A04_SOW.docx
DOCX document 460 KB Posted
- Attached to
- RED ROCK NCA POTABLE WATER DELIVERY Federal contract opportunity
- Solicitation number
- 140L3921Q0016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3921Q0016_Amd_0003.pdf | ||
| Sol_140L3921Q0016_Amd_0002.pdf | ||
| Sol_140L3921Q0016_Amd_0001.pdf | ||
| B09_Questions and Answers_0001.docx | DOCX document | |
| B03_Wage Determination.pdf | ||
| Sol_140L3921Q0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Service
FINAL
Southern Nevada District Office Las Vegas, NV
Red Rock, NCA Potable Water Delivery
Bureau of Land Management Nevada
1.0 Project Introduction
Project Name: Red Rock, NCA Potable Water Delivery Address:
BLM-SNDO
4701 North Torrey Pines Drive Las Vegas NV 89130
1.1 Location and Facilities
There two (2) primary locations and one (1) secondary location for delivery within the Red Rock, NCA.
-Primary
a. The delivery location is located at Red Rock NCA on West Charleston Boulevard (Nevada State Road 159), the park is located 3.75 miles past Clark County 215 (Bruce Woodbury Beltway) going west.
The park entrance GPS location is: Lat 36.131652° Long -115.421428° The Administration Building water storage tank is located further down the road in the same vicinity as the Visitor Center. The GPS location is: Lat 36.135558° Long -115.427211°
b. The delivery location is located at Red Rock NCA Campground on Moenkopi Rd just off (Nevada State Road 159), the park is located 3 miles past Clark County 215 (Bruce Woodbury Beltway) going west. The physical address is 3293 Moenkopi Road Las Vegas NV 89161 The campground water tank is located on the Eastside of the road.
The GPS location is: Lat 36.133970° Long -115.386430°
-Secondary
c. The delivery location is located at Red Rock NCA on West Charleston Boulevard (Nevada State Road 159), the park is located 3.75 miles past Clark County 215 (Bruce Woodbury Beltway) going west. The gate on SR-159 GPS location is: Lat 36.13012° Long -115.42532° The Well head water storage tank is located west of the Visitor Center exit road on SR-159. The GPS location is: Lat 36.13046° Long -115.42779°
1.2 Short Project Description
The project consists of delivery potable water to the areas within Southern Nevada District.
See: Detailed Project Description 4.3
2.0 PROJECT Requirements
2.1 Scope of Work and Project Summary/Requirements
The water delivery will be delivered in a certified water potable tank/s that have been tested and have current Nevada Department of Environmental Protection for potable use and follow all state and local regulations.
2.2 Free or Total Chlorine
A residual concentration of free chlorine of greater than or equal to 0.5 mg/L (0.5 ppm or parts per million) after at least 30 minutes contact time at pH less than 8.0 will be required and spot testing may be performed by BLM staff to verify requirement. Any water delivery not meeting this requirement will not be allowed to off-load until chlorine has been added and minimum agitation of at least 30 minutes have been completed and will be retested to meet requirement.
2.3 Staging Area for Offloading
Staging is may be limited to in or near the delivery locations, and the driver will need to watch traffic and arrive and depart slowing to avoid visitors accessing the Visitor Center next door.
2.4 Delivery Coordination
The Contracting Officer (CO) will provide all necessary written notification and/or direction to the contractor unless the CO designates it to the Contracting Officer Representative (COR) to request deliveries.
2.5 Working Hour Restrictions
All deliveries shall be limited to the weekday hours of 6:00 am to 4:00 pm unless otherwise approved by the Contracting Officer. No delivery shall occur on federal holidays or weekends without prior approval.
2.6 Smoking
Smoking within buildings or temporary storage sheds is prohibited and smoking areas are in open areas and will be away from entrances at least fifty feet away.
| 3.0 | PERFORMANCE REQUIREMENTS |
| 3.1 | Protection |
Protect any areas adjacent to the project site from any debris. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect personnel and general public from injury due to water delivery.
4.0 PROJECT DESCRIPTION
4.1 Existing Building and Site Description
Administration- Staff and visitors to provide the best visitor experience use the existing buildings, NCA staff and partner groups primarily use the administration building as a typical office. The Visitor Center is open to the public and NCA staff on a daily basis, seven days a week, 365 days of year.
Campground - The site is located on the east side of Moenkopi Road, on a hilltop that overlooks the campground. Moenkopi Road is the only public access road into the campground site. The Campground is open seasonally to the public from Labor Day to Memorial Day, on a daily basis, seven days a week. The campground is closed for the summer from Memorial Day to Labor Day.
4.2 Existing Project Condition
The existing water tank is located in areas that is not used by the public and may have high temperature and noise.
4.3 Detailed Project Description
Vendor will deliver potable water as request either by the CO or if delegated to COR. All water deliveries may be tested at random and will require the driver to stay with the vehicle at all times during offloading of water. Driver will make sure all connections to transfer water all certified for potable water use. Some water deliveries may be request for the storage tank at the well head near Highway 159 prior to entering the park, on as needed basis. Vendor will verify routes and advise BLM if any of the routes pose a hazard to vehicle hauling water to avoid breakdowns.
image1.jpeg image2.png
File details come from the government source that posted it. Updated .