A04_RFPTextileSurvey24.pdf
PDF 1 MB Posted
- Attached to
- EDIS CONDUCT TEXTILE COLLECTION SURVEY Federal contract opportunity
- Solicitation number
- 140P4524Q0036
About this file
This document is a Request for Proposal (RFP) for a federal contract opportunity to conduct a condition survey of 350 historic textiles located in the museum collection storage at Thomas Edison's Victorian home, Glenmont.
The key details are:
- The National Park Service is seeking a qualified conservator to produce a detailed condition survey report on 350 historic textiles, including identifying the condition, materials, previous repairs, conservation needs, and provenance of each item. The survey will inform upcoming conservation treatments and exhibitions.
- The work includes on-site examination, photography, and "padding out" of the textiles as needed, as well as off-site research and report writing. The conservator must have a minimum of 3 years of textile conservation experience and expertise in working on historic properties.
- Proposals must demonstrate relevant past experience, including conserving/surveying historic costume and interior textiles, conducting textile collection surveys, and working on projects at National Register historic sites.
- The contract is anticipated to be a firm-fixed price award. The period of performance is 10 months from the date of award. Specific proposal submission requirements and evaluation criteria are detailed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4524Q0036_Amd_0001.pdf | ||
| B03_WD_2015-4211_ESSEX__MORRIS_CTY.pdf | ||
| Technical_Questionnaire.pdf | ||
| Sol_140P4524Q0036.pdf | ||
| Price_schedule_Textile_Survey_24.xls | XLS spreadsheet | |
| Contractor_Monitoring_SOP_2022_(1).pdf | ||
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Survey 350 Textiles in the Museum Collection at
Edison’s Home, Glenmont
PMIS PROJECT 143839
Request for Proposal
May 14, 2024
1.0 BACKGROUND
2.0 SCOPE/RFP REQUIREMENTS AND EVALUATION CRITERIA
3.0 OBJECTIVES
4.0 TASKS
5.0 DELIVERY
6.0 GOVERNMENT-FURNISHED PROPERTY
7.0 SECURITY
8.0 PLACE OF PERFORMANCE
9.0 DELIVERY/PERIOD OF PERFORMANCE
10.0 PAYMENT SCHEDULE
1.0 BACKGROUND
The purpose of the contract is to produce a collection condition survey of 350 historic textiles located in museum collection’s storage at Thomas Edison’s Victorian home, Glenmont. Conservator will create a detailed object survey narrative that identifies the condition of each textile, the material of each textile, previous repairs for each textile, suggested treatment for each textile, number of conservation hours needed for each textile, the provenance of each textile, each textile’s location and catalog number, a brief description of each textile with corresponding photographs, and identify priorities for treatment of these objects. The completed survey will inform upcoming conservation treatments for these historic objects. The survey will support the park’s goal of returning more period rooms within this nationally significant mansion to their historic appearance as well as improving the documentation and preservation of this significant museum collection.
The historic textiles included in this project likely range in age from 1880 to circa 1947.
Objects include various types of decorative and utilitarian textile objects such as historic costumes, draperies, bed linens, towels, napkins, slipcovers, shoes, and hats. The textile objects are functional objects and were used regularly during the historic period by the
Edison family. Due to these artifacts’ direct association with the Edison family and their daily lives at Glenmont, as well as their association with the overall interior decorating scheme for the Edison home, these textiles play a key role in both the interpretation and the academic study of Glenmont. Textiles from this collection are regularly exhibited to the public and are also available for examination by researchers who study the history of interior decoration as well as the history of fashion and apparel.
Thomas Edison National Historical Park is a National Park Service site located in West
Orange, New Jersey. The park consists of two separate sites, approximately one mile apart. Thomas Edison’s home, Glenmont, is located in a private residential community known as Llewellyn Park. Built in 1880, Glenmont is a 29 room Queen-Anne style mansion which remains intact, complete with interior furnishings and finishes that reflect the rich historic decorative period during the years when Thomas Edison and his family resided in the home.
The majority of the work will be performed off-site, in the conservator’s studio. This includes producing a condition survey of these objects in narrative form, as well as the conducting the corresponding research. Details related to the survey are provided in section 4.0 of this document.
On-site work for the project will include: examination of the 350 textiles associated with this project, photographing the objects, as well as “padding out” any textiles items stored in boxes that require additional padding. In limited cases, some oversized textiles may be transferred into new archival boxes to accommodate their length (maximum of 20 transfers into new storage boxes for this rehousing aspect). The textiles associated with this project are located in storage on the third and first floor of Glenmont. In some cases, the textiles are stored in archival boxes, which must be removed by the vendor for examination of the object. In other cases, the textiles are stored hanging in museum textile cabinets and must be removed from the cabinets in order to perform project work.
In all cases, the vendor will then be required to return the objects to storage, after their examination is complete, in their original storage locations and configurations. This includes rehanging objects on hangers in cabinets and reboxing the objects stored in boxes, as well as returning the objects to their original shelving and cabinet locations.
These additional tasks should be considered when the vendor is formulating their bid, their bidding proposal, and their approach to the project.
In all instances, the selected contractor will be responsible for protecting-in-place adjacent artifacts, historic finishes and surfaces in the Glenmont work areas associated with this project, as required, if deemed necessary to prevent damage to any aspect of the historic interior of Glenmont, including its artifacts and its modern carpet runners, during the course of the project. It is important to note that the mansion includes original historic architectural features, surface finishes, fully furnished period rooms, historic staircases, etc. with narrow spaces commonly found in Victorian homes. The selected vendor will also be required to adhere to park safety and security policies which will be further detailed in this document.
1.1 HISTORIC BACKGROUND
Mina Edison, Thomas Edison’s second wife, resided at the Glenmont mansion from 1886 until her death in 1947. She spent over five decades at Glenmont with Thomas Edison, raising their three children in this location. Over the years, Mina Edison undertook several major decorating campaigns in order to remain current with her decorative motifs inside this fashionably decorated residence. This resulted in updating curtains, slipcovers, etc. in the various rooms at Glenmont. In many cases, Mina Edison retained the previously used decorative textile objects, after new interior decoration updates had been completed. Additionally, Mina Edison saved various personal items that were worn and used by the Edison family during the time that they resided at Glenmont. Many of these costume objects are included as part of this survey.
A varied collection of textiles ranging from draperies to blankets to slipcovers, acquired and used by the Edison family at Glenmont during the historic period, are included in this project. Personal Edison family items such as costumes and associated shoes, hats, and purses are also included in this project. Specific examples of these types of items include cocktail gowns, a riding outfit, and three piece linen suits that were worn by Thomas
Edison. This collection also contains items such as baby clothes, undergarments, and
Mina Edison’s wedding dress.
Existing Conditions:
These 350 textile collection items are stored in museum storage in two separate locations inside of the Edisons’ 1880 mansion, Glenmont. The textile objects on the third floor are located in the third floor Textile Room, housed in archival grade textiles boxes on museum grade shelving. The equipment and boxes meet current museum storage standards for textiles. However, some minor adjustments need to be made in order to further improve the storage of these objects. In this case, the selected vendor will be tasked with using their technical expertise to “pad out” any additional textile items that require additional acid free tissue paper support in their current archival boxes.
Additionally, the site recognizes that a select number of objects that are oversized in length could benefit from being transferred into larger or separate acid free boxes (a maximum of 20 objects). These adjustments will be made by the selected vendor as part of the project tasks associated with the third floor Textile Room.
The project will also include the survey of textile items located in two museum textile cabinets on the first floor of Glenmont. These objects are stored using museum-grade materials. Some of the objects are stored on museum-grade hangers in hanging storage inside of the cabinets.
A five feet long table area will be provided in the first floor Preserving Room storage area for examination of the textiles located in the associated cabinets in this room. A six foot long table will be provided for examination of the objects in the third floor Textile
Room. This table is located inside of the third floor textile storage area. As a note, many of the boxes are five feet in length or larger, which can provide challenges when moving them on and off of shelving units. This task may require more than one person to perform this work.
To date, no comprehensive condition survey has been executed for this collection at
Glenmont. This project will provide baseline documentation and baseline research for the collection’s condition. The survey will inform future management decisions in regards to the care and exhibit of this historic collection.
Also, outdated catalog records provide few details of maker or provenance. Filling in the gaps for documentation of these objects, namely their provenance, will also improve their interpretation, transferring the knowledge gained to the public through exhibit and programming related to this collection.
1.2 SOLICITATION PROPOSAL REQUIREMENTS AND EVALUATION
FACTORS:
A. To facilitate consistent review and comparison of responses, proposal submissions must correspond in format to the heading sequence, and content of the following outline.
Respondents to the Request for Proposals (RFP) must include, at a minimum, the following:
Relevant Past Performance (Required):
Submit evidence of comparable past work including a minimum of five years of experience conserving and/or surveying historic textiles from the historic period (circa
1880-1947) with at least two examples of costume objects worn by a person during the historic period (i.e. a dress, robe, overcoat, trousers, etc.) that were either surveyed or conserved by the proposed vendor. One of these items must be made of silk or satin.
Please note that shoes, belts, socks, purses, or hats do not meet this requirement. Past performance must also include two examples of the conservation of a historic decorative object used for interior decorating during the historic period (circa 1880-1947), for example a curtain, quilt, or pillow cover. One of these objects must be made of silk or satin.
Comparable past work must also include a conservation survey of a textile collection
(eight objects or more), which includes identification (provenance research) of and conservation recommendations for textile objects from the historic period, circa 1880-
1947. Comparable past work must also provide evidence of a minimum of two examples of executing historic textile related conservation projects within public properties listed on the National Register of Historic Places, which are projects of similar scope, complexity, age, and historic resource value to that required by this solicitation.
Please note that this criteria cannot be met by using a contemporary textile or a reproduction of a historic textile as any of your examples or by citing a textile project that is not related to an AAM accredited museum or one that is part of the collection of a museum property listed on the National Register of Historic Places. Textile projects associated with interior decorating projects, antique centers or auction houses, craft guilds, houses of worship, private residences, or local historical societies do not meet this criteria. Bidding proposals that do not meet the identified criteria will not be considered.
The lead conservator overseeing this project must have a minimum of three years of textile conservation training obtained through a degree program or a comparable period of apprenticeship with a reputable conservation services provider. This lead conservator shall be considered the key personnel for this contract and is responsible for performing the associated conservation work. This qualified conservator shall have conservation experience in conformance with the American Institute for Conservation (AIC) Code of
Ethics and Guidelines for Practice (website address - http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf). Applicant must also demonstrate familiarity with the NPS conservation and preservation standards and the Secretary of the Interior Standards for the Treatment of Historic Properties (See NPS Museum Handbook at https://www.doi.gov/museum/npshandbooks and https://www.nps.gov/tps/standards.htm for more information).
Please include:
*Point of Contact (with verifiable telephone number and email address)
*Company Name and Address
*Company Telephone Number and Email Address (verifiable)
*Identification of Historic Resource Treated
*Brief Description of the Project with Illustrations which demonstrates similarity in scope and complexity to this project
*Dates Work Was Performed
Cost proposal:
Contract Type
The government anticipates awarding a firm-fixed price contract.
SAM Registration
Contractor shall be registered in SAM.gov prior to contract award.
B. Pre-Proposal meeting:
All Proposers are strongly encouraged to visit the site in preparation for submitting a proposal to view the on-site textile storage and to assess the spacial constraints that must be safely navigated in order to examine, photograph, “pad out”, rehouse, and photograph http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf https://www.nps.gov/tps/standards.htm these historic textiles. Failure to do so shall not relieve the Contractor from responsibility for having estimated properly the difficulty or cost of successfully performing the work.
The Contractor must arrange a site visit at a date and time to be determined. Please contact Beth Miller should you plan to attend a site visit. Any questions that a Proposer has regarding the project must be submitted in writing to the Contracting Officer assigned to this project no later than five days prior to the closing date for this solicitation.
Beth Miller
Curator of Thomas Edison’s Home, Glenmont
973-809-4360 beth_miller@nps.gov
C. Limitations of Liability:
The Government assumes no responsibility and no liability for costs incurred by
Proposers in responding to this RFP.
D. Evaluation of Solicitation Proposals (Selection criteria):
Award of the contract to complete this project will be made on the basis of technical qualifications of the Proposer and on the basis of the Proposal offering the best value to the government with technical and price factor being approximately equal.
Proposals will be evaluated based on the following Factors and Sub-factors:
Factor 1: Experience
Contractor must possess a minimum of three years of textile conservation training obtained through a degree program or a comparable period of apprenticeship with a reputable conservation service, demonstrating textile object conservation/survey experience in conformance with the American Institute for Conservation (AIC) Code of
Ethics and Guidelines for Practice (website address - http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf). Applicant must also demonstrate familiarity with the NPS conservation and preservation standards and the Secretary of the Interior Standards for the Treatment of Historic Properties (See NPS Museum Handbook at https://www.doi.gov/museum/nps-handbooks and https://www.nps.gov/tps/standards.htm for more information).
Factor 2: Relevant Past Performance
Submit evidence of comparable past work including a minimum of five years of experience conserving and/or surveying historic textiles from the historic period (circa
1880-1947) with at least two examples of costume objects worn by a person during the historic period (i.e. a dress, robe, overcoat, trousers, etc.) that were either surveyed or http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf https://www.doi.gov/museum/nps-handbooks https://www.doi.gov/museum/nps-handbooks conserved by the proposed vendor. One of these items must be made of silk or satin.
Please note that shoes, belts, socks, purses, or hats do not meet this requirement. Past performance must also include two examples of the conservation of a historic decorative object used for interior decorating during the historic period (circa 1880-1947), for example a curtain, quilt, or pillow cover. One of these objects must be made of silk or satin.
Comparable past work must also include a conservation survey of a textile collection
(eight objects or more), which includes identification (provenance research) of and conservation recommendations for textile objects from the historic period, circa 1880-
1947. Comparable past work must also provide evidence of a minimum of two examples of executing historic textile related conservation projects within public properties listed on the National Register of Historic Places, which are projects of similar scope, complexity, age, and historic resource value to that required by this solicitation.
Please note that this criteria cannot be met by using a contemporary textile or a reproduction of a historic textile as any of your examples or by citing a textile project that is not related to an AAM accredited museum or one that is part of the collection of a museum property listed on the National Register of Historic Places. Textile projects associated with interior decorating projects, antique centers or auction houses, craft guilds, houses of worship, private residences, or local historical societies do not meet this criteria. Bidding proposals that do not meet the identified criteria will not be considered.
The lead conservator overseeing this project must have a minimum of three years of textile conservation training obtained through a degree program or a comparable period of apprenticeship with a reputable conservation services provider. This lead conservator shall be considered the key personnel for this contract and is responsible for performing the associated conservation work. This qualified conservator shall have conservation experience in conformance with the American Institute for Conservation (AIC) Code of
Ethics and Guidelines for Practice (website address - http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf). Applicant must also demonstrate familiarity with the NPS conservation and preservation standards and the Secretary of the Interior Standards for the Treatment of Historic Properties (See NPS Museum Handbook at https://www.doi.gov/museum/npshandbooks and https://www.nps.gov/tps/standards.htm for more information).
Factor 3: Price
A price evaluation will be performed to determine the reasonableness of the proposed price. Reasonableness will be determined considering other competitive prices received and comparison to the Independent Government Estimate.
http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf http://www.conservation-us.org/docs/default-source/governance/code-of-ethics-and-guidelines-for-practice.pdf
Any proposal containing suggestions, approaches, options, or ideas that do not conform with National Park Service, the Secretary of the Interior, and AIC conservation and preservation standards will not be considered.
Background materials attached to the scope of work include a copy of Rules for
Contractors in Historic Buildings (Attachment B) which identifies specific guidelines that must be followed by Contractors when they work on-site. In general, no food, drink, or smoking is permitted within site work areas. Contractor must protect-in-place adjacent artifacts in immediate work areas and areas required along the path of travel, as needed to prevent damage to the resource and its artifacts (such as historic floors, plaster walls and ceilings, historic light fixtures, historic staircases, historic furniture, etc.), and refrain from storing project equipment on-site during the course of the project. The Contractor is responsible for the cost of all supplies related to the project.
When working on-site, Contractor shall be responsible for removal of all trash debris on a daily basis. Please note that on-site hot work, including use of heat guns, tack irons, or other heat generating equipment or welding, is prohibited for this project. Any bidding proposals that include on-site hot work shall not be considered.
2.0 SCOPE
On-site work for the project, will take place inside of Glenmont, in the museum collection’s storage areas identified for this project, located on the first and third floor of the Edison home. Contractor is responsible for safely navigating through historic spaces in order to complete tasks associated with this project (including examining the historic textiles, “padding out” the textiles as required, transferring the select number of oversized items to larger textiles boxes, and photographing the textiles associated with this project).
Contractor must protect in place the architectural features, historic finishes, adjacent artifacts, surfaces, floor coverings, etc. when completing this work in the Glenmont interior, to the extent required to prevent damage to any of these components during the course of the project. All stated in the statement above is the responsibility of the
Contractor. Contractor is responsible for any damage that occurs to these historic areas, buildings, artifacts, and features during the course of their work.
Off-site work for this project includes completion of the associated textile condition survey in the format described in other sections of this document and any related research.
Selected vendor must comply with National Park Service standards, the Secretary of the
Interior standards, and AIC standards for preservation and conservation which govern this project. Any proposal containing suggestions, approaches, options, or ideas that do not conform with National Park Service, the Secretary of the Interior, and AIC conservation and preservation standards will not be considered.
3.0 OBJECTIVES
The goal is to produce a survey of 350 historic textiles from the museum collection which will inform the upcoming conservation and exhibition of these objects from the Glenmont museum collection.
This project enables the park to continue the work of actively preserving, documenting, and maintaining the park’s museum collections while maintaining and improving exhibit areas. The end product, namely the object survey, will improve the documentation for this collection and assist in the development of conservation projects for similar collections.
4.0 TASKS
4.1 A qualified conservator will produce the object condition survey of 350 historic textiles in Thomas Edison’s Victorian home, Glenmont. The survey condition report will be produced, as per the specifications identified in this document. Conservator will use industry standard museum techniques and NPS approved materials, adhering to appropriate safety, preservation, artifact handling, museum packing, and park security guidelines, in order to perform this work. On-site work will include the survey, photographing, “padding out”, and inspection of 350 historic textiles on the first and third floor of Glenmont. On-site work will also include transferring a select number of textile to larger boxes. Documentation work, such as generating the survey report, and related research, may take place off-site in the conservator’s studio.
On-site work will consist of in-person analysis of the textiles to determine the condition of each textile, the material of each textile, previous repairs for each textile, suggested treatment for each textile, approximate number of hours required to conserve each textile, photographing each textile, and establishing priorities for treatment for this collection.
Please note that for this project, establishing priorities for treatment of these objects will include giving each object a priority rating of number one through number four - with one being the highest priority and four being the lowest priority. On-site work will also include recording the general description, location, and catalog number for each textile.
On-site work will also include “padding out” boxed textiles with the appropriate type of acid free tissue paper, as required, and rehousing a select number of oversized textiles
(maximum of twenty) into larger boxes. Please note that this includes, as the contractor’s responsibility, transferring the objects, including boxed objects to an examination table in order to inspect them and returning the textiles to their original locations in the original configurations (for example: in an acid free box on a specific shelf on a museum shelving unit or hanging on a museum grade clothing hanger inside of a modern textile cabinet). It is also expected that the contractor shall return each stored object to its original location directly after its on-site examination.
The survey narrative (completed object condition survey) will identify each historic textile by its catalog number, location, and a general description. The survey narrative will also identify the condition of each textile, the material of each textile, previous repairs for each textile, suggested treatment for each textile, approximate number of hours required to conserve each textile, each textile’s provenance (with circa date range), and establish priorities for treatment for this collection. Selected vendor will also take photos of each object, identifying condition issues, which will be included in the final survey.
Off-site work will include research. Selected vendor will conduct research to determine the maker, provenance, and circa date for each historic textile which will also be included in the final survey report for this project. Off-site work will also include producing the completed condition survey, with photo documentation for each textile, which includes the specific information identified in this section. Please note that the survey document must contain an individual survey report for each object in narrative form. The format of this survey must be in a WORD document which is compatible with a standard PC computer (no MAC programs or applications).
Please note that the historic textiles shall not be removed from Glenmont for analysis, inspection, testing, photography or any other task that may be associated with this project. Bids that include and/or identify any of the historic textiles to be surveyed, either being transported off-site or relocated within the mansion for further analysis, shall not be considered.
The 350 historic textiles for survey are located in two distinct storage areas on the first and third floor of Glenmont. The contractor is strongly encouraged to make an appointment for an on-site viewing of the property and to see the textile storage areas and their associated conditions prior to bidding.
4.2 350 historic textiles of various types and sizes, all likely original to Thomas Edison’s
1880 mansion, Glenmont, will be surveyed with a corresponding report produced (as per specifications outlined in this document). On-site survey work will take place inside of collection’s storage areas within the Glenmont mansion. Thomas Edison’s 1880 home, Glenmont, in West Orange, New Jersey is historic in nature and contains fully furnished period rooms and original architectural and interior features. Contractor must protect-in-place adjacent artifacts in immediate work areas and refrain from storing project equipment on-site during the course of the project.
The contractor is responsible for the cost of purchasing all supplies related to the project as well as their delivery to Glenmont. This includes the purchasing and funding of the acid free tissue paper which will be used for additional “padding out” of the historic textiles located in textile boxes in the museum collection. This also includes the purchase and funding of 20 additional 60 inch museum grade, acid free textile boxes which will be used to rehouse 20 oversized textile objects. The cost of the supplies, including delivery, must be included in the bidder’s fixed cost estimate.
Contractor is responsible for any damage that occurs during the course of their work while working on site, including but not limited to, architectural elements such as stairwells and wall treatments, historic light fixtures, decorative finishes, floors, doors, artifacts, windows, historic steps, modern carpeting, etc. This includes during the time of any on-site work, including the installation, and de-installation of any project equipment.
Selected vendor will be responsible for using safe artifact and museum handling techniques, specifically those for historic textiles, during the project’s examination and analysis phase. Vendor must familiarize themselves with NPS artifact handling guidelines in order to ensure compliance to these guidelines. Please note, as part of these guidelines, the use of ball point pens or markers is prohibited in areas with historic rugs or textiles. During any on-site work or pre-bid meeting the vendor is expected to use pencil to take notes when working in these historic areas. Additionally, no food, drink, or smoking is permitted inside of the mansion.
4.3 Selected vendor must ensure that they provide sufficient labor (ie number of individuals required) to safely complete all aspects of this work.
4.4 Selected vendor must comply with National Park Service standards, the Secretary of the Interior standards, and AIC standards for preservation and conservation which govern this project. Any proposal containing suggestions, approaches, options, or ideas that do not conform to National Park Service, the Secretary of the Interior, and AIC conservation and preservation standards will not be considered. Conservator will use appropriate museum techniques and approved materials, adhering to appropriate safety, preservation, and security guidelines, as identified in this document, in order to perform this work.
4.5 The selected vendor is required to present a certificate of insurance in the coverage amount of $500,000 dollars including coverage for when the contractor is completing installation and de-installation of equipment and supplies on-site and while performing on-site work for this project. Coverage must cover damages accrued during the course of the project either to the 350 historic textiles or any other historic or non-historic features of Glenmont. The selected vendor shall present a certificate of insurance in the coverage amount of $500,000 dollars for work performed during on-site tasks which include, but are not limited to, coverage for when the contractor is completing the de-installation/re-installation of the textiles from storage for on-site examination, the installation and de-installation of project equipment and supplies, and to cover any damages accrued to the historic textiles or to any other historic or non-historic elements of Glenmont or the
Glenmont museum collection that occurred during the course of the project work.
Contractor must provide proof of liability insurance in the amount of $500,000 dollars as well as standard insurance and bonding which covers the company and its employees against neglect, accident, theft and damage. This shall be provided to the CO. Contractor will also carry insurance to cover injuries to his workmen and damage caused by the workmen. The Vendor must provide a certificate of insurance within ten days of the contract award for the full amount of insurance requested. Contractor shall be responsible for all damages to persons or property that occurs as a result of Contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect work, workers, the public, and property of others. Selected contractor must be present on-site for these activities as well as for all on-site deliveries.
4.6 Selected vendor is responsible for any damage that occurs during the course of their work while working on site. This includes, but is not limited to, damage to historic finishes and features, damage to historic staircases and steps, damage to historic walls and ceilings, damage to historic floors and historic light fixtures, damage to any historic artifacts, or to any building systems or estate areas, such as the landscaped grounds. This includes, but is not limited to, during the time of transport of supplies/equipment, and during any other aspect of on-site work.
Contractor is strongly encouraged to make an appointment for an on-site viewing of the interior of Glenmont and the artifacts associated with this project that are located throughout the mansion.
4.7 Hot work is defined as the use of any heat generating equipment such as a heat gun, blow dryer, or a tack iron to complete the project tasks. This includes welding. No on-site hot work is permitted for this project. If any proposed on-site hot work is included in the bidder’s proposal, the proposal will not be considered.
4.8 Contractor must refrain from storing project equipment on-site during the course of the project. Contractor must be present for any associated project deliveries which will be arranged by advanced appointment only.
4.9 Background materials attached to the scope of work include a copy of Rules for
Contractors in Historic Buildings (Attachment B) which identifies specific guidelines that must be followed by Contractors when they work on-site. In general, no food, drink, or smoking is permitted within site work areas. Contractor shall be responsible for removal of all trash debris on a daily basis when working on-site.
Please note that, on some days, the grounds of Glenmont and the interior of the home may be open to the public. On the days that the grounds are open to the public, the
Contractor must take appropriate safety measures to ensure the safety of the visitors. This includes not blocking the main paths of travel or foot traffic areas, using barriers to delineate work areas so the public cannot access them, and refraining from driving vehicles on the grounds when they are open to visitors and volunteers.
5.0 DELIVERY
5.1 The work of this section consists of submittal requirements before start of work.
A. Within ten days of the award and prior to the commencement of on-site work, a
Certificate of Insurance must be provided to the NPS.
• Pre-start meeting – Within 30 days of award, selected vendor will contact COR to discuss project and work schedule.
• Vendor will be required to submit an NPS approved health and safety work plan within 30 days after the award. In this plan the Contractor must address how they will adhere to relevant and current CDC guidance related to COVID-19 in the work place while working on-site at the Glenmont estate. The manual “Guidance on Preparing Work Places for COVID-19” (OSHA 3990-03 2020) is attached to this solicitation for the bidder’s reference. The goal of the health and safety work plan is to ensure work is being performed safely, both for the resource and the personnel involved in the project. The health and safety work plan must be NPS reviewed and approved, to ensure its methods and materials are in accordance with the NPS and the Secretary of Interior for conservation, preservation, and safety.
On-site work shall not commence until the approved plan is executed. This includes on-site meetings to discuss the project, to examine the resource, or to conduct any project related testing or photography.
• Within 30 days after the award, Vendor will also be required to submit an NPS approved Protect-In-Place plan detailing how walkways, carpeting, built-in features such as steps, floors, adjacent furniture and light fixtures, historic staircases and stained glass windows, as well as adjacent plaster walls and ceilings, architectural features, adjacent artifacts, etc. will be protected in place by the
Contractor, identifying specific techniques and materials to be used to avoid damage to these elements during their on-site work. The protect-in-place plan must be NPS reviewed and approved, to ensure its methods and materials are in accordance with the NPS and the Secretary of Interior for conservation, preservation, and storage standards. Work shall not proceed until the approved plan is executed.
5.2 During work progress the selected vendor shall furnish upon request:
A. Daily report detailing work attempted or accomplished
5.3 At the conclusion of the contract the selected vendor shall provide the following:
A. The selected vendor must produce a completed object condition survey in narrative form for all 350 objects, a survey that identifies for each individual textile its catalog number, room location, a basic description, condition, material, previous repairs, suggested treatment, number of conservation hours needed to conserve the object, and its provenance (with circa date range).
Survey will also identify priorities for treatment of these objects and include color photos of each object as part of the completed report. The Contractor will provide the following to the COR:
1. three bound paper hard copies of the completed textile condition survey on 8 1/2 x 11 paper with color photographs
2. one electronic copy of the completed condition textile survey in PDF format on a flash drive.
5.4 Submit all delivery requirements to the Contracting Officer’s Representative (COR).
6.0 GOVERNMENT-FURNISHED PROPERTY
6.1 The Contractor is responsible for the cost and acquisition of all project related materials, labor, and services necessary to complete the work of this contract. The government will not provide any materials, labor, and services necessary to complete the work of this contract. Project related expenses of any kind are the responsibility of the
Contractor.
6.2 Background materials attached to the scope of work include a copy of Rules for
Contractors in Historic Buildings (Attachment B) which identifies specific guidelines that shall be followed by contractors when they work on-site. In general, no food, drink, or smoking is permitted within site work areas. Contractor shall protect-in-place adjacent artifacts in immediate work areas as outlined in their NPS approved plan (including historic floors, staircase components, walls, artifacts, light fixtures, etc. as required), and refrain from storing project equipment on-site during the course of the project.
7.0 SECURITY AND SAFETY
Contractors and their team shall be escorted at all times by a National Park Service staff member while they are working on-site. This means that contractors shall not be left unattended, even for short periods of time, and an NPS staff member shall be continually monitoring them as they work, in the immediate vicinity. Please note that there should be no expectation of a contractor working independently, without staff monitoring or staff supervision, in any NPS facility. For more details, please refer to the Contractor
Monitoring SOP that is attached to this solicitation.
Backpacks and bags are subject to inspection. Contractor team members may be required to wear an identification badge while on-site and use a sign in sheet to log their on-site hours. Selected vendor shall be required to submit a roster supplying the names of participating team members prior to the start of any on-site work. Parking location is subject to security issues and shall be handled on a case by case basis.
Contractor will be required to submit an NPS approved health and safety work plan. Plan will detail steps taken by the Contractor to avoid damage to Glenmont artifacts and historic features/finishes as well as steps taken to reduce the incident of accident or injury during the course of the project. Plan must outline all equipment and materials used for the project and their related safety features or properties as well as any special safety requirements identified on their Safety Data Sheets (SDS sheets will also be submitted by the contractor with the plan). Please note that the park strictly adheres to guidelines specified in Safety Data Sheets for on-site work as part of the park’s safety protocol. Any required PPE must have up-to-date certification and an up-to-date fit test if required for on-site work.
In the health and safety work plan, the Contractor must also address how they will adhere to any relevant CDC guidance related to COVID-19 in the work place while working on-site at the Glenmont estate. The manual “Guidance on Preparing Work Places for
COVID-19” (OSHA 3990-03 2020) is attached to this solicitation for the bidder’s reference. Please note that the contracting team may be required to wear appropriate PPE, (ie mask and gloves that meet the current CDC recommendations for reducing the risk of
COVID-19 disease transmission), to execute appropriate disposal of PPE, to sanitize their work equipment and work areas (ie scaffolding, etc.), to adhere to current social distancing guidelines, to adhere to current COVID-19 reporting requirements to initiate contact tracing, to adhere to current quarantine guidelines, etc. in order to reduce the risk of disease transmission while working on-site, if so dictated by New Jersey state guidelines and/or CDC guidelines for managing COVID-19 in the workplace. These guidelines are continually being updated and shall change over time.
Contractor must ensure that they provide sufficient labor (ie number of individuals required) to safely complete all aspects of this work as per OSHA guidelines.
The offeror’s equipment, tools, and supplies must be of a size and configuration capable of safely accommodating such work and must be equipped with the necessary fire and safety capabilities. Selected vendor must provide a form of egress in the event of fire during the course of the project.
For safety, security, and preservation reasons, family, friends, or pets are not permitted to accompany the contractor’s staff to the job site at Thomas Edison’s home, Glenmont.
This includes, but is not limited to, underage children. The park reserves the right to request that the Contractor produce documentation for any person on-site which provides evidence that they are legitimate and approved project personnel assigned to work on the project.
Please note that on-site hot work, including use of heat guns, tack irons, blow dryers, or other heat generating equipment or welding is not permitted for this project.
8.0 PLACE OF PERFORMANCE
8.1 LOCATIONS
A. On-site work will be completed at the following location inside Thomas Edison
National Historical Park:
1. Pick up, delivery, and on-site work will be completed at Glenmont, Thomas
Edison National Historical Park, Llewellyn Park, 12 Honeysuckle Avenue, West Orange, New Jersey. Contractor must be present for any associated deliveries related to supplies for the on-site project work. Please note that navigating steps in narrow halls with historic staircases and plaster walls and ceilings is required to complete any transport process as well as key tasks related to the project. Potential bidders should take notice of the spacial restrictions of the confined work spaces where the work takes place and the historic nature of the path of travel for transport of objects, equipment, and supplies and plan accordingly, notating how these restrictions will be handled in their bidding proposal.
2. Special attention must also be paid to not damage historic objects adjacent to the work site in the historic rooms as well as navigating narrow corridors that feature historic finishes, historic light fixtures and windows, historic floors and staircases, and historic walls and historic artifacts, not only in the period rooms and the museum collection storage areas but along the path of transport leading to and from these spaces, all of which contain artifacts and are historic in nature.
On-site work/pick up/drop off/packing may only be done between the hours of 9:00 am and 3:30 pm, Monday through Thursday, excluding holidays. On-site work is subject to weather conditions, other state of emergency conditions, or government shutdown.
Access is by advanced appointment only. Please note that on-site work hours are non-negotiable and the contractor must consider the hours of availability of the resource when formulating their fixed cost estimate for this project.
9.0 PERIOD OF PERFORMANCE
The Contractor shall be required to commence work under this contract within 10 calendar days after the date of the award to the Contractor, execute the work diligently and complete the entire project within an ten month timeframe which begins on the date of award.
Within 10 calendar days after award, submit Certificate of Liability Insurance for the project.
Within 30 days after the award, Contractor will also be required to submit an NPS approved Protect-In-Place plan detailing how artifacts such as adjacent furniture, architectural features, modern carpeting, historic steps and staircases, plaster walls, ceilings, stained glass windows, decorative finishes, etc. will be protected in place by the
Contractor, to the extent deemed necessary to protect the estate and its historic features and artifacts from damage during project work. Contractor must identify the specific techniques and materials to be used for this purpose. Within 30 calendar days after date of award, contact COR to discuss project and schedule for on-site work. Within 30 days after award, Contractor will be required to submit an NPS approved health and safety work plan.
Upon completion of contract, the lead conservator shall submit three final paper hard copies and one electronic copy of the textile condition survey with all photo documentation for the project to the COR, as per the criteria identified in other sections of this document. Contractor must also have removed all associated supplies, tools, and equipment from on-site locations.
DELIVERABLES: DUE:
Provide Certificate of Liability Insurance for project
Within 10 calendar days of award
Contact COR to schedule on-site work/conduct pre-project meeting, provide NPS approved Protect-In-Place plan and NPS approved health and safety work plan
Within 30 calendar days of award
Complete on-site work portion of project Within 180 calendar days of award
Submit draft of completed textile object condition survey (all 350 records) to NPS staff for review and feedback – please note that this draft must be submitted on a jump drive with all of the records in draft form for one submission – vendor cannot send a portion of the draft records at a time, for a series of submissions, but must instead submit the entire draft report in one submission
Within 210 calendar days of award
Contractor completes any necessary edits to the survey, as per NPS review, and submits the final version of the completed textile object condition survey for NPS approval, contractor removes all supplies/equipment used to execute the project from the Glenmont estate
Within 300 calendar days of award
10.0 PAYMENT SCHEDULE
PAYMENT SCHEDULE:
A. Upon completion of the on-site project work and NPS approval of the first draft of the textile object condition survey, submitted in the format which is outlined in this document (50 %)
B. Upon submission and approval of the final, completed draft of the textile object condition survey, submitted in the format which is outlined in this document and the removal of any supplies or equipment used on-site at the Glenmont estate
(50%)
Attachment A
Modern photo of Thomas Edison’s 1880 residence, Glenmont
Modern Images of Examples of Historic Textiles from this Collection
Modern Images of Examples of Historic Textiles from this Collection
Modern Images of Textile Storage Areas in Edison’s Home, Glenmont
Modern Images of Textile Storage Areas in Edison’s Home, Glenmont
Attachment B
RULES FOR CONTRACTORS IN HISTORIC BUILDINGS
Food, drink, or gum chewing are not permitted in the historic buildings. Debris and staining left behind can permanently damage museum objects. Smoking is not permitted. Do not attempt to move or touch anything in the museum. Museum objects are too weak for functional use. We do not use historic sinks, bathrooms, ladders, chairs, or tables. Alternate work hours are subject to approval. Please review your daily work plans at your morning meeting with the assigned NPS staff member.
Any alteration to a historic structure such as a hole, insertion of a nail or bracket, an alteration of a trim or surface must first be approved by the NPS to ensure compliance with the National
Historic Preservation Act.
Protective barriers must be used between your equipment and museum surfaces. Clean blankets and plastic must protect the historic interiors from scratching, dents, and liquid spills. Surfaces of museum objects should not be used for storing tools. Protective barriers in doorways and on floor surfaces must be used to protect plaster or dust from entering into non-work areas.
Tours and museum staff may be entering into your work area. Do not block doorways or emergency exits with your equipment or supplies. Do not set up equipment near fragile objects.
No open flames are permitted in any of the buildings or on the grounds. If you plan to use any equipment that emits heat or creates a spark, you must receive ADVANCED PERMISSION from the NPS. These include use of heat guns, stripping guns, electrical drying tools, heaters, and welding torches. Procedures for hot work are strictly enforced. Work occurring in close proximity to a fire detector or sprinkler pipe that generates heat, dust or debris requires advanced notice in order to prevent accidental activation.
Chemicals and other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .