A04 SOW.docx
DOCX document 16 KB Posted
- Attached to
- PERL SOLID/GREEN WASTE DISPOSAL Federal contract opportunity
- Solicitation number
- 140P8221Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionaire_0001.doc | DOC document | |
| Sol_140P8221Q0012_Amd_0001.pdf | ||
| Sol_140P8221Q0012.pdf | ||
| SCA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solid/Green Waste Removal, Pearl Harbor National Memorial Scope of Services
1. General The contactor shall provide the necessary personnel, facilities, services, materials, and equipment, including container, and transportation to furnish commercial type garbage, debris collection, and green waste disposal at Pearl Harbor National Memorial, Pearl Harbor, Hawaii. This requirement of solid waste collection and disposal service covers the period of one base year and four Option Years for a total of five years.
2. Scope of Work
· Garbage Collection shall consist of emptying and disposing of the contractor provided garbage and green waste containers at the Pearl Harbor National Memorial. Contractor shall provide the following containers:
1. One (1) six (6) cubic yard container for commercial type garbage and debris collection. The normal collection schedule shall be daily, Monday through Saturday. Thanksgiving, Christmas, and New Year’s excluded. Pick up shall be between the hours of 5:30 AM and 8:00 AM. Location of the containers shall be designated by the Contracting Officers Representative (COR).
2. One (1) ten (10) cubic yard container for green waste collection. The normal collection schedule shall be once a week, on Tuesday, as defined by the COR, between 5:30 AM and 3:00 PM. Location of the container shall be in the Maintenance Shop yard.
· Maintenance of Garbage Containers
1. The contractor shall maintain the containers in a manner that will reflect credit upon the National Park Service (NPS) and upon the contractor. All holes or other defacements will be repaired in compliance with all applicable sanitation codes immediately and repainted, if needed, to prevent further damage. Covers, lids, handles and hinges shall be repaired promptly as needed.
· Selection of Dump
1. The selection of the dump is the responsibility of the contractor. Garbage shall be disposed of outside the park in conformance with applicable Federal, State and Local requirements.
· Dumping Fees
1. All dumping fees are to be paid by the contractor and are not reimbursable for the duration of this contract period, on a year to year basis.
3. Personnel Qualifications
· The contractor’s personnel who will perform these serviced shall have the following minimum qualifications:
1. Qualified and licensed to operate the contractor’s equipment.
2. Neat in appearance and orderly in manner.
4. Equipment Requirement
· Contractor’s vehicles shall be equipped to prevent leakage of liquids or other waste materials while collecting and transporting garbage and green waste. Contractor shall be responsible for collecting any materials and trash spilled from the vehicle or at collection sites when spillage occurs as a result of the contractor’s negligent act, fault or omission.
· All contractor equipment shall be clearly identifiable as belonging to the company.
File details come from the government source that posted it. Updated .