This statement of work outlines requirements for a bat exclusion project at the Quilcene National Fish Hatchery in Quilcene, Washington. The scope of work involves installing Coravent V-600T, Coravent V-600TE, or equivalent ridge vent material under the 220-foot-long ridge cap of the hatchery building and the 20-foot projection to prevent future bat intrusion while allowing proper ventilation. The contractor must supply all labor, equipment, and materials to carefully remove and reinstall the metal ridge cap, replacing any damaged sections, and properly install the ridge vent material. Work must be completed within 30 days of receiving all required permits and will be inspected by the Hatchery Manager for acceptance. The related federal contract opportunity is solicitation number 140FC323Q0035 for this bat exclusion project at the Quilcene NFH, issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC323Q0035_Amd_0001.pdf | ||
| B03_DOL_WAGE_DETERMINATION_FEB_23_2023.pdf | ||
| Sol_140FC323Q0035.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Quilcene National Fish Hatchery
Hatchery Building Ridge Cap Bat Exclusion 281 Fish Hatchery Rd, Quilcene, WA 98376
Drafted May 4, 2023
1. GENERAL: The U.S. Fish and Wildlife Service, Quilcene National Fish Hatchery located in Quilcene Washington is seeking to have to have Coravent V-600T, Coravent V-600TE or equivalent material installed under the ridge cap of its hatchery building. The current netting under the ridge cap does not keep out all bats and they can be present certain times of the year.
The contractor shall personally verify all measurements and materials, construct, deliver, and install per the following specifications.
2. SCOPE: The Hatchery building at Quilcene National Fish Hatchery is approximately 220 feet long and 30 feet high and requires Coravent V-600T, Coravent V-600TE or equivalent material installed under the ridge cap of its 220-foot length. In the center there is a 20-foot projection that also requires Coravent v-600T, Coravent V-600TE or equivalent material installed under its ridge cap. The purpose of this job is to provide protection from future bat invasion into the ridge cap and fill the space within the ridge cap where bats roost, all while allowing for proper ventilation. All materials and processes will be verified by the contractor.
The contractor shall supply all labor, equipment, and materials necessary to provide services for the following tasks:
1. Carefully remove metal ridge cap from Hatchery Building. Any damaged roof cap material will be replaced with new and equivalent material.
2. Install Coravent V-600T, Coravent V-600TE, or appropriate ridge vent material in a manner that will provide adequate air flow, help prevent future bat intrusion and fill the space within the ridge cap where bats roost.
3. Reinstall metal ridge cap using material removed in step 1
3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: Construction work on the project can begin after Award is given and the contractor has filed for and received all the proper permits needed to start the work. The contractor shall apply for permits immediately upon Award. Period of Performance shall be 30 days after approval/receipt of all required permits.
4. INSPECTION AND ACCEPTANCE: All contractor work will be inspected before acceptance by the Hatchery Manager or designee. Damaged or incorrect items will be rejected and replaced.
Contractor will be responsible for repairing any damaged utilities or infrastructure. These repairs will be made at the CONTRACTOR’s expense including any additional mechanical, structural, and electrical work.
Interested vendors are highly encouraged to make on-site visit prior to response. Vendors must call in advance to schedule access by calling Michael Vargo at (440) 596-7628
Award will be based on past performance and price. Solicitation responses shall include proposed material and product diagram, specifications, operators’ manual, estimated delivery date, and warranty.
5. GOVERNMENT FURNISHED EQUIPMENT OR MATERIALS/INFORMATION:
The contractor shall supply all labor, equipment, and materials necessary to provide services. By request from the contractor, limited power, water, and sanitary facilities may be made available if the use is not excessive and does not negatively impact hatchery operations.
6. AVAILABILITY: Normal duty hours are Monday through Friday 7:30 am to 3:30 pm.
Work shall be performed during these hours unless prearranged with the Hatchery Manager.
Federal holidays not included. Hatchery Manager has the authority to stop any work by the contractor that is deemed unsafe or negatively impacts the mission or operation of the Refuge.
TECHNICAL COORDINATOR: Call for Site Visit Michael Vargo Maintenance Mechanic Phone: (440) 596-7628 Email: Michael_Vargo@fws.gov
COR:
Mark Ahrens Email: Mark_ahrens@fws.gov Office: (503) 231-6273
Contract Specialist:
TIFFANNIE PANNELL
U.S. Fish & Wildlife Service: Contracting Construction AE Acquisition Operations, APO, Atlanta, GA
JOINT ADMINISTRATIVE OPERATIONS
tiffannie_pannell@fws.gov Office: 404-679-7182
Contracting Officer
JOSHUA MILLER
U.S. Fish & Wildlife Service: Contracting Construction AE Acquisition Operations, APO, Portland, OR
JOINT ADMINISTRATIVE OPERATIONS
joshua_miller@fws.gov Office: (503) 872-2813
Satellite image of hatchery building
View of ridge cap from exterior top
View of ridge cap from exterior side
View of ridge cap access from interior
File details come from the government source that posted it. Updated .