This Statement of Work (SOW) details an underground conduit installation project for the U.S. Fish and Wildlife Service at the Chincoteague Island facility in Virginia. The scope of work includes trenching approximately 310 linear feet, installing conduit, cutting and repairing a 24x24 patch at the fee booth for conduit entry, and saw-cutting and restoring a 16-inch trench in asphalt. The contract period is 14 days, with work to be performed during core hours (8 a.m. to 4 p.m., Monday through Friday), excluding federal holidays.
The project requires a lump sum quote covering materials, equipment, and labor, with the government reserving the right to inspect for compliance with standards. Non-conforming work will not be paid for, and the contractor must remove and replace any substandard products at their own expense. Payment will be processed through electronic funds transfer, and the contractor must register in the required payment systems. The solicitation is identified by number 140FC325Q0014 and is issued by the Department of the Interior's Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03_WD.pdf | ||
| Sol_140FC325Q0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work For Underground Conduit
LOCATION: U.S. Fish and Wildlife Service
Chincoteague Island, VA 23336
1.0 –
The Fish and Wildlife Service (FWS) on of the upgrade of obsolete internet lines for one area of the refuge.
2.0 – Scope
For the as indicated below at FWS, Chincoteague
Work to be performed is as follows:
• Trench approximately 310’ feet.
• Install conduit and re-cover trench.
• Cut 24x24 patch at fee booth for conduit entry (repair and replace cut).
• Saw cut 16” trench of asphalt to install conduit (repair and restore cut).
3.0 – Contract Period
The contract period is 14 days.
4.0 – Current Product Standards
The Contractor must install a single
The Government reserves the right to inspect for compliance of these standards.
5.0 – Pricing
The price for the project should be a lump sum quote to include materials, equipment, labor
6.0 – Work Schedule - Days and Times
Work under this contract will be performed during the facility’s core working hours (8 a.m. and 4:00 p.m. – Monday through Friday) except on Federal Holidays. The facility’s point of contacts
7.0 – Non-conformance
-conforming then, where relevant, the following shall apply:
1. The FWS will not be required to pay for any product found to be non-conforming. If payment has already occurred, then the Contractor shall re-supply an equal amount of cable that does conform.
2. The Contractor shall, at its own cost, remove any non-conforming product supplied by the Contractor from the FWS site.
3. The Contractor non- conforming product.
8.0 – Payments r will need to register in both systems to get paid.
funds transfer to contractor’s bank. No other payment method is available.