A04_SOW.pdf

PDF 193 KB Posted

Attached to
DOCK CLEANING, INSPECTION, REPORT - GLBA Federal contract opportunity
Solicitation number
140P9724Q0018
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This statement of work outlines cleaning, inspection, and reporting requirements for marine facilities at Glacier Bay National Park and Preserve and Indian Point in Alaska. The selected contractor will clean underwater surfaces, perform condition assessments, and produce reports for the dock structures between May 1, 2024 and September 1, 2024. Inspection tasks include level I and II underwater surveys of pilings and floats per NBIS and ASCE standards. The contractor must have experience performing similar marine inspections and assessments. The report is due within 30 days of completing field work. Safety, scheduling, and other requirements are specified.

View the file

Other files for this federal contract opportunity

Other files attached to DOCK CLEANING, INSPECTION, REPORT - GLBA, newest first.
File Type Posted
Sol_140P9724Q0018.pdf PDF
B08_RFQ_Content.pdf PDF
B03_DOL_WD_2015-5685_Rev_21.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NATIONAL PARK SERVICE

GLACIER BAY NATIONAL PARK & PRESERVE

DOCK CLEANING, INSPECTION, REPORTS

GUSTAVUS, ALASKA

November 1, 2023

Introduction: The work under this contract consists of under waterline cleaning, above and below water inspection and condition assessment reports for the National Park Service (NPS) marine facilities located at the Bartlett Cove inner-dock marine facilities adjacent to the headquarters building in Glacier Bay National Park and Preserve, Gustavus, Alaska, and for the Indian Point marine facilities in Juneau located at Indian Point, just north of the Alaska Marine Ferry terminal at 3100 National Park Service Road. The condition assessment and structural evaluation of these marine facilities shall include all appurtenances above and below the waterline. The marine facilities adjacent to the headquarters building at Bartlett Cove were rehabilitated around 1981. The marine facilities at Indian Point were constructed around 1966.

The contractor is required to supply all materials, parts, tools, equipment and labor necessary to complete the stated work. All work will be performed under a single contract.

Description of site The marine facilities under the scope of this project include the following:

Bartlett Cove Inner Lagoon Dock-

1) A treated wood approach pier with an approximate 15’ X 45’ footprint supported by approximately nine (9) treated timber pilings (Three bents with three piles each).

2) A self-supporting gangway ramp with an approximately 6’ X 66’ footprint, consisting of a galvanized steel support structure, grate decking and handrails that connects the approach pier structure to the Lagoon pier float.

3) Lagoon pier float with an approximate 15’ X 145’ footprint. The lagoon pier float is secured with approximately twenty (20) treated timber piles evenly spaced along each side of the lagoon pier float.

4) The lagoon pier float has a total of eight finger floats attached to both sides (Three on the west side and five on the east side). Each finger float has an approximate dimension of 6’ X 24’. There are two (2) treated timber piles at the end of each finger float for a total of sixteen (16) treated timber piles that secure the outboard ends of the finger floats.

5) The end of the lagoon pier float has a lagoon pier head float that has an approximate 15’ X 70’ footprint. The lagoon pier head float is secured with approximately nine (9) treated timber piles.

Approximate quantity summary for Bartlett Cove marine facilities:

Treated timber pile count: 54 Lagoon pier and pier head float length: 214 Lineal Feet Total finger float length: 192 Lineal Feet Gangway length 66 lineal ft

Indian Point Dock-

1) A treated wood approach pier with an approximate 10’ X 310’ footprint supported by approximately sixty-four (64) treated timber pilings.

2) A treated wood pier head with an approximate 10’ X 20’ footprint supported by approximately eleven (11) treated timber pilings. There are approximately three (3) timber fender piles along the southerly face of the pier head. There is one (1) 18-inch diameter concrete-filled steel pile adjacent to the southerly side about mid-point of the pier-head that supports the crane mast.

3) A self-supporting gangway ramp with an approximately 6’-6” X 55’ footprint connects the pier head to the float. The gangway is constructed with treated wood and galvanized metal fasteners and hardware. The gangway ramp is currently disconnected from the pier head and laying on the float dock.

4) Two floats, each with an approximate 14’ X 44’ footprint, are connected together end-to-end and secured by treated timber pilings along each side of the floats.

There are approximately twenty (20) timber piles securing the float dock.

5) Two dolphins: one at the easterly end of float dock containing four (4) timber piles banded together, and a second dolphin located off the southwesterly corner of the pier-head containing three (3) timber piles banded together.

Approximate quantity summary for Indian Point marine facilities:

Treated timber pile count: 105 Steel hoist pile: 1 Pier and pier head length: 330 Lineal Feet Total float length: 88 Lineal Feet Gangway length: 55 Lineal Feet

Objectives

The Contractor shall furnish the necessary personnel, material, equipment, and services (except as otherwise specified), to clean, inspect and provide a condition assessment for two docks as specified in the description of tasks below.

During the performance of the work, the contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness and progress of work.

This Scope of Work includes one site visit for the purpose of cleaning and inspection and a final report as described below. It is the responsibility of the contractor to verify that all the information provided in this solicitation is accurate.

All work is to be completed in accordance with this Scope of Work and other Contract Documents, as well as all applicable Codes and Standards. Contractor shall, without additional expense to the Government, be responsible for obtaining necessary licenses and permits, and for complying with all applicable federal, state, and borough laws, codes, and regulations pertaining to the performance of the service that is to be rendered.

The Contractor shall take proper safety and health precautions to protect workers, the public, and property. The Contractor shall provide the Government all requested reports, and supporting material developed during the performance of the work. The Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness and progress of work. The Contractor shall adhere all applicable regulations and codes.

Description of tasks: The work to be completed under this contract consists of the following:

A) Dock Cleaning: Contractor shall remove all growth over 1 inch thick from under the waterline of each dock float via scraping and/or water pressure methods. Care should be taken to avoid damaging floatation billets. Any further methods must be approved by the Contracting Officer.

B) Dock inspection: The inspection and structural evaluation shall include all portions above and below the waterline of the respective marine facilities as described above.

All dive operations will be in water less than 50 feet deep at high tide. All findings are to be photo and videotape documented.

Assessment and evaluation work above the waterline shall comply with the National Bridge Inspection Standards (NBIS): this is essentially a visual inspection of the structure to include inspection of all pilings, piling caps, decking, support structure, cross-bracing, stringers, fasteners, metal hardware and appurtenances. The assessment and evaluation shall look for splits, checks, rot, and damage. Where warranted based on the results of the visual inspection, the evaluation shall include boring into timber members to identify areas of deterioration. Metal fasteners and hardware shall be evaluated for condition, corrosion, and remaining service life.

Assessment and evaluation work below the waterline shall comply with the National Bridge Inspection Standards (NBIS) and/or the American Society of Civil Engineers (ASCE) “Standard Practice Manual for Underwater Investigations”.

Completion of level I and level II underwater condition assessments, corrosion analysis inspections and videotape documentation of the submerged portions of the above listed facilities is required in accordance with the following criteria: A level I inspection shall be conducted on 100% of the pilings and floats, including fasteners and hardware.

Pilings and floats identified during the Level I inspection as being obviously damaged will receive a level II inspection. Twenty percent (20%) of the total number of pilings are to receive a level II inspection. This would be eleven (11) pilings for the marine facilities at Bartlett Cove; and twenty-one (21) pilings for the marine facilities at Indian Point. . The number of level II inspections of the floats shall be determined as if the floats were divided into 10 foot sections and 20% of the sections were sampled. This would be eight (8) locations each at the marine facilities at Bartlett Cove and Indian Point. The gangway ramps will receive two (2) level II inspections at each location.

After level II inspection of the pilings and floats targeted by the level I inspection, the remainder of the 20% sampling will be done in a random manner, to produce a statistically-representative sampling. If the level I inspection identifies more than 20% of the pilings or floats that require level II inspection, then a contract modification may be issued for additional inspection at the unit price provided in

Prior to conducting the level II assessment over 20% the contractor shall provide a plan to the Contracting Officer for review and approval, identifying which piles or areas of float sections will be assessed.

C) Condition assessment report: The contractor will produce and deliver a facility condition report/corrosion analysis for each location along with related photographic and videotaped underwater inspection findings to the Contracting Officer (CO) within 30 days after the completion of the site work. Photo/video documentation shall be presented digitally. The report shall include an executive summary, general description of the facilities assessed, present a listing of all personnel and their function that were onsite during prosecution of the work, present all findings from the assessment, present any recommendations and/or issues in a prioritized list that should be addressed by the owner, describe any limitations or complications encountered during prosecution of the work and present any other pertinent information that was noted during the condition assessment and structural evaluation of these facilities. The report shall have daily and dive reports appended to the document. Report shall provide repair recommendations that will effectively address these findings including a Class C estimate for all work detailed in report.

General work requirements:

Required Contractor Qualifications: The condition assessment and structural evaluation shall be performed by a licensed professional engineer with specific experience and qualifications to conduct the stated work. The qualifications of the individual should also meet the minimum requirements established by the National Bridge Inspection Standards (NBIS), National Association of Corrosion Engineers (NACE) and/or American Society of Civil Engineers (ASCE) as outlined in the ASCE “Standard Practice Manual for Underwater Investigations”.

A Level I general examination is the most common of underwater inspections, and consists of a swim-by overview. A Level I inspection does not involve the cleaning of any structural elements and can therefore be conducted much more quickly than the other levels of examination. A Level I inspection should confirm as-built structural plans and detect objects of obvious major damage or deterioration due to overstress, ship impact, severe corrosion, or extensive biological growth and attack. The underwater assessor would use a visual and or tactile observation technique to make these Level I condition assessments. Visual documentation, using underwater television or photography, shall be included with the findings, which should provide representative results of the overall facility condition.

A Level II detailed examination emphasizes the detection and identification of damaged and deteriorated areas of marina/waterfront assets that may be hidden by bio-fouling organisms or surface deterioration. The data should be sufficient to permit approximating the relative condition and load-carrying capacity of the structures. Level II will require cleaning the surface of marine growth for a length of two feet around the piling, cross-bracing or structure. At minimum, examinations are to occur at the mud-line and at the mean low water level. When the distance between the low water level and mud-line equals 5 feet or less, examinations only need to be completed at the mud-line from this point on up to the low water level point. Other areas to examine would be those identified as damaged or deteriorated from the level I examination. Because cleaning the structural elements is time consuming, it is generally restricted to areas that are critical or which may be representative of the entire structure itself.

The amount and thoroughness of cleaning to be performed is governed by what is necessary to discern the general condition of the overall facility. Simple instruments such as calipers, measuring scales, ice picks, scrapers and chipping hammers are commonly used to both clean the submerged surfaces and take physical measurements. The examination can include drilling a ¼” to 3/8” hole into pilings or timber members or core drilling to inspect for rot or marine boring organisms, particularly toredo worms. Any holes from drilling or coring will be required to be plugged with either a treated wood dowel or galvanized screw.

Photo Documentation: The contractor will provide photo documentation of all above water level findings and will produce a videotape of the underwater inspection detailing all inspection findings therein. The videotape will include a taped dialog between the diver and the topside personnel describing the location, marine growth and general condition of the structure.

Diving Operations: All diving operations must comply with the Association of Diving Contractors International (ADCI) and Occupational Safety and Health Administration (OSHA) standards. All underwater work and videotape documentation must be performed by personnel with at least three years of documented experience performing similar tasks on docks and floats exposed to a salt water marine environment to NBIS standards. Credentials of personnel that will perform the work must be included with the bid. Two-way communications will be used for recording a dialog between the diver and the topside personnel describing the location and general status of the work. The COR may be present to monitor two-way communication with the underwater inspectors, and will be provided the ability to view the video monitor during all portions of the underwater inspection.

Site Support: The contractor is responsible to provide written notification to the Contracting Officer detailing any site support needs that will be requested from the National Park Service (NPS) in advance of work to allow time for resource coordination. It is the contractor’s responsibility to provide the necessary hardware and equipment to access Government furnished utilities. Public restrooms are available near the Bartlett Cove marine dock facilities and a restroom is available at the Park office (during regular business hours) at the Indian Point facilities.

Site Access: Gustavus is accessible by air or water. The Bartlett Cove inner cove marine facilities are accessible by road from the Gustavus airport and by marine vessel. Vessel access to the inner cove can only occur during high tides. The lagoon entrance goes dry at lower tides.

The contractor will be responsible for obtaining and complying with any permits required from the NPS to enter Glacier Bay with a marine vessel. The Indian Point dock marine facilities are accessible by road out of Juneau or by marine vessel. Park security requires that all work and site visits be prescheduled. A designated Park employee will escort contractors personnel and be onsite for the duration of the work. Park to secure the site daily.

Schedule: Contractor schedule shall be submitted within 10 days of award and approved a minimum 2 weeks in advance of performing the work

Safety: The contractor shall prosecute the work in accordance with OSHA regulations 1910 and 1926 concerning General Construction safe working procedures. Fall protection safety will be in accordance to OSHA regulations found in 1926 subpart M. Contractor to submit a safety plan 2 weeks in advance of the work. All elevated tank work by the contractor will be conducted only after a review and approval by the NPS safety officer.

Staging Area/Worksite Timeframes: Establishment of a construction camp is not permitted.

The contractor is responsible to provide written notification to the Contracting Officer detailing any staging area needs that will be requested from the National Park Service (NPS) in advance of work to allow time for resource coordination. The contractor staging area will be at the parking areas adjacent to the tanks as directed by the NPS. Generally, access to the work sites and assets will be allowed Monday through Friday 07:00 to 17:30. Other times may be allowed with prior written approval from the COR.

Preservation of Natural Features: Confine all operations to work limits of the project, approximate location shown on drawings. Prevent damage to natural surroundings. Do not fasten ropes, cables, or guide wires to existing trees.

Cleanup: The worksite and any onsite staging areas shall be a neat and workmanlike manner;

trash shall be disposed of daily. Once the work under this project is complete the contractor shall perform a final cleanup of all worksite and staging areas. The contractor shall remove and dispose of all damaged and unused material from site.

Government Furnished Items: N/A

Re-performance of Service

When service performed does not conform to contract requirements, or when service was not performed in a specific area, the contractor shall perform or re-perform the service in conformity with contract requirements at no additional cost to the government.

Non-Payment for Additional Work

Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

Quality Assurance

The Government may utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this Scope of Services in an acceptable manner. The use or nonuse of any quality assurance methods by the Government will not constitute a waiver of or excuse from contract requirements. The Government may implement or change quality assurance measures at any time during the term of the contract. Surveillance methods may include 100% inspection, periodic inspection, random sampling, or customer input.

Warranty Period

The Contractor shall warranty all work and materials for 12 months after project closure.

Period of Performance

The anticipated period of performance for the resultant contract is from May 1, 2024- September 1 2024, 2024. All work must be completed, and deliverables received prior to September 1, 2024.

Submittals:

Qualifications letter-due with RFP Schedule-due 10 days after award Work Plan- Must be approved 2 weeks before start of work.

Safety Plan- Must be approved 2 weeks before start of work.

Inspection Report- due within 30 days completion of field work.

Contracting Officer’s Authority:

The Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:

(1) direct or negotiate any changes in the Statement of Work or specifications;

(2) modify or extend the period of performance;

(3) change the delivery schedule; or

(4) otherwise change any terms and conditions of this contract.

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and not withstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

Reference Standards:

NBIS

National Bridge Inspection Standards (Federal highway Administration)

ASCE

American Society of Civil Engineers 1801 Alexander Bell Drive Reston, VA 20191

(800) 548-2723

OSHA

Occupational Safety and Health Administration (U.S. Dept. of Labor) 200 Constitution Avenue, NW Washington, D.C. 20210

(800) 321 6742

NACE

National Association of Corrosion Engineers International P.O. Box 218340 Houston, Texas 77218

(713) 492-0535

ADCI

Association of Diving Contractors Inc.

5206 FM-1960, Houston, TX 77069

(281) 893-8388 https://www.bing.com/ck/a?!&&p=037950d2684c3ae1JmltdHM9MTcwNjc0NTYwMCZpZ3VpZD0wNjUxY2Y2NC00MTg3LTZkZGYtMjM4YS1kZjE4NDA1YjZjZDcmaW5zaWQ9NTUwMA&ptn=3&ver=2&hsh=3&fclid=0651cf64-4187-6ddf-238a-df18405b6cd7&u=a1L21hcHM_Jm1lcGk9MTA5fn5Ub3BPZlBhZ2V-QWRkcmVzc19MaW5rJnR5PTE4JnE9QXNzb2NpYXRpb24lMjBvZiUyMERpdmluZyUyMENvbnRyYWN0b3JzJTIwSW5jJnNzPXlwaWQuWU44NzN4MTQ0MTQ5NjcwODA4NDk0OTE1MjkmcHBvaXM9MjkuOTgyNTA3NzA1Njg4NDc3Xy05NS41MDkyNzczNDM3NV9Bc3NvY2lhdGlvbiUyMG9mJTIwRGl2aW5nJTIwQ29udHJhY3RvcnMlMjBJbmNfWU44NzN4MTQ0MTQ5NjcwODA4NDk0OTE1Mjl-JmNwPTI5Ljk4MjUwOH4tOTUuNTA5Mjc3JnY9MiZzVj0xJkZPUk09TVBTUlBM&ntb=1 tel:2818938388

File details come from the government source that posted it. Updated .