A04_SOW_RR_and_WBR_Pest_Control_07-11-2023.docx
DOCX document 6 MB Posted
- Attached to
- Red Rock Visitor Center Pest Control Federal contract opportunity
- Solicitation number
- 140L3923Q0138
About this file
This scope of work document outlines pest control services required at Red Rock Canyon National Conservation Area facilities. The Bureau of Land Management Nevada Region requires ongoing monitoring and control of pests at the Red Rock Canyon Visitor Center, campground, and associated buildings totaling over 27,000 square feet. Services include an initial facility survey, developing an approved pest control plan, implementing trap and chemical-based control methods for insects, rodents, spiders and other pests both inside and outside buildings. The contractor must have applicable Nevada pest control certifications. The base year of performance is one year with options to renew for up to four additional years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3923Q0138_Amd_0001.pdf | ||
| B03_Wage_Determinations_Clark_County.pdf | ||
| Sol_140L3923Q0138.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Service
FINAL
Southern Nevada District Office Las Vegas, NV
Pest Control Services at Red Rock Canyon National Conservation Area Southern Nevada District
Bureau of Land Management Nevada
1.0 Project Introduction
Project Name: Pest Control Services at Red Rock Canyon National Conservation Area Address:
BLM-SNDO
4701 North Torrey Pines Drive Las Vegas NV 89130
1.1 Location of Facilities
The Red Rock Canyon National Conservation Area Visitor’s Center is located just west of Las Vegas, NV. It is situated off State Route 159 (SR-159) approximately 5.25 miles west of the Bruce Woodbury Beltway.
The Red Rock Canyon NCA Campground is located on Moenkopi Road, west of Las Vegas. Moenkopi Road intersects SR-159 approximately 3.3 miles west of the Bruce Woodbury Beltway. The campground is situated approximately 1.25 miles south of the SR-159/Moenkopi Road intersection.
Section 4.0 of this Statement of Work shows maps to each site.
The facilities covered under this Statement of Work are located at the Red Rock Canyon NCA Visitor’s Center and Campground. The total facility area encompasses 27,290 sf. Unless indicated otherwise in the listings below, Section 5.0 of this Statement of Work provides the physical layout and floorplans of these facilities.
1.1.1 Red Rock Canyon NCA Visitor’s Center Building, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Building Area: 10,080 sf
1.1.2 Red Rock Canyon NCA Visitor’s Center Outdoor Exhibits, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Enclosed Pavilions (3 each): 100 sf per pavilion Amphitheater: 5,640 sf Outdoor Exhibit Area Back Restroom/Storage Area: 300 sf
1.1.3 Red Rock Canyon NCA Visitor’s Center Administrative Building, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Building Area: 7,490 sf
· Include all closets, storage rooms, system room, and storage connex adjacent to the facility.
1.1.4 Red Rock Canyon NCA Visitor’s Center Upper Restroom Facility, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Building Area: 1,170 sf
· Include storage room and janitor’s closet
1.1.5 Red Rock Canyon NCA Visitor’s Center Lower Restroom Facility, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Building Area: 1,060 sf
· Include storage room and janitor’s closet
1.1.6 Red Rock Canyon NCA Visitor’s Center Fee Station and Fee booths, 1000 Scenic Loop Dr., Las Vegas, NV 89161 Main Fee Station Building: 1,380 sf
· Include storage room and exterior cage External Fee Booths (2 each): 70 sf per fee booth
1.1.7 Red Rock Canyon NCA Visitor’s Center Water Distribution Pumphouse. 1000 Scenic Loop Dr., Las Vegas, NV 89161. The entry road to the pumphouse is 0.25 mile west of the entry to the Red Rock Visitor Center, along State Route 159 (SR-159).
Building Area: 216 sf
* No floorplan shown in Section 5.0 due to simple layout.
1.1.8 Red Rock Canyon NCA Campground – storage sheds, camp host sheds. 3293 Moenkopi Rd., Las Vegas, NV 89161 Building Area: 300 sf
* No floorplans shown in Section 5.0 due to simple layout.
1.2 Short Description of Required Services
Due to ever-growing popularity and visitation across the Red Rock Canyon National Conservation Area (RRCNCA), the BLM places a high priority on preserving the health and safety of all employees, partners, volunteers, and the visiting public and therefore requires ongoing monitoring and control of pests throughout these areas. The Occupational Safety and Health Administration (OSHA) is one of the governing authorities driving the need for a pest control program. Specifically, the Code of Federal Regulations, 29 CFR 1910 Subpart J, Section 1910.141(a)(5), requires effective vermin control around every enclosed workplace. Also, the Department of the Interior (DOI) Departmental Manual 517 DM 1, Chapter 1 establishes the requirement for an integrated pest management policy for all DOI properties.
This contract is to obtain the services of a pest control contractor licensed and permitted in the State of Nevada for the control and removal of animals typically deemed a public health and safety hazard in and around public facilities (“pests”). These include, but are not limited to, insects, rodents, spiders, snakes, and scorpions. Pest control shall be performed in accordance with the Nevada Administrative Code (NAC) Chapter 555 - CONTROL OF INSECTS, PESTS, AND NOXIOUS WEEDS. As a minimum, the Contractor shall comply with NAC 555.250 - NAC 555.530 in the application of pesticides. Also, the Contractor shall employ certified applicators in accordance with NAC 555.600 - NAC 555.700.
| 2.0 | CONTRACT REQuirements |
| 2.1 | Scope of Work and Summary/Requirements of Services To Be Performed |
2.1 RRCNCA requires pest control services both inside and outside the buildings. The Contractor shall develop the pest control plan/schedule for each facility per Paragraph 2.1.2.
2.1.1 Facility Survey
2.1.1.1 The Contractor shall perform an initial survey and evaluation of all facilities covered under this contract prior to start of pest control services.
2.1.1.1.1 The survey shall identify throughout each building points of vulnerability that could allow rodents and other pests to enter the building. These points of vulnerability shall be identified throughout the building exterior to include the roof, walls, window casings, door jambs, outdoor electrical ports, and foundation openings.
2.1.1.1.2 Upon completion of the building surveys, the Contractor shall summarize their findings in a written report to be provided to the COR. This report shall clearly and methodically identify all known points of vulnerability for each building. For each point of vulnerability, the Contractor shall provide a written recommendation on how to eliminate, or to the maximum extent practicable, how to mitigate the vulnerability.
2.1.2 Develop Pest Control Plan for BLM Approval
2.1.2.1 The contractor shall develop a plan for the trapping, extermination, and removal of pests indoors and outdoors, including roof, of each facility. The plan shall include the following:
2.1.2.1.1 A proposed list of traps, chemicals (lethal indoor and deterring outside), BLM approved bait stations and other industry standards to be employed both inside and outside all facilities. This area is of high visibility to the public, and exterior measures should be inconspicuous. The plan shall also identify the type of pest for which each of these items will be employed. These shall be subject to the Special Terms and Conditions listed in Section 2.1.5 of this Statement of Work.
2.1.2.1.2 A proposed schedule for trap installation, BLM approved pesticide application, inspections, removal, cleanup, and other related work. The schedule shall recognize a need for flexibility in the event the Contractor and/or BLM identify surges in pest activity despite the current regimen.
2.1.2.1.3 A brief explanation for proposed pest control methods with sufficient detail to help BLM approve or disapprove.
2.1.2.2 Prior to the implementation of any pest control methods, the Contractor shall submit this plan for approval to the BLM COR. The BLM will review and provide written approval or disapproval of the Contractor’s proposed plan within five (5) working days of submission.
2.1.2.3 If the BLM disapproves of the proposed pest control plan submitted by the Contractor, the BLM will include written feedback. The Contractor shall revise and resubmit their pest control plan for approval to the BLM COR within two (2) working days after receiving the BLM’s written feedback. The BLM will review and provide written approval of the Contractor’s revised plan within two (2) working days of resubmission.
2.1.2.4 BLM’s written approval shall be construed as authorization for the contractor to proceed with the proposed pest control methods. The Contractor shall begin work within two (2) working days after receiving BLM’s written approval of their plan.
2.1.3 Pest Control Execution
2.1.3.1 The Contractor shall implement pest control services in accordance with the approved plan.
2.1.3.2 The Contractor shall coordinate with the appropriate BLM Project Inspector or COR at the time of each visit.
2.1.3.3 In addition to the relevant sections in NAC 555, all work under this contract shall be performed in a manner which limits the exposure of third parties, such as members of the public as well as federal employees and non-government employees and volunteers, to accidental exposure to pesticides.
2.1.3.4 The Contractor shall remove dead pests and clean and sanitize, as required, where dead pests are removed.
2.1.3.5 The Contractor shall clean and sanitize feces and urine from pests in and around the covered facilities.
2.1.3.6 The contractor may post warning signs and barriers at locations where pesticides are applied. These signs and barriers must be approved by the BLM prior to implementation. The contractor shall remove warning signs and barriers in a timely manner when no longer necessary.
2.1.4 Adjustments to the Pest Control Regimen
2.1.4.1 If the BLM and the Contractor both agree that adjustments to the pest control regimen are required to improve its effectiveness, both parties will discuss the requirements and the Contractor shall provide written recommendations for BLM approval.
2.1.4.2 The Contractor shall take no action to deviate from the latest approved plan until the BLM Contracting Officer notifies them to implement any changes in writing.
2.1.5 Special Terms and Conditions for the Application of Pest Control
2.1.5.1 The use of bait traps containing poisonous materials is prohibited outside any publicly accessible area within the RRCNCA. These include all facilities as identified in this statement of work. However, bait traps containing poisonous materials may be used indoors.
2.1.5.2 Notable Exceptions to the Use of Bait Traps: With prior approval from the COR, the BLM may allow the use of outdoor bait traps in limited areas. Any notable exceptions to Paragraph 2.1.5.1 will be provided in writing by the BLM to the Contractor.
2.1.5.3 Fumigation: Fumigation shall only be considered if, in the Contractor’s professional opinion, no other pest control method is effective, and is subject to BLM approval. The contractor shall coordinate with the COR at least five (5) days in advance of the use of fumigants. The contractor shall request in writing, and the COR shall provide written approval, for date and time of fumigation when required. Site employees shall ensure all items that must be protected from exposure to pesticides, such as kitchen equipment and utensils, are securely protected or removed prior to fumigation or spray.
2.1.5.4 Insecticides: BLM approved insecticides are listed below. Any insecticides not listed require written approval from the BLM per Paragraph 2.1.2 of this Statement of Work. BLM approved insecticides include the following:
| Trade Names |
| Common Names |
| EPA Registration |
No.
| Manufacturer |
| Formulations (Liquid or Granular) |
| Method of Application |
| Intended Application Rate |
| 1 |
| Onslaught |
| Benzeneacetate |
| 1021-1815 |
| MGK |
| Liquid |
| Sprayer |
| 0.05% |
| 2 |
| Talstar P |
| Bifenthrin |
| 279-3206 |
| FMC |
| Liquid |
| Sprayer |
| 0.06% |
2.2 Required Deliverables
2.2.1 Submit to the Contracting Officer, along with the contract proposal/bid: The contractor’s pest control certifications, granted from the State of Nevada.
2.2.2 Submit to the COR within ten (10) days of notice to proceed: Written report summarizing the initial building surveys in accordance with Paragraph 2.1.1 of this Statement of Work.
2.2.3 Submit to the COR within fifteen (15) days of notice to proceed: Pest control plan for BLM review and approval. The plan shall include Safety Data Sheets for all chemicals and pesticides.
2.2.4 If the Contractor is unable to meet the timelines outlined in Paragraphs 2.2.2 and 2.2.3, the Contractor shall request an extension of time from the Contracting Officer.
2.2 Parking Restrictions
The Contractor shall park in an area designated by the BLM.
2.3 Working Hour Restrictions
All work shall be limited to the hours of 7:00 am to 5:00 pm unless otherwise approved by the COR. Coordination for site access needs to be scheduled with Bureau of Land Management COR in advance. No work shall occur on federal holidays or weekends without prior approval.
2.4 Smoking
Smoking within buildings or temporary storage sheds is prohibited and smoking areas are in open areas and will be away from entrances at least fifty feet away.
| 3.0 | PERFORMANCE REQUIREMENTS |
| 3.1 | Protection |
Protect any areas adjacent to the project site from any debris. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect personnel and public from injury.
3.2 Period of Performance
The duration of this contract will be a minimum of one year (Base Year). Up to four additional years may be awarded (Option Years) at the BLM’s discretion. If the BLM chooses to exercise any additional Option Years for this contract, the facility survey described in Section 2.1.1 will not be required in subsequent years. The expected Period of Performance for the Base Year and each of four potential Option Years is listed in the following table.
| Base Year |
| TBD through TBD 2024 |
| Option Year 1 |
| TBD, 2024 through TBD 2025 |
| Option Year 2 |
| TBD 2025 through TBD 2026 |
| Option Year 3 |
| TBD 2026 through TBD 2027 |
| Option Year 4 |
| TBD 2027 through TBD 2028 |
| 4.0 | MAPS |
| 4.1 | Area Map of Las Vegas and Red Rock Canyon |
Red Rock Campground Red Rock Canyon Visitor’s Center
4.2 Red Rock Canyon National Conservation Area Visitor’s Center Fee Station and Fee Booths Water Distribution Pumphouse and Wellhead RRCNCA Entrance Gate Wellhead Delivery Entrance Gate Visitor’s Center 36.130425, -115.427911
36.130425, -115.427911
36.130425, -115.427911
4.3 Red Rock Campground
Red Rock Campground
5.0 BUILDING FLOORPLANS
5.1 Overview: Red Rock Visitor Center Facilities Requiring Pest Control Coverage 5.1
5.1.1 Main Red Rock Visitor’s Center Complex
Amphitheater Red Rock Visitor’s Center Building Outdoor Exhibit Area with Enclosed Pavilions Red Rock Admin Building
Red Rock Visitor’s Center Lower Restrooms Red Rock Visitor’s Center Upper Restrooms (Attached to the Visitor’s Center Bldg) Outdoor Exhibit Area Restroom/Storage Bldg
5.1.2 Red Rock Fee Station
Fee Booths (Under Shade Structures) Main Fee Station Building
5.2 Red Rock Visitor’s Center Building (With Adjoining Upper Restrooms) Mechanical Room: Outside Access Only Panoramic Window Class Room Exhibit Area
Store Room Outdoor Enclosed Equipment Area Gift Shop
External Restrooms - AREA 1,170 SF Storage: Outside Access Only
TOTAL AREA: 11,250 SF (INCLUDING RESTROOMS)
5.3 Red Rock Visitor’s Center Amphitheater
TOTAL AREA: 5,640 SF
5.4 Red Rock Visitor’s Center Outdoor Exhibits
Outdoor Exhibit Pavilions - AREA: 100 SF EACH
Back Restroom/Storage - AREA: 300 SF
5.5 Red Rock Visitor’s Center Administrative Building
Storage Room: Outside Access Only Elec/Mech/IT Rooms: Outside Access Only Patio
Patio
TOTAL AREA: 7,490 SF
5.6 Red Rock Visitor’s Center Lower Restrooms
TOTAL AREA: 1,060 SF
5.7 Red Rock Visitor’s Center Fee Station with Fee Booths
Main Fee Station Building - AREA: 1,380 SF Fee Booths - AREA: 70 SF EACH image3.png image4.png image5.png image6.png image7.emf image70.emf image8.png image9.emf image10.emf image11.emf image90.emf image100.emf image110.emf image12.emf image120.emf image13.emf image14.png image15.emf image16.emf image160.emf image17.png image18.png image19.png image1.jpeg image2.png
File details come from the government source that posted it. Updated .