordance with the approved plan.
2.1.3.2 The Contractor shall coordinate with the appropriate BLM Project Inspector or Site Support staff member at the time of each visit.
2.1.3.3 In addition to the relevant sections in NAC 555, all work under this contract shall be performed in a manner which limits the exposure of third parties, such as members of the public as well as federal employees, to accidental exposure to pesticides.
2.1.3.4 The Contractor shall clean and sanitize, as required, areas where dead pests are removed.
2.1.3.5 The Contractor shall clean and sanitize feces and urine from pests in and around the covered facilities.
2.1.3.6 The contractor shall post warning signs and barriers where necessary at locations where pesticides are applied to ensure site employees or members of the general public are made aware of their use. The contractor shall remove warning signs and barriers in a timely manner when no longer necessary.
2.1.4 Adjustments to the Pest Control Regimen
2.1.4.1 If the BLM and the Contractor both agree that adjustments to the pest control regimen are required to improve its effectiveness, both parties will discuss the requirements.
2.1.4.2 The Contractor shall take no action to deviate from the latest approved plan until the BLM Contracting Officer notifies them to implement any changes.
2.1.5 Special Terms and Conditions for the Application of Pest Control
2.1.5.1 The use of bait traps containing poisonous materials is prohibited outside any publicly accessible area within the RRCNCA. However, bait traps containing poisonous materials may be used indoors. These include the Red Rock Fire Station Law Enforcement Office, Red Rock Fire Station Engine Bay, and Red Rock Fire Station Engine Office/Crew Quarters.
2.1.5.2 Notable Exceptions to the Use of Bait Traps: The BLM may allow the use of outdoor bait traps in limited areas. Any notable exceptions to Paragraph 2.1.5.1 will be provided in writing by the BLM to the Contractor.
2.1.5.3 Fumigation: Fumigation shall only be considered if, in the Contractor’s professional opinion, no other pest control method is effective, and is subject to BLM approval. The contractor shall coordinate with the COR at least five (5) days in advance of the use of fumigants. The contractor shall request in writing, and the COR shall provide written approval, for date and time of fumigation when required. Site employees shall ensure all items that must be protected from exposure to pesticides, such as kitchen equipment and utensils, are securely protected or removed prior to fumigation or spray.
2.1.5.4 Insecticides: BLM approved insecticides are listed below. Any insecticides not listed require written approval from the BLM per Paragraph 2.1.2 of this Statement of Work. BLM approved insecticides include the following:
| Trade Names |
| Common Names |
| EPA Registration |
No.
| Manufacturer |
| Formulations (Liquid or Granular) |
| Method of Application |
| Intended Application Rate |
| 1 |
| Onslaught |
| Benzeneacetate |
| 1021-1815 |
| MGK |
| Liquid |
| Sprayer |
| 0.05% |
| 2 |
| Talstar P |
| Bifenthrin |
| 279-3206 |
| FMC |
| Liquid |
| Sprayer |
| 0.06% |
2.2 Required Deliverables
2.2.1 Submit to the Contracting Officer, along with the contract proposal/bid: The contractor’s pest control certifications, granted from the State of Nevada.
2.2.2 Submit to the COR within ten (10) days of notice to proceed: Written report summarizing the initial building surveys in accordance with Paragraph 2.1.1 of this Statement of Work.
2.2.3 Submit to the COR within fifteen (15) days of notice to proceed: Pest control plan for BLM review and approval. The plan shall include Safety Data Sheets for all chemicals and pesticides.
2.2.4 If the Contractor is unable to meet the timelines outlined in Paragraphs 2.2.2 and 2.2.3, the Contractor shall request an extension of time from the Contracting Officer.
2.3 Working Hour Restrictions
All work shall be limited to the hours of 10:00 am to 3:00 pm unless otherwise approved by the COR. Coordination for site access needs to be scheduled with Bureau of Land Management COR in advance. No work shall occur on federal holidays or weekends without prior approval.
2.4 Smoking
Smoking within buildings or temporary storage sheds is prohibited and smoking areas are in open areas and will be away from entrances at least fifty feet away.
| 3.0 | PERFORMANCE REQUIREMENTS |
| 3.1 | Protection |
Protect any areas adjacent to the project site from any debris. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect personnel and public from injury.
3.2 Period of Performance
The duration of this contract will be a minimum of one year (Base Year). Up to four additional years may be awarded (Option Years) at the BLM’s discretion. If the BLM chooses to exercise any additional Option Years for this contract, the facility survey described in Section 2.1.1 will not be required in subsequent years. The expected Period of Performance for the Base Year and each of four potential Option Years is listed in the following table.
| Base Year |
| TBD through TBD 2024 |
| Option Year 1 |
| TBD, 2024 through TBD 2025 |
| Option Year 2 |
| TBD 2025 through TBD 2026 |
| Option Year 3 |
| TBD 2026 through TBD 2027 |
| Option Year 4 |
| TBD 2027 through TBD 2028 |
4.0 MAPS
4.1 Area Map of Las Vegas and Red Rock Fire Station
Red Rock Fire Station
4.2 Logandale Fire Station
4.3 Pahrump Fire Station
Red Rock Campground
4.4 Las Vegas Interagency Communication Center
5.0 BUILDING FLOORPLANS
5.1 Overview:
2.2.5 Red Rock Fire Station
2.2.6 Logandale Fire Station
1.1.37 Pahrump Fire Station
1.1.38 Las Vegas Interagency Communication Center
image1.jpeg image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png
File details come from the government source that posted it. Updated .