A04_SOW_HVAC_replacement_EFMO.pdf

PDF 2 MB Posted

Attached to
HVAC Federal contract opportunity
Solicitation number
140P6021R0008
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to HVAC, newest first.
File Type Posted
Sol_140P6021R0008_Amd_0001.pdf PDF
Sol_140P6021R0008.pdf PDF
A21_MISC_COVID-19_Mask_Policy.pdf PDF
B03_DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

STATEMENT OF WORK

For

Effigy Mounds National Monument

Maintenance Complex Buildings HVAC and Water Heater Replacement Project

PMIS 224517

NATIONAL PARK SERVICE

February 12, 2021

2 | P a g e

Table of Contents

Division 01 – General Requirements

Division 02 – Gas Fired Furnaces with Cooling

Division 03 – Drawings or Pictures

Division 04 – Attachments

DIVISION 01

GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: This Statement of Work (SOW) is for the replacement of seven forced-air HVAC systems, including one unit heater, and one potable water heater. All work and components shall be installed in a manner consistent with all applicable building codes, manufacturer’s instructions and warranty requirements, and acceptable practices. All work shall be limited to the Maintenance Complex Buildings at Effigy Mounds National Monument (EFMO). In the mid-1990’s HVAC systems were installed in the Effigy Mounds National Monument Maintenance Complex Buildings. EFMO has been experiencing periodic malfunctions with the HVAC systems that have required service technicians to repair.

Furthermore, the HVAC systems and water heater are nearing their life expectancy. The intent of this project is to replace the furnaces with new furnaces prior to a major malfunction.

1.2 Work Covered by the Contract Documents:

A. Project Location: Effigy Mounds National Monument Maintenance Complex 151 Hwy. 76

Harpers Ferry, IA 52146

1. Work consists of: All necessary HVAC components, hardware, materials and labor shall be provided by the offeror to remove existing systems and install seven (7) HVAC systems to include the six (6) forced-air LP furnaces and air conditioner units (ACU), one

(1) hanging unit heater, all connecting ductwork to the existing ducts, other utility connections and piping, new condensation pumps, new digital thermostats for each HVAC unit, and one (1) potable water heater. All HVAC and water heater system components will be replaced with the exception of the distribution ductwork, piping, and accessories, and the system will be tested upon completion. All work will be performed under a single contract.

3 | P a g e

2. The work shall conform to those standards stipulated in the building code, mechanical code, plumbing code, and electrical code applicable in the local jurisdiction. The Contractor shall use materials and installation methods identified in the local jurisdiction codes and this Statement of Work.

3. Contractor shall verify all site conditions, quantities, measurements, and project requirements with the COR. A site visit is encouraged to view the existing systems to verify installation locations.

4. The contractor must have and identify a maintenance service program provider within a 100-mile radius of project location and must be able to provide maintenance services within 24 hours of the reported incident.

5. The description of acceptable work includes, but is not limited to:

a. The equipment and system shall be installed in accordance with all approved building, plumbing, electrical, and health codes, and function as specified.

Installations shall pass initial code inspections at each phase.

b. The Contractor must be licensed in the code enforcement jurisdiction in which the project is located prior to beginning work.

c. All work is to be done by trained, experienced individuals. Workmanship shall be so as to require minimum repairs and patching after installation.

d. All systems must be optimally energy efficient per current code and must meet Energy Star high efficiency qualifications.

• All air conditioning units must have a minimum 17 SEER/13.0 EER rating.

• All furnaces must be at least 96% efficiency ratings (96.6 AFUE).

• Water heater must be Energy Star certified.

4 | P a g e

6. Minimum specifications of new furnaces. For sizing estimations, the existing HVAC and water heater units and their associated sizes are listed on the following chart. Replace units as per the sizing schedule below.

ITEM 2 - EXISTING UTILITIES – if applicable.

2.1 Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

2.4 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

2.4.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

Building Room(s) Unit Type

Furnace Input MBH

ACU

Tonnage

Fuel Type

Tank Size (gal)

Maintenance Office Building Offices

HVAC-Forced Air 40 2

LP

Gas

Maintenance Office Building

Maintenance Bay

HVAC-Forced Air 40

None Currently

- New Install 2 Ton

LP

Gas

Maintenance Office Building Carpentry Shop

HVAC-Forced Air 40 N/A

LP

Gas

Maintenance Office Building East Equip. Bay Unit Heater 60 N/A

LP

Gas

Maintenance Office Building

Mechanical Room Water Heater 35.5 N/A

LP

Gas 40

Old Maintenance Building L.E. Office

HVAC-Forced Air 40 2

LP

Gas

Administration Building Admin. Building HVAC-Forced Air 80 2

LP

Gas

Resources Building Resources Building

HVAC-Forced Air 80 2

LP

Gas

5 | P a g e

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Park laws and policies can be found at https://www.nps.gov/sacn/learn/management/lawsandpolicies.htm.

A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, during a government shutdown, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to employee entrances, mechanical rooms where furnaces are located, and routes leading to the mechanical rooms. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Driveways and Entrances: The contractor will have ample space to park vehicles near the buildings in the Maintenance Complex Parking Area.

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

7. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion.

Perform control operations lawfully, using environmentally safe materials.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.

https://www.nps.gov/sacn/learn/management/lawsandpolicies.htm

6 | P a g e

B. Dispose of waste materials legally.

C. Recycling of materials is highly encouraged.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

3.10 Fire and Life Safety:

As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

1. Immediately report all spills of hazardous materials to the park.

2. Maintain a spill emergency response kit.

3. Train employees how to respond to a spill and use the emergency response kit.

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on-ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit.

Please see FAR 52.236-27 - Site Visit (Construction).

7 | P a g e

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at https://www.nps.gov/orgs/1671/upload/NPS-Reference_Standards-Sect-01-42-00.pdf.

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

A. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary personal protective equipment in good repair at all times.

7.2 Submittals:

A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:

1. Name of responsible supervisor to carry out the program

2. First aid procedures

3. Training, both initial and continuing

4. Planning for possible emergency situations

5. Contractor to identify nearest location of medical facility for emergencies

6. Recognition work that will be performed in remote areas with limited communication or cell phone coverage

B. Meeting and Inspection Reports: As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

8 | P a g e

7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch at 1-800-PARKTIP.

ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Provide submittals to the Contracting Officer.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule.

9 | P a g e

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: See 235416.13 Gas Fired Furnace with Cooling Specification

B. Product Data: Provide furnace, ACU, and thermostat specifications.

C. Samples: NA

D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.

E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendors.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the

10 | P a g e substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule to the Contracting Officer. Contracting Officer will review the Progress Schedule for format and content. If applicable, the first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

A sample Schedule of Values will be provided by the Contracting Officer.

ITEM 10 – TEMPORARY SERVICES

10.2 Fire Prevention and Protection:

A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be substantially complete, following the final inspection, the.

Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.

B. If the work is not determined to be substantially complete following the final inspection, the

Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

11 | P a g e

C. Contractor shall complete the Punch List within 30 calendar days, documented weather permitting.

D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.

F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

G. Disposition of any permits and warranties required by the specifications in this section.

11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of Substantial Completion.

B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.

C. Information shall include operation and maintenance manuals for each warranted material.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

12 | P a g e

Division 02

SECTION 235416.13

GAS-FIRED FURNACES WITH COOLING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SCOPE OF WORK

A. Project Location: Effigy Mounds National Monument Maintenance Complex 151 Hwy. 76 Harpers Ferry, IA 52146

B. Building(s) Name/Identifier: Maintenance Office Building, Old Maintenance Building (LE Office), Administration Building, and Resources Building

C. Section Includes:

1. Gas-fired, condensing furnaces and accessories complete with controls.

2. Air filters.

3. Condensing Units, Coils, and Refrigeration components.

4. Potable Water Heater

D. Demolition Work Includes:

1. Removal of existing gas-fired furnaces, coil and condensing units, and water heater.

2. Removal of propane pipe back to the main point of connection. Valve and cap pipe if not reused.

3. Evacuate and removal of refrigeration piping completely. Disconnect and remove condensing unit power and control wiring back to the power and control panels.

4. Removal of concrete pad or roof structure supporting condensing unit if not reused.

5. Patch and repair of all wall, ceiling, and floor penetrations to match existing conditions.

6. Repair of existing ductwork and insulation at the point of connection for new equipment.

E. Additional work as described by the NPS Representative at a Pre-installation Conference conducted at the Project Location.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include rated capacities, operating characteristics, furnished specialties, and accessories.

B. Shop Drawings:

13 | P a g e

1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

2. Include diagrams for power, signal, and control wiring.

1.4 INFORMATIONAL SUBMITTALS

A. Sample Warranty: For special warranty.

1.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For each furnace to include in emergency, operation, and maintenance manuals.

1. Include the following:

a. Furnace and accessories complete with controls.

b. Air filter.

c. Condensing Unit, Coil, and Refrigeration components.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Disposable Air Filters: Furnish 4 complete sets per unit.

1.7 QUALITY ASSURANCE

A. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup."

B. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."

C. Comply with NFPA 70.

1.8 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace the following components of furnaces that fail in materials or workmanship within specified warranty period:

1. Warranty Period, Commencing on Date of Substantial Completion:

a. Furnace Heat Exchanger: 20 years.

b. Integrated Ignition and Blower Control Circuit Board: Five years.

c. Draft-Inducer Motor: Five years.

d. Refrigeration Compressors: 5 years.

e. Evaporator and Condenser Coils: Five years.

14 | P a g e

PART 2 - PRODUCTS

2.1 ASSEMBLY DESCRIPTION

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a qualified testing agency, and marked for intended location and application.

2.2 GAS-FIRED FURNACES, CONDENSING

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following or approved equal:

1. Carrier Corporation; a unit of United Technologies Corp.

2. Bryant Heating & Cooling Systems; a unit of United Technologies Corp.

3. Lennox Industries, Inc.; Lennox International.

4. Rheem Manufacturing Company; Heating and Cooling Products.

5. Ruud Air Conditioning Division.

6. Other Approved Equals.

B. Cabinet: Galvanized steel.

1. Cabinet interior around heat exchanger shall be factory-installed insulation.

2. Lift-out panels shall expose burners and all other items requiring access for maintenance.

3. Factory paint external cabinets in manufacturer's standard color.

4. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

C. Fan: Centrifugal, factory balanced, resilient mounted, direct drive.

1. Special Motor Features, ECM: Electronically controlled motor (ECM) controlled by integrated furnace/blower control.

Select fuel type.

D. Type of Gas: Propane (LP)

E. Heat Exchanger:

1. Primary: Stainless steel.

F. Burner:

1. Gas Valve: 100 percent safety two (2) potion main gas valve, main shutoff valve, pressure regulator, safety pilot with electronic flame sensor, limit control, transformer, and combination ignition/fan timer control board.

2. Ignition: Electric pilot ignition, with hot-surface igniter or electric spark ignition.

G. Gas-Burner Safety Controls:

1. Electronic Flame Sensor: Prevents gas valve from opening until pilot flame is proven; stops gas flow on ignition failure.

2. Flame Rollout Switch: Installed on burner box; prevents burner operation.

3. Limit Control: Fixed stop at maximum permissible setting; de-energizes burner on excessive bonnet temperature; automatic reset.

http://www.specagent.com/Lookup?ulid=10016 http://www.specagent.com/Lookup?uid=123457150152 http://www.specagent.com/Lookup?uid=123457150159 http://www.specagent.com/Lookup?uid=123457150161 http://www.specagent.com/Lookup?uid=123457150162

15 | P a g e

H. Combustion-Air Inducer: Centrifugal fan with thermally protected motor and sleeve bearings pre-purges heat exchanger and vents combustion products; pressure switch prevents furnace operation if combustion-air inlet or flue outlet is blocked.

I. Furnace Controls: Solid-state board integrates ignition, heat, cooling, and fan speeds; adjustable fan-on and fan-off timing; terminals for connection to accessories; diagnostic light with viewport.

J. Accessories: Air Intake and Vent Pipes. Follow manufacturers recommendations for combustion piping size, configuration and distance requirements. Utilize existing wall or roof penetration locations.

1. CPVC Plastic Vent Materials:

a. CPVC Plastic Pipe: Schedule 40, complying with ASTM F441/F441M.

b. CPVC Plastic Fittings: Schedule 40, complying with ASTM F438, socket type.

c. CPVC Solvent Cement: ASTM F493.

2. PVC

K. Capacities and Characteristics:

L. All 40,000 BTU Furnace Carrier 58MVB040F04014 (Basic of Design)

1. Gas:

a. Type: Propane

b. Efficiency AFUE: 96%

c. Input: High 40,000/ low 26,000 Btu/h.

d. Heat Output: High 38,000,141/ Low 25,000 Btu/h.

e. Gas Connection Size: 1/2”.

f. Combustion-Air Connection Inlet Size: 2”

g. Combustion-Air Inlet Material: CPVC.

h. Heat-Exchanger Condensate Drain Size: 1/2”

i. Vent Connection Size: 2”

j. Vent Material: CPVC.

2. Fan & Furnace Electrical Connection:

a. Airflow: 700 cfm.

b. External Static Pressure: 0.5 inches wg.

c. Motor:

1) Size:1/2 horsepower.

2) Speed: Variable.

d. Volts: 120.

e. Phase: Single.

f. Hertz: 60.

g. Full-Load Amperes (FLA): 8.9.

h. Maximum Overcurrent Protection (MOP): 15

M. All 80,000 BTU Furnace Carrier 58MVB080F10014 (Basic of Design)

1. Gas:

a. Type: Propane

16 | P a g e

b. Efficiency AFUE: 96%

c. Input: High 80,000/ low 52,000 Btu/h.

d. Heat Output: High 75,000/ Low 49,000 Btu/h.

e. Gas Connection Size: 1/2”.

f. Combustion-Air Connection Inlet Size: 2”

g. Combustion-Air Inlet Material: CPVC.

h. Heat-Exchanger Condensate Drain Size: 1/2”

i. Vent Connection Size: 2”

j. Vent Material: CPVC.

2. Fan & Furnace Electrical Connection:

a. Airflow:1380 cfm.

b. External Static Pressure: 0.5 inches wg.

c. Motor:

1) Size:1/2 horsepower.

2) Speed: Variable.

d. Volts: 120.

e. Phase: Single.

f. Hertz: 60.

g. Full-Load Amperes (FLA): 12.8.

h. Maximum Overcurrent Protection (MOP): 15

N. 60,000 BTU Unit Modine HD60 (Basic of Design)

1. Gas:

a. Type: Propane

b. Efficiency AFUE: 82%

c. Input: High 60,000 Btu/h.

d. Heat Output: High 49,200 Btu/h.

e. Gas Connection Size: 1/2”.

2. Unit Fan & Electrical Connection:

a. Airflow:990 cfm.

b. External Static Pressure: 0.5 inches wg.

c. Motor:

1) Size:1/12 horsepower.

2) Speed: Single.

d. Volts: 120.

e. Phase: Single.

f. Hertz: 60.

g. Total Amperes: 3.75.

h. Maximum Overcurrent Protection (MOP): 15

For sizing estimations, the existing HVAC and water heater units and their associated sizes are listed on the following chart. Replace units as per the sizing schedule below.

17 | P a g e

2.3 THERMOSTATS

A. Controls shall comply with requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air Conditioning."

B. Solid-State Thermostat: Wall-mounted, programmable, microprocessor-based unit with automatic switching from heating to cooling, preferential rate control, seven-day programmability with minimum of four temperature presets per day, and battery backup protection against power failure for program settings.

C. Control Wiring: Utilize existing wire where applicable, otherwise install balanced twisted-pair cabling.

1. Description: Screened and shielded twisted pairs (F/FTP), No. 24 AWG, 100 ohms, four pair.

D. Seven (7) new programmable, digital thermostats shall be installed at the existing thermostat locations. The instruction booklet is to be provided to the Park’s COR along with all other manuals and documentation.

2.4 AIR FILTERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following or approved equal:

1. Aprilaire; Research Products Corp.

2. Filtrete Home Filtration Products; a 3M brand.

3. General Filters, Inc.

4. Permatron Corporation.

5. Glasfloss

Building Room(s) Unit Type

Furnace Input MBH

ACU

Tonnage

Fuel Type

Tank Size (gal)

Maintenance Office Building Offices

HVAC-Forced Air 40 2

LP

Gas

Maintenance Office Building

Maintenance Bay

HVAC-Forced Air 40

None Currently

- New Install 2

Ton

LP

Gas Maintenance Office Building Carpentry Shop

HVAC-Forced Air 40 N/A

LP

Gas

Maintenance Office Building East Equip. Bay Unit Heater 60 N/A

LP

Gas

Maintenance Office Building

Mechanical Room Water Heater 35.5 N/A

LP

Gas 40

Old Maintenance Building L.E. Office

HVAC-Forced Air 40 2

LP

Gas

Administration Building Admin. Building HVAC-Forced

Air 80 2

LP

Gas

Resources Building Resources Building

HVAC-Forced Air 80 2

LP

Gas http://www.specagent.com/Lookup?ulid=9880 http://www.specagent.com/Lookup?uid=123457150124 http://www.specagent.com/Lookup?uid=123457150125 http://www.specagent.com/Lookup?uid=123457150126 http://www.specagent.com/Lookup?uid=123457150127

18 | P a g e

B. Disposable Filters: 4” thick fiberglass media with ASHRAE 52.2 MERV rating of 10 or higher, in sheet metal frame. Heating units shall have filters installed. Provide four (4) replacement filters per air handling unit for future use.

2.5 REFRIGERATION COMPONENTS

A. General Refrigeration Component Requirements:

1. Refrigeration compressor, coils, and specialties shall be designed to operate with R-410A Refrigerant.

2. Refrigeration components and cooling system to be by the same manufacturer as the furnace with published cooling performance data as an assembly.

3. Energy Efficiency: All air conditioning units must have a minimum 15 SEER/12.5 EER rating. Equal to or greater than prescribed by ASHRAE/IES 90.1.

B. Refrigerant Coil: Copper tubes mechanically expanded into aluminum fins. Comply with AHRI 210/240. Match size with furnace. Include condensate drain pan with accessible drain outlet complying with ASHRAE 62.1.

1. Refrigerant Coil Enclosure: Steel, matching furnace width with access panel and flanges for integral mounting on furnace cabinet and galvanized sheet metal drain pan coated with black asphaltic base paint.

C. Refrigerant Line Kits: Annealed-copper suction and liquid lines factory cleaned, dried, pressurized with nitrogen, sealed, and with suction line insulated. Provide in standard lengths for installation without joints, except at equipment connections.

1. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C534/C534M, Type I, 1 inch (25 mm) thick.

D. Air-Cooled Compressor-Condenser Unit:

1. Casing: Steel, finished with baked enamel, with removable panels for access to controls, weep holes for water drainage, and mounting holes in base. Provide brass service valves, fittings, and gage ports on exterior of casing.

2. Compressor: Hermetically sealed scroll type.

a. Crankcase heater.

b. Vibration isolation mounts for compressor.

c. Compressor motor shall have thermal- and current-sensitive overload devices, start capacitor, relay, and contactor.

d. Two-speed compressor motors shall have manual-reset high-pressure switch and automatic-reset low-pressure switch.

e. Refrigerant: R-410A.

3. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins, complying with AHRI 210/240, and with liquid sub-cooler.

4. Fan: Aluminum-propeller type, directly connected to motor.

5. Motor: Permanently lubricated, with integral thermal-overload protection.

6. Low Ambient Kit: Permits operation down to 45 deg F (7 deg C).

7. Mounting Base: Concrete

E. Capacities and Characteristics:

19 | P a g e

1. For All 2-ton Units Refrigerant Coil: Carrier CNPVP2414ACA (Bases of Design)

a. Total Cooling Capacity: 24,000 Btu/h.

b. Condensate Drain Size: 3/4”.

2. For All 2-ton Units Compressor-Condenser Units: Carrier 24ACCB724A0030 (Bases of

Design)

a. Cooling Energy Efficiency 17 SEER/13 EER

b. Volts: 208/230

c. Phase: Single

d. Hertz: 60.

e. Minimum Circuit Ampacity (MCA): 14.5.

f. Maximum Overcurrent Protection (MOP): 20.

For sizing estimations, the existing HVAC and water heater units and their associated sizes are listed on the following chart. Replace units as per the sizing schedule below.

2.6 POTABLE WATER HEATER

A. Capacities and Characteristics: A.O Smith GCB-40 (Basis of Design)

1. Type: Propane

2. Capacity: 38 gallons

3. Recovery 90 deg rise gallon per hour: 36,000 btu.

4. MBH: 36.0

Building Room(s) Unit Type

Furnace Input MBH

ACU

Tonnage

Fuel Type

Tank Size (gal)

Maintenance Office Building Offices

HVAC-Forced Air 40 2

LP

Gas

Maintenance Office Building

Maintenance Bay

HVAC-Forced Air 40

None Currently

- New Install 2

Ton

LP

Gas Maintenance Office Building Carpentry Shop

HVAC-Forced Air 40 N/A

LP

Gas

Maintenance Office Building East Equip. Bay Unit Heater 60 N/A

LP

Gas

Maintenance Office Building

Mechanical Room Water Heater 35.5 N/A

LP

Gas 40

Old Maintenance Building L.E. Office

HVAC-Forced Air 40 2

LP

Gas

Administration Building Admin. Building HVAC-Forced

Air 80 2

LP

Gas

Resources Building Resources Building

HVAC-Forced Air 80 2

LP

Gas

20 | P a g e

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine factory-installed insulation before furnace installation. Reject units that are wet, moisture damaged, or mold damaged.

C. Examine roughing-in for gas and refrigerant piping systems to verify actual locations of piping connections before equipment installation.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install gas-fired furnaces and associated fuel and vent features and systems according to

NFPA 54.

B. Suspended Units: Suspend from structure using threaded rods, spring hangers, and building attachments. Secure rods to unit hanger attachments. Adjust hangers so unit is level and plumb.

C. Base-Mounted Units: Secure units to substrate. Provide optional bottom closure base if required by installation conditions.

D. Controls: Install thermostats at existing locations, or for new installations, at mounting height of 60 inches (1500 mm) above floor.

E. Wiring Method: Utilize existing wiring, or for new wiring, install control wiring in accessible ceiling spaces and in gypsum board partitions where unenclosed wiring method may be used. Conceal control wiring except in unfinished spaces.

3.3 Install ground-mounted, compressor-condenser components on 4-inch- (100-mm-) thick, reinforced concrete base; 4 inches (100 mm) larger on each side than unit. Coordinate anchor installation with concrete base. Utilize existing concrete pads where applicable. One new concrete pad will need to be constructed for the new Maintenance Building – Maintenance Bay ACU, which currently does not exist. This new ACU pad shall be located adjacent to the existing Maintenance Office Building – Office ACU. New piping and electrical connections for the Maintenance Bay ACU will also need to be installed.

3.4 PIPING CONNECTIONS

A. Drawings indicate general arrangement of piping, fittings, and specialties. Connect gas piping with union or flange, a drip leg, and appliance connector valve.

B. Install piping adjacent to equipment to allow service and maintenance.

C. Vent and Combustion-Air Connection, Condensing, Gas-Fired Furnaces: Connect plastic piping vent material to furnace connections and extend outdoors. Terminate vent outdoors with a cap and in an arrangement that will protect against entry of birds, insects, and dirt.

1. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

21 | P a g e

2. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

3. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

a. Comply with ASTM F402 for safe-handling practice of cleaners, primers, and solvent cements.

b. CPVC Piping: Join according to ASTM D2846/D2846M, Appendix.

c. PVC Pressure Piping: Join schedule number ASTM D1785 PVC pipe and PVC socket fittings according to ASTM D2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D2855.

4. Slope pipe vent back to furnace or to outside terminal.

5. Vent and Combustion piping shall be sized according to manufacturer’s recommendations.

D. Connect refrigerant tubing kits to refrigerant coil in furnace and to air-cooled compressor-condenser unit.

1. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8/A5.8M.

E. Comply with manufacturer’s sizing requirements for installation and joint construction of refrigerant piping.

3.5 DUCTWORK CONNECTIONS

A. All ducts shall be properly sealed at the heat exchanger per energy code and shall not become loose or detached.

B. All ducts shall be installed per the manufacturer’s installation instructions. No duct shall be crimped, bent, or otherwise installed in such a manner as to restrict airflow. Any duct work leaving the heating or cooling unit shall not obstruct the unit in such a manner that the unit cannot be cleaned, filters changed, maintenance performed, etc.

C. The stiffening of ductwork and the gauge of the metal used shall be such that duct walls do not flex with pressure changes.

3.6 ELECTRICAL CONNECTIONS

A. Install electrical devices furnished by manufacturer, but not factory mounted, according to NFPA 70 and NECA 1.

B. Install nameplate for each electrical connection, indicating electrical equipment designation and circuit number feeding connection.

1. Nameplate shall be laminated acrylic or melamine plastic signs with a black background and engraved white letters at least 1/2 inch (13 mm) high.

3.7 CONTROL CONNECTIONS

A. Install control and electrical power wiring to field-mounted control devices.

22 | P a g e

3.8 STARTUP SERVICE

A. Complete installation and startup checks according to manufacturer's written instructions and perform the following:

1. Inspect for physical damage to unit casings.

2. Verify that access doors move freely and are weather tight.

3. Clean units and inspect for construction debris.

4. Verify that all bolts and screws are tight.

5. Adjust vibration isolation and flexible connections.

6. Verify that controls are connected and operational.

B. Start unit according to manufacturer's written instructions and complete manufacturer's operational checklist.

C. Measure and record airflows.

D. Verify proper operation of capacity control device.

E. After startup and performance test, lubricate bearings.

3.9 ADJUSTING

A. Adjust initial temperature and humidity set points.

B. Set controls, burner, and other adjustments for optimum heating performance and efficiency.

Adjust heat-distribution features, including shutters, dampers, and relays, to provide optimum heating performance and system efficiency.

3.10 CLEANING

A. After completing installation, clean furnaces internally according to manufacturer's written instructions.

B. Install new filters in each furnace after Substantial Completion.

3.11 FIELD QUALITY CONTROL

A. Perform the following tests and inspections:

1. Perform electrical test and visual and mechanical inspection.

2. Leak Test: After installation, charge systems with refrigerant and test for leaks. Repair leaks, replace lost refrigerant, and retest until no leaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation, product capability, and compliance with requirements.

4. Verify that fan wheel is rotating in the correct direction and is not vibrating or binding.

5. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

B. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.

3.12 DEMONSTRATION

A. Train Owner's maintenance personnel to adjust, operate, and maintain condensing units.

23 | P a g e

END OF SECTION

Division 03

Photos

Administration Building

24 | P a g e

Resource Building

25 | P a g e

Old Maintenance Building

26 | P a g e

Maintenance Building Office

27 | P a g e

Maintenance Building Vehicle Bays

28 | P a g e

Maintenance Building Wood Shop

29 | P a g e

Maintenance Building Water Heater

30 | P a g e

Division 04

Attachments

Submittal Checklist

CE

RT

./L

AB

T

ES

T

RE

PO

RT

/C

AL

C.

O R

PL

AN

M fg

. D

AT

A

IN

ST

RU

CT

IO

NS

SH

O

P

DR

AW

IN

G

SA

M

PL

E

M fg

. D

AT

A

IN

ST

RU

CT

IO

NS

235416 1.3 Product Data x

235416 1.3 Shop Drawing x

235416 1.4 Warranty x

235416 1.5 Closeout O&M x

235416 1.6 Extra Materials x

235416 3.10 Field Quality Control - Operational Test x

235416 3.11 Field Quality Control - Leak Test x

235416 3.12 Owner Training Summary x

SUBMITTAL LIST

Spec.

Sec.

Par.

No. Description

INFORMATIONAL ACTION

EFMO - 224517 - Maintenance Complex Buildings Furnaces Replacement

SUBMITTAL REQUIREMENTS (indicate with an "X")

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or poll...
7. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residu...
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the followin...
A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary personal protective equipment in good repair at all times.
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SCOPE OF WORK
A. Project Location: Effigy Mounds National Monument
Maintenance Complex
151 Hwy. 76
Harpers Ferry, IA 52146
B. Building(s) Name/Identifier: Maintenance Office Building, Old Maintenance Building (LE Office), Administration Building, and Resources Building
C. Section Includes:
1. Gas-fired, condensing furnaces and accessories complete with controls.
2. Air filters.
3. Condensing Units, Coils, and Refrigeration components.
4. Potable Water Heater
D. Demolition Work Includes:
1. Removal of existing gas-fired furnaces, coil and condensing units, and water heater.
2. Removal of propane pipe back to the main point of connection. Valve and cap pipe if not reused.
3. Evacuate and removal of refrigeration piping completely. Disconnect and remove condensing unit power and control wiring back to the power and control panels.
4. Removal of concrete pad or roof structure supporting condensing unit if not reused.
5. Patch and repair of all wall, ceiling, and floor penetrations to match existing conditions.
6. Repair of existing ductwork and insulation at the point of connection for new equipment.

E. Additional work as described by the NPS Representative at a Pre-installation Conference conducted at the Project Location.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, furnished specialties, and accessories.
B. Shop Drawings:
1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Include diagrams for power, signal, and control wiring.
1.4 INFORMATIONAL SUBMITTALS
A. Sample Warranty: For special warranty.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For each furnace to include in emergency, operation, and maintenance manuals.
1. Include the following:
a. Furnace and accessories complete with controls.
b. Air filter.
c. Condensing Unit, Coil, and Refrigeration components.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Disposable Air Filters: Furnish 4 complete sets per unit.
1.7 QUALITY ASSURANCE
A. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup."
B. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."
C. Comply with NFPA 70.
1.8 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace the following components of furnaces that fail in materials or workmanship within specified warranty period:
1. Warranty Period, Commencing on Date of Substantial Completion:
a. Furnace Heat Exchanger: 20 years.
b. Integrated Ignition and Blower Control Circuit Board: Five years.
c. Draft-Inducer Motor: Five years.
d. Refrigeration Compressors: 5 years.
e. Evaporator and Condenser Coils: Five years.
.
PART 2 - PRODUCTS
2.1 ASSEMBLY DESCRIPTION

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .