This performance work statement outlines requirements for providing electrical power to an aviation fuel system at Big Cypress National Preserve in Florida. The contractor shall run an electrical power supply line from an electrical breaker box 150 to 175 feet to connect to the fuel system. The line must be buried underground in 1.5-inch electrical conduit at a depth of 18 to 24 inches. The system must be grounded and bonded according to the fuel system manufacturer's requirements. The contractor must complete the work during normal business hours and coordinate schedules with the contracting officer and contracting officer's representative. The work is to be finished within a specified number of days after receiving a notice to proceed. The contractor will be responsible for project management, safety compliance, and developing and implementing quality control plans. Insurance requirements and other operational specifications are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fuel_Tank_Slab_Drawing_REVISED_2023_06_01_0002.pdf | ||
| Sol_140P5223R0025_Amd_0002.pdf | ||
| Sol_140P5223R0025_Amd_0001.pdf | ||
| B03_DOL_SOL_Wages.pdf | ||
| B09_QUESTIONNAIRE.pdf | ||
| Sol_140P5223R0025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Aviation Fuel System- Oasis Airfield
1. Background. The Big Cypress National Preserve is in South Florida. and encompasses729,000 acres. The preserve was established by Congress on October 11, 1974.
The Fire and Aviation Division at Big Cypress NP purchased a new fuel system. This new fuel system is expected to be delivered sometime in August to the Oasis Airfield, located behind the Oasis Visitors Center. This new fuel system will need to be supplied by electrical power.
2. Required Services. The contractor shall provide all labor, tools, equipment, materials and supervision required to Provide electrical power to UL2085 Skid Mounted Aviation fuel system
3. Contractor Responsibilities:
• Run electrical power supply line from electrical breaker box 150’ to 175’ to UL2085
JET-A AIRCRAFT FUELING SYSTEM, connecting point for the fuel system is a
1.5 inches electrical power conduit stub. Will need seal offs on both ends of the 1.5 inches underground conduit. Underground conduit buried at 18-24 inches deep and
20 feet of rigid pipe on both ends, where it starts from the control panel & where it ends at the tank. The system will need to be grounded and bonded to the earth.
4. Government Furnished Property, Materials & Supplies. None.
5. Business Hours. The contractor shall complete on-site work during normal business hours of
7:30 am to 4:30 pm, Monday through Friday, excluding Federal holidays. The contractor shall coordinate specific on-site work schedule with the Contracting Officer and Contracting Officer
Representative (COR) five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours. Work shall be completed within ## days after Contracting Officer issues notice to proceed. Any work outside of normal business hours shall be pre-approved by the Contracting Officer and COR.
6. Management. The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.
7. Safety & Environmental Compliance.
• The contractor shall comply with pertinent provisions of the Occupational Safety and
Health Act (OSHA), and state, local, safety, laws.
• The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.
• The Park safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.
• The contractor shall immediately report to the Contracting Officer, COR and Park safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.
8. Insurance. The Contractor shall be insured in accordance with State of Florida insurance regulations. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.
• Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of the State of
Florida.
• Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.
9. Performance Requirements Summary (PRS). The contractor performance requirements are summarized into required services that relates directly to successful contract completion.
The performance standard identifies the minimum acceptable levels of service allowed.
PWS
Section
Required
Service Standard
Monitorin g
Method
Incentive/
Disincentive
1.
Establish circuit breaker connection from electrical breaker box.
electrical power.
100% compliance
Random
Inspection Performance
Evaluation
2.
Run electrical lines underground thru conduit
100% compliance
Random
Inspection
Performance
Evaluation
3. Connect electrical lines to new fuel system
100% compliance
Random
Inspection
Performance
Evaluation
4. Provide grounding and bonding as required by fuel system manufacturer
100% compliance
Random
Inspection
Performance
Evaluation
10. Motor Vehicle & Traffic Regulations. Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request.
Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits.
11. Employee Badges/Parking. All contractor employees shall comply with parking procedures published for the Park. Contractor employees shall return any PARK issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.
12. Replacement of Contractor Employee for Security Reasons. The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.
13. Non-Payment for Additional Work. Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
14. Conflict of Interest. The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.
15. Quality Control. The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Performance
Requirements Summary establishes performance standards that are the minimum requirements for acceptable performance of required services. The contractor’s QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:
• Required services identified in Performance Requirements Summary
• Contractor’s surveillance methodology
• Method and timeframe for responding to COR or customer complaints
• Progress meetings with Government stakeholders
16. Quality Assurance. The COR will monitor the contractor’s performance under this contract using the quality assurance procedures specified in the Government’s Quality Assurance
Surveillance Plan (QASP). The QASP may be modified after contract award upon review and acceptance of the contractor’s QCP to ensure both plans are mutually supportive. The purpose of the QASP is to ensure that the required services are performed in accordance with the contract requirements. The plan ensures reliable and continued operation by precluding unnecessary complaints and unacceptable performance. Government’s QASP includes:
• Acceptance of the contractor’s quality control plan
• Random inspection of the contractor’s work
• Communicating customer complaints
• Progress meetings with the contractor
The implementation of this QASP does not relieve the contractor of its responsibility to implement and abide by the QCP incorporated into this contract, and to provide acceptable performance of all required services listed herein. At the CO’s discretion, the contractor may incur a payment deduction for lack of compliance with the QCP, PWS or PRS.
17. Contractor’s Proposal Package. The following deliverables are to be submitted with offer in response to RFQ.
• Technical approach to perform required services.
• Contractor safety plan.
• Contractor’s QCP
• Proof of Insurance–Business Liability & Workers Compensation.
18. Inspection. The Government will conduct inspection upon completion of required services.
Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.
ABA-CON INC.
P.O. BOX 308
TITUSVILLE, FL 32781
PHONE: (321) 567-4967
FAX: (321) 607 6805
WEB:
www.aba-con.com
TI
TL
E:
C O
VE
R
P
AG
E
JOB NUMBER:
CVR
DRAWING NUMBER:
PROJECT CONTRACTOR:
PROPRIETARY AND CONFIDENTIAL
The information contained in this drawing is the sole property of ABA-CON Aviation Services. Any reproducton in part or as a whole is prohibited without written permission of ABA-CON Aviation Services.
DATE:
REVISIONS
DATE DESCRIPTION
SCALE: XX:XX
KM
DRAWN BY:
APPROVED BY:
SCALED FOR ANSI B
7,500 GALLON UL2085 DOUBLE WALL FIREGUARD
ENCLOSED CANOPY DESIGN AST
120/25 GPM JET-A AIRCRAFT FUELING SYSTEM
FOR
BIG CYPRESS NATIONAL PRESERVE
52105 TAMIAMI TRAIL EAST
OCHOPEE, FL 34141
LIST OF DRAWINGS:
CVR: COVER PAGE
G-10: NOTES
FT-20: JET-A TANK AND EQUIPMENT
E-30: JET-A TANK ELECTRICAL SCHEMATIC
M-40: JET-A P&ID
10/7/2022
MAVEN CONSTRUCTION
& ENVIRONMENTAL, LLC
6550 ST. AUGUSTINE
ROAD SUITE 202
JACKSONVILLE, FL 32217
AB
TITUSVILLE, FL 32781
PHONE: (321) 567-4967
FAX: (321) 607 6805
WEB:
www.aba-con.com
TI
TL
E:
N O
TE
S
JOB NUMBER:
G-10
DRAWING NUMBER:
PROJECT CONTRACTOR:
PROPRIETARY AND CONFIDENTIAL
The information contained in this drawing is the sole property of ABA-CON Aviation Services. Any reproducton in part or as a whole is prohibited without written permission of ABA-CON Aviation Services.
DATE:
REVISIONS
DATE DESCRIPTION
SCALE: XX:XX
KM
DRAWN BY:
APPROVED BY:
SCALED FOR ANSI B
10/7/2022
MAVEN CONSTRUCTION
& ENVIRONMENTAL, LLC
6550 ST. AUGUSTINE
ROAD SUITE 202
JACKSONVILLE, FL 32217
PIPING:
1. System Pipe 1.0" and Larger: 304/304L, ASTM A312, SCH10 Stainless steel, flanges 304/304L, 150#, RF, ASTM A182 Elbow 90-45, reducers 304/304L, ASTM A403 SCH10
2. System Pipe 1.0" and smaller: 304/304L, ASTM A312, SCH40, Stainless steel fittings 304/304L, ASTM A182
3. System Instrument Tubing: ASTM A269, grade TP316 stainless .035 wall seamless
4. Compression Fittings: DK-LOK 316 stainless steel
5. Systems piping shall be cleaned internally before final assembly
SYSTEM PERFORMACE REQUIREMENTS:
Minimum Working Pressure Ratings*
1. Aboveground Steel Fuel Oil Piping 150 psig
2. Vent, Gauge, and Fill Piping: 100 psig
3. Fuel Storage Tank: 5 psig
4. Fuel Storage Tank, Secondary Containment Shell Walls: 5 psig
5. Fuel Control/Operating Valves: 250psi
6. Jet-A Tank Fuel Unloading Rate: 120gpm
7. Jet-A Tank Recirculation Rate: 120gpm
8. Jet-A Aircraft Dispensing Rate: 25gpm
OPERATION MANUALS:
Provide (1) copies of Operation and Maintenance manuals for all equipment including parts list, instruction sheets, and other literature that is provided with systems components
DELIVERY, INSTALLATION AND START-UP:
1. Contractor shall provide safe delivery of tank system.
REGULATORY REQUIREMENTS:
1. NFPA 30 Flammable and Combustible Liquid Code
2. NFPA 70 National Electrical Code (NEC)
3. NFPA 77 Recommended Practice for Static Electricity
4. NFPA 407 Standard for Aircraft Fuel Servicing
5. UL 142 Standard for Safety, Steel AST's for Flammable and Combustible Liquids
6. UL 842 Standard for Valves for Flammable Fluids
7. ANSI/UL 87, Power Operated Dispensing Devises for Petroleum Products
8. ANSI/UL 913, Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III Division 1 Hazardous (Classification) Locations
9. American Petroleum Institute (API) Standards. Regulations and Publications, including Appendices for design, cleaning, construction, installation of tanks, piping, and dispensing system
10. API Bulletin 1500, 1542, 1581, 2000
11. API Bulletin 1529 Aviation Hose
12. API Bulletin 1540 Design, Construction, Operation, and Maintenance of aviation Fueling Facilities
13. PEI Standards RP-200, RP-100-90, RP-300, RP-400, and RP1300
14. ATA-103 Standard for Jet Fuel Quality Control at Airports
15. Applicable Local, State, and Federal Codes and Regulations
16. Local and State Dept. of Environmental Management
17. Approvals by Authority Having Jurisdiction
AVIATION STORAGE TANK
SYSTEMS
TITUSVILLE, FL 32781
PHONE: (321) 567-4967
FAX: (321) 607 6805
WEB:
www.aba-con.com
TI
TL
E:
JE
T-
A
TA
N K
AN
D
E Q
U
IP
M
EN
T
QUOTE NUMBER:
FT-20
DRAWING NUMBER:
PROJECT CONTRACTOR:
PROPRIETARY AND CONFIDENTIAL
The information contained in this drawing is the sole property of ABA-CON Aviation Services. Any reproducton in part or as a whole is prohibited without written permission of ABA-CON Aviation Services.
DATE:
REVISIONS
DATE DESCRIPTION
SCALE: AS NOTED
KM
DRAWN BY:
APPROVED BY:
SCALED FOR ANSI B
GENERAL NOTES:
1. CAPACITY 7,500 GALLONS NOMINAL
2. DOUBLE WALL, TYPE II CONSTRUCTION, 360 DEGREE WRAP, UL-2085
3. SHOP TEST WITH AIR AT 3 - 5 PSI, USE DOUBLE WALL TESTING PROCEDURES
4. ATTACH TANK LABELS AS FOLLOWS:
A. "UL-2085"
B. THIS TANK REQUIRES EMERGENCY RELIEF VENTING CAPACITY NOT LESS THAN 344,340 CU. FT./HR.
C. THIS TANK IS PROVIDED WITH AN INTEGRAL STEEL FOUNDATION AND IS INTENDED FOR STATIONARY INSTALLATION ONLY
5. MATERIAL: CARBON STEEL
6. OVERFILL PREVENTION:
A. WARNING: AT 90% CAPACITY, CLOCK GAUGE (ITEM 6) PROVIDES AN AUDIBLE AND VISUAL ALARM AT ANNUNCIATOR PANEL (ITEM 7).
B. SHUTOFF: AT 95% CAPACITY, FLOAT VALVE (ITEM 13) CLOSES BONNET VENT OF HIGH LEVEL SHUTOFF VALVE (ITEM 12) WHICH THEN
CLOSES, PREVENTING FURTHER FUEL INPUT
7. OVERSPILL PROTECTION: TRANSPORT CONNECTION, PUMP, AND PIPING ARE ALL WITHIN INTEGRAL EQUIPMENT DECK. APPROXIMATE CAPACITY: 250 GAL, FITTED WITH NORMALLY CLOSED MANUALLY OPERATED DRAIN VALVE (ITEM 14)
8. (ITEM 8) - (ITEM 12)
(ITEM 12)THIS VALVE AND EQUIPMENT ARE USED TO SHUT OFF FUEL FLOW AT 95% TANK CAPACITY. (ITEM #8) IS THE ANTI-SIPHON SOLENOID
VALVE THAT PREVENTS FUEL FROM BEING SIPHONED FROM THE TANK SUCTION PIPING.
THE VALVE OPERATES AS FOLLOWS. THE 3" N/C 115VAC SOLENOID VALVE IS ALWAYS CLOSED UNTIL THE PUMP SWITCH IS ACTIVATED.
32"0" 16"
EQUIPMENT PLAN VIEW
1:32
FT-20
40"0" 20"
FRONT VIEW
1:40
FT-20
60"0" 30"
TOP VIEW
1:60
FT-20
60"0" 30"
LEFT VIEW
1:60
FT-20
40"0" 20"
BACK SECTIONED VIEW
1:40
FT-20
10/7/2022
MAVEN CONSTRUCTION
& ENVIRONMENTAL, LLC
6550 ST. AUGUSTINE
ROAD SUITE 202
JACKSONVILLE, FL 32217
1 345 610
34 34
24" MANWAY
THERMAL
INSULATION
FILL PORT
THERMAL
INSULATION
FILL PORT
1717 32
19A
21A 21B
22A 22B
21A 21B
21A22A
19A
19B
21A 21B
22B
22A
19A
19B
5 25
25 26
JET-A NFPA PLACARD
FT-20
20'-6" 6' 26'-6"
8'-6"
6" 4"
12' MINIMUM
INTERIOR RUNG
LADDER
AB
ITEM QTY DESCRIPTION PART NUMBER MANUFACTURER
1 1 JET-A TANK 7,500 GALLON, UL-2085 FIREGUARD, 96" PRIMARY DIA. 102" SECONDARY DIA. 20'-6" LONG, + 72" ENCLOSED CANOPY/EQUIPMENT DECK AREA WITH SPILL CONTAIMENT OF 250 GALLONS. BOX SKID SUPPORTS, TANK INTERIOR SANDBLASTED TO SSPC-SP10 EPOXY LINED INTERNATIONAL INTERLINE 850 WHITE EPOXY, EXTERIOR SANDBLASTED TO SSPC-SP6 DEVOE 235 EPOXY PRIME, FINISHED PAINTED INTERNATIONAL DEVTHANE 379K1000 WHITE URETHANE GLOSS ENAMEL, REAR RUNG LADDER, ONE
EACH 24" MANWAY, INTERIOR LADDER, FOUR (4) ANCHOR POINTS
7,500 GALLON UL-2085
DOUBLE WALL
STI FIREGUARD
FLORIDA EQ-352
Modern Welding
2 2 EARTH GROUNDING CONNECTION. COPPER-BONDED GROUNDING LUG, 5/8" X 2-1/2" LONG (MIG-WELDED TO TANK SUPPORT) 615800 (5/8" X 2.5" LONG) ERITECH
3 1 VENT 3" TANK VENT WITH STAINLESS STEEL RISER PIPE 354-0300-AV Morrison
4 2 8", 8oz/sq.in. EMERGENCY VENT-FLANGED, w/O-RING (PRIMARY & SECONDARY E.VENTS) 244OF-0100-AV Morrison
5 1 ADAPTER-4" ALUMINUM (MANUAL STICK GAUGE & FUEL SAMPLE PORT) 400-A-AL DIXON
1 DUST CAP-4" LOCKING (MANUAL STICK GAUGE & FUEL SAMPLE PORT LIQUID TIGHT CAP) 400-DC-LAL DIXON
6 1 CLOCK GAUGE (TANK LEVEL GAUGE) 918-0400-AG
FLORIDA EQ-527 Morrison
7 1 ALARM ANNUCIATOR (90% TANK CAPACITY ALARM WITH TEST BUTTON) 918-0400-AG
FLORIDA EQ-527 Morrison
8 1 VALVE,SOLENOID, 3", N/C 120VAC COIL, EXPLOSION PROOF, WEATHER TIGHT W/TEFLON SEALS, STAINLESS STEEL, FLANGED (ANTI-SIPHON VALVE N/C) 710FSS3300 1V Morrison
9 1 ADAPTER-4" ALUMINUM (TANK FILL CONNECTION) 400-A-AL DIXON
1 DUST CAP-4" LOCKING (TANK FILL CONNECTION LIQUID TIGHT CAP) 400-DC-LAL DIXON
10 1 HAND PUMP (TANK BOTTOM SUMP PUMP) 114000-5HP-100-NUL GPI
1 SPR. RETURN 3/4" BALL VALVE STAINLESS (HAND PUMP ANTI-SIPHON VALVE N/C) 22-061-41 LANCE
1 VALVE BALL 3/4" STAINLESS (MAINTENANCE VALVE) 22-061 LANCE
1 ADAPTOR-3/4" (SUMP DISCHARGE) 75-A-AL DIXON
1 DUST CAP-3/4" (SUMP DISCHARGE LIQUID TIGHT CAP) 75-DC-AL DIXON
11 1 INTERSTITIAL TANK SPACE LEAK INDICATOR WITH GUARD 724-1200 AI
FLORIDA EQ-929 Morrison
12 1 VALVE HIGH LEVEL SHUT-OFF ANGLE VALVE 2" (95% TANK CAPACITY CONTROL VALVE HYDRAULICALLY OPERATED, DIAPHRAGM-ACTUATED, FAIL CLOSED, N/C) 265338 OCV
1 VALVE POSITION VISUAL INDICATOR 255700 OCV
1 INLINE STRAINER ((PROTECTS SYSTEM FROM SOLID CONTAMINANTS) 660704 OCV
1 FTG. 3/8 X 3/8 COMP MODIFIED S/S (CONTROLS OPENING AND CLOSING SPEED OF CONTROL VALVE) (TAMPER PROOF) 6-6-FBZ-SS ABA-CON MODIFIED Parker
1 SPR. OPEN BALL VALVE 1/4" STAINLESS (SYSTEM PRE-CHECK VALVE) 76-501-01A APOLLO
1 D-RING, STAINLESS STEEL, PRE-CHECK 3896T3 MC MASTER
1 CABLE, CLEAR VINYL COVERED GTP-1093 Gammon
13 1 95% VALVE & FLOAT (95% TANK CAPACITY MODULATING FLOAT PILOT) 230151 OCV
14 1 VALVE BALL 3/4" BRASS EQUIPMENT DECK SPILL CONTAINMENT DRAIN VALVE XV500P-12 Parker
15 1 3" WAFER CHECK VALVE, VITON SEAL CV41DSV0300 TITAN
16 4 BALL VALVE 2" FIRE SAFE, FLANGED, API-607 FS50114-RF-2" SHARPE
17 7 BALL VALVE 3" FIRE SAFE, FLANGED, API-607 FS50114-RF-3" SHARPE
18 1 LINE STRAINER FLANGED 3" 286FDI-3100-AS Morrison
19-A 1 PUMP GNX2.5A, 50PSI BY-PASS PRESSURE 120GPM GNX2.5A BLACKMER
1 GEAR REDUCER 2.65 RATIO PUMP SPEED 660 RPM BLACKMER
1 MOTOR, EXPLOSION PROOF 230VAC 1-PHASE 5-HP 1800 RPM CXL21542 BALDOR
19-B 1 PUMP GNX2.5A, 50PSI BY-PASS PRESSURE 120GPM GNX2.5A BLACKMER
1 GEAR REDUCER 2.65 RATIO PUMP SPEED 660 RPM BLACKMER
1 MOTOR, EXPLOSION PROOF 230VAC 1-PHASE 5-HP 1800 RPM CXL21542 BALDOR
20 2 Starter-NEMA 7-9 EXPLOSION PROOF ENCLOSURE, SIZE "1" STARTER MOTOR 14DUF32HAA4 Furnas
21-A 1 FILTER VESSEL EI 1581, 6TH EDTION FILTER SEPERATOR. CATEGORY-M TYPE-S. HCS-322-1424 FACET
3 CM SERIES COALESCER CARTRIDGES EI 1581 6th EDTION CAT. M CM-22SB-5 FACET
1 SM SERIES SEPARATOR CARTRIDGE EI 1581 6th EDTION CAT. M SM-424FB-5 FACET
1 ARMSTRONG MODEL 21AR, AIR VENT, CAST IRON, 208PSI 21AR ARMSTRONG
1 AIR ELIMINATOR CHECK VALVE 3/4" MNPT GTP-2916-10 Gammon
1 3/4" BALL VALVE STAINLESS, LOCKABLE 22-061-11 LANCE
1 SPR. RETURN 3/4" BALL VALVE STAINLESS 22-061-41 LANCE
1 ADAPTOR-3/4" (SUMP DISCHARGE) 75-A-AL DIXON
1 DUST CAP-3/4" (SUMP DISCHARGE LIQUID TIGHT CAP) 75-DC-AL DIXON
1 VALVE, PRESSURE RELIEF, STEEL, 75PSI 3CRV00F 75PSI HYDROSEAL
1 1CC WATER PROBE GTP-9330-1 Gammon
21-B 1 FILTER VESSEL EI 1581, 6TH EDTION FILTER SEPERATOR. CATEGORY-M TYPE-S. HCS-322-1424 FACET
3 CM SERIES COALESCER CARTRIDGES EI 1581 6th EDTION CAT. M CM-22SB-5 FACET
1 SM SERIES SEPARATOR CARTRIDGE EI 1581 6th EDTION CAT. M SM-424FB-5 FACET
1 ARMSTRONG MODEL 21AR, AIR VENT, CAST IRON, 208PSI 21AR ARMSTRONG
1 AIR ELIMINATOR CHECK VALVE 3/4" MNPT GTP-2916-10 Gammon
1 3/4" BALL VALVE STAINLESS, LOCKABLE 22-061-11 LANCE
1 SPR. RETURN 3/4" BALL VALVE STAINLESS 22-061-41 LANCE
1 ADAPTOR-3/4" (SUMP DISCHARGE) 75-A-AL DIXON
1 DUST CAP-3/4" (SUMP DISCHARGE LIQUID TIGHT CAP) 75-DC-AL DIXON
1 VALVE, PRESSURE RELIEF, STEEL, 75PSI 3CRV00F 75PSI HYDROSEAL
1 1CC WATER PROBE GTP-9330-1 Gammon
22-A 1 DIFFERENTIAL PRESSURE GAUGE GTP-534-PB-30A Gammon
1 PRESSURE GAUGE 4", LM, 160PSI, L/F, 1/4NPT, SS 9699257 WIKA
2 MILLIPORE TESTING PORTS IN-OUT FLOW KIT-7 Gammon
22-B 1 DIFFERENTIAL PRESSURE GAUGE GTP-534-PB-30A Gammon
1 PRESSURE GAUGE 4", LM, 160PSI, L/F, 1/4NPT, SS 9699257 WIKA
2 MILLIPORE TESTING PORTS IN-OUT FLOW KIT-7 Gammon
23 1 HOSE REEL ,115V, ALUM INTERN TOP RIGHT W/AUX CRANK V-EPJ-24-25-26 LF HANNAY
HOSE REEL HOSE ROLLER GUIDE C-2 HANNAY
1 COUPLING VICTAULIC 2" 77 2" Victaulic
1 AIRCRAFT FUELING NOZZLE 295SA-0138 OPW Fuel
1 DRY-BREAK ACTUATOR 1.5" MNPT GTP-920-2 Gammon
1 DRY-BREAK DUST CAP FOR 920-1 ACTUATOR GTP-1428 Gammon
1 DRY-BREAK DISCONNECT 1.5" FNPT GTP-919-1 Gammon
1 DRY-BREAK DUST CAP FOR 919-1 DISCONNECT GTP-1768 Gammon
1 HOSE EI-1529, AVIATION FUELING HOSE, COUPLER MXM, W, CERT SIZE: 1.0" X 75'
25 1 3" X 8' ALUMINUM FLOATING & SUCTION ASSEMBLY 3X8AFS ABA-CON
1 SWIVEL-3" ALUM FOR SUBMERGE SERVICE (DOUBLE) FLANGED 3640-FJ0302 OPW ENG.
1 3" WAFER CHECK VALVE, VITON SEAL, DUCTILE IRON, EXTERIOR EPOXY LINED V0315DVTLS RITEPRO
1 ADAPTER-2" ALUMINUM (FLOATING SUCTION TEST CABLE PORT) 200-F-AL DIXON
1 DUST CAP-2" LOCKING (FLOATING SUCTION TEST CABLE PORT LIQUID TIGHT CAP) 200-A-AL DIXON
1 1/8" BRAIDED 304 STAINLESS STEEL TEST CABLE
26 1 TOTAL CONTROLS (SPA). METER, VEEDER-ROOT MECHANICAL REGISTER 1/10 USG 70015SPA2T TOTAL CONTROL
27 1 120VAC DUAL SINGLE STAGE WATER CONTROL SYSTEM GTP-1750-5-1-2-1-3-3-3-5(X2) Gammon
28 1 3" VALVE EXTERNAL EMERGENCY VALVE, FLANGED, 165˚ FUSIBLE LINK VALVE 346DI-0300-AV Morrison
29 1 REEL, GROUND 100' SPR/REWIND HGR-100 17-80 Hannay
1 CABLE, NYLON COVERED 100' GTP-1093HOV Gammon
1 STOP BALL GTP-1486 Gammon
1 CABLE STOP BALL CLAMP GTP-1487 Gammon
1 CLAMP HEAVY DUTY, AIR FORCE TYPE GTP-1101 Gammon
30 1 LEFT SIDE MOUNTED LADDER / DECK PLATFORM, SPRING CLOSED GATE (PAINTED OSHA YELLOW) ABA-SMCW-102 ABA-CON
31 1 MANUAL ONE PIECE CALIBRATED GAUGE STICK 12' (NOT SHOWN) (MANUAL GAUGE STICK) 12-Jan BAGBY
32 2 VALVE BUTTERFLY 2" VITON 310200-1101038B BRAY
33 1 VALVE BUTTERFLY 3" VITON 310300-1101038B BRAY
34 2 SPARE PLUGGED FITTING - 4" FNPT
36 1 1.5" ELECTRICAL POWER CONDUIT STUB
37 1 EXPLOSION PROOF CANOPY LIGHT FIXTURE EMI120X2G KILLARK
38 2 VALVE SWING CHECK 3/4" STAINLESS 46635K65 MCMASTER
39 1 PUMP BY-PASS VALVE, STEEL, 20-40 PSI BV2A-1-2-W-W BLACKMER
40 1 NEMA 7-9 EXPLOSION PROOF ENCLOSURE FURNAS
2 EXPLOSION PROOF PUMP ON-OFF SWITCH w/GREEN INDICATOR LIGHT 51SA2AA / XLRL-GH FURNAS
1 EXPLOSION FUELING OPERATION SELECTION SWITCH 51SA2AA FURNAS
1 EXPLOSION PROOF CANOPY LIGHT FIXTURE ON-OFF SWITCH 51SA2AA FURNAS
41 1 ALUMINUM ROLL DOOR SATIN FINISH W/LOCK 58"H X 78"W GORTITE
42 PRODUCT PIPING 1.0" AND LARGER, SCH10 304/304L STAINLESS STEEL, ASTM SA312 USA
43 PRODUCT PIPING 1.0" AND SMALLER, SCH40 304/304L STAINLESS STEEL, ASTM SA312 USA
44 FLANGES 304/304L S/S, 150# RAISED FACE S/O FLANGE, ASTM SA182. ELBOW 90-45 REDUCERS, SCH10 304/304L S/S, ASTM SA403WPW. FLANGE GASKETS-C4401 1/16" NON-ASBESTOS. BOLTS ASTM A193 GRADE 5 STAINLESS STEEL. NUTS - HEXAGON ASTM A193 GRADE 5. USA
45 INSTRUMENT TUBING: ASTM A269, .035 WALL, 304 STAINLESS. COMPRESSION FITTINGS: DK-LOK TUBE FITTINGS 316 S/S. STAINLESS STEEL THREAD TAPE MIL-T-27730A. USA
TI
TL
E:
10/7/2022
MAVEN CONSTRUCTION
& ENVIRONMENTAL, LLC
6550 ST. AUGUSTINE
ROAD SUITE 202
JACKSONVILLE, FL 32217
FIELD WIRING TO BE SIZED BY ELECTRICIAN
ACCORDING TO LOAD, VOLTAGE, AND
DISTANCE FROM POWER SUPPLY
ABA-CON INC.
P.O. BOX 308
TITUSVILLE, FL 32781
PHONE: (321) 567-4967
FAX: (321) 607 6805
WEB:
www.aba-con.com
JE
T-
A
TA
N K
EL
EC
TR
IC
AL
S
C H
EM
AT
IC
JOB NUMBER:
E-30
DRAWING NUMBER:
PROJECT CONTRACTOR:
PROPRIETARY AND CONFIDENTIAL
The information contained in this drawing is the sole property of ABA-CON Aviation Services. Any reproducton in part or as a whole is prohibited without written permission of ABA-CON Aviation Services.
DATE:
REVISIONS
DATE DESCRIPTION
SCALE: XX:XX
KM
DRAWN BY:
APPROVED BY:
SCALED FOR ANSI BWARNING!
1. 3 PHASE CIRCUIT TO PUMP. IF ANY HIGH LEG,
CONNECT TO L3.
2. THERE MUST BE AN INDIVIDUAL BREAKER AND
CIRCUIT PER HOSE REEL.
3. THE CONTROL, HOSE REEL, VESSEL SUMP
HEATER CIRCUIT, AND OPTIONAL EQUIPMENT
(IF EQUIPPED) CANNOT BE CONNECTED TO THE
PUMP MOTOR CIRCUIT IN ANY WAY! DOING SO
WILL VOID WARRANTY.
4. ANY MODIFICATIONS TO ELECTRICAL SYSTEM
WITHOUT WRITTEN APPROVAL WILL VOID
WARRANTY.
R
ED
4G
A.
RED 14GA.
OVERLOAD
RELAY
2 T1 T2 T3
L1 L2 L3
V M W
95 96
PUMP
MTR
5 HP
230 VOLT
1PH
JET-A PUMP CIRCUIT 2
ISSUING
1 ɸ 230VAC
21 FULL LOAD AMPS
COIL STRAPPED
FOR 220VAC
BREAKER PANEL
(BY OTHERS)
NEUTRAL
JET-A FUELING CABINET
ANTI
SIPHON
VALVE
CLOCK
LEVEL
GAUGE
ALARM
COPPER
CLAD
GROUND
STUD
STARTER ENCLOSURETANK
RED 10GA.
BLU 10GA.
BLK 10GA.
ISSUING
PUMP
ON/OFF
SWITCH
RED 14GA.
WHT 14 GA.
GRN 14 GA.
90% TANK CAPACITY
BATTERY
ALARM
BOX
RED 14GA.
WHT 14 GA.
EARTH GROUND
(BY OTHERS)
BLK 8 GA.
R
ED
4G
A.
LIGHT CIRCUIT
1 ɸ 120VAC
20 FULL LOAD AMP
BREAKER REQUIRED
BL
K
8G A.
LIGHT
ON/OFF
SWITCH
JET-A CONT CIRCUIT
1 ɸ 120VAC
20 FULL LOAD AMP
BREAKER REQUIRED
E-STOP
SHUNT TRIP
DISCONNECTS
ENTIRE PANEL
WHT 14 GA.
BLK 8 GA.
BLK 8 GA.
GRN 14 GA.
WHT 14 GA.
BLU 8 GA.
RED 8 GA.
BLK 8 GA.
WHT 14 GA.
HOSE REEL
1ɸ 120VAC
20 FULL LOAD AMPS
BREAKER REQUIRED
FILTER SUMP 1
GAMMON
XXX VAC A B C D
A B C D
D
EAD
M
AN
W
ATER
D
EAD
M
AN
W
ATER
A
B
C
D
POWER ON
INTRINSICALLY SAFE INPUTS ONLY
B D
RELAY DIAGRAM
1 5
RELAY DIAGRAM
1 5
GAMMON
GTP 9330-1
WHT
BLK
WATER (B)
GTP-9316-3
WATER (D)
GTP-9316-3
WATER
IN-FUEL ID
LIGHT
WHT
BLK
GAMMON
GTP 9330-1
HEATER
BLK 8 GA.
WHT 12 GA.
BLK 12GA.
WHT 12GA.
RED 12GA.
BLU 12GA.
BLK 8GA.
HOSE REEL
MOTOR
R
ED
4G
A.
RED 14GA.
OVERLOAD
RELAY
2 T1 T2 T3
L1 L2 L3
V M W
95 96
PUMP
MTR
5 HP
230 VOLT
1PH
JET-A PUMP CIRCUIT 1
RECEIVING
1 ɸ 230VAC
21 FULL LOAD AMPS
COIL STRAPPED
FOR 220VAC
RED 10GA.
BLU 10GA.
BLK 10GA.
RECEIVING
PUMP
ON/OFF
SWITCH
R
ED
4G
A.
BLU 8 GA.
RED 8 GA.
BLK 8 GA.
WHT 14 GA.
PUMP ID
LIGHT
PUMP ID
LIGHT
FILTER SUMP 2
AB
AutoCAD SHX Text L1
AutoCAD SHX Text L2
AutoCAD SHX Text L3
AutoCAD SHX Text L1
AutoCAD SHX Text L1
AutoCAD SHX Text L1
AutoCAD SHX Text L1
AutoCAD SHX Text L2
AutoCAD SHX Text L3
TITUSVILLE, FL 32781
PHONE: (321) 567-4967
FAX: (321) 607 6805
WEB:
www.aba-con.com
TI
TL
E:
JE
T-
A P&
ID
JOB NUMBER:
M-40
DRAWING NUMBER:
PROJECT CONTRACTOR:
PROPRIETARY AND CONFIDENTIAL
The information contained in this drawing is the sole property of ABA-CON Aviation Services. Any reproducton in part or as a whole is prohibited without written permission of ABA-CON Aviation Services.
DATE:
REVISIONS
DATE DESCRIPTION
SCALE: XX:XX
KM
DRAWN BY:
APPROVED BY:
SCALED FOR ANSI B
JET-A TANK EQUIPMENT AREA
JET-A TANK
SR
TR
AN
SPO
R
T D
ELIVER
Y
MS MSF
OUTIN
T
LI
FLOATING SUCTION
TRANSPORT
SHUTOFF VALVE
*NOTE: 1 PER
SYSTEM
PR
TANK
FILL
SHUTOFF
VALVE
95%
SHUTOFF
VALVE
OVERFILL
VALVE
PRE-CHECK
95% CAPACITY
FLOAT VALVE
TANK
LEVEL
GAUGE
NOTE:
2 PER
SYSTEM
LOCKABLE
BALL VALVE
HAND
PUMP
TANK SUCTION
SHUT-OFF VALVE
A
90% ALARM
4"
TUBING
3/8"
TUBE
3/4"
PIPE
3/4"
PIPE
3/4"
PIPE
3"
PIPE
3"
PIPE
3"
PIPE
FLOW METER
C. V.STR
C. V.
C. V.
C. V.
FDP
FILTER
UPDRAFT
VENT
SPRING CLOSED
BALL VALVE
PUMP
ANTI-SIPHON
VALVE
FIRE
VALVE
FUEL HOSE
HOSE REEL
FUELING NOZZLE
LEGEND
FI LI
FLOW
INDICATOR
LEVEL
INDICATOR
FIRE
VALVE
RELAX
CHAMBER
RC
SUMP
RECOVERY
SR
PRESSURE
RELIEF
AIR
RELIEF
SPRING
CLOSED BALL
VALVE
MS
MILLIPORE
SAMPLE
VS
VISUAL
SAMPLER
HAND
PUMP
FILTER
VESSEL
F
FLOW
METER
FUEL
HOSE
PUMP
BALL
VALVE
LINE
STRAINER
ORIFICE FLOAT
VALVE
BUTTERFLY
VALVE
CHECK
VALVE
DIAPHRAGM
VALVE
ELECTRICALLY
ACTUATED
VALVE
T
CAMLOK
UPDRAFT
VENT
PRESSURE
VACUUM
VENT
EMERGENCY
VENT
VAPOR
RECOVERY
ADAPTER
PR
PRESSURE
GAUGE
FILTER
VESSEL
DIFFERENTIAL
PRESSURE
FILTER VESSEL
WATER
DETECTOR
PROBE
4" TUBING
8" TUBING
2" TUBING
4" PIPING
2" PIPE
3" PIPE
CONDUIT/
WIRING
HR
FUEL HOSE
HOSE REEL
FUELING NOZZLE
FILTER
SUMP
HEATER
BYPASS
VALVE
VA
VACUUM
GAUGE
IM
INTERSTITIAL
GAUGE / MONITOR
SP
SUBMERSIBLE
PUMP
MECHANICAL
FLOAT
ACTUATED
SHUT-OFF
VALVE
MECHANICAL
ANTI-SIPHON
VALVE
WT
WASTE
TANK
4" PIPE
1-1
4" PIPING
8" TUBING
1-1
2" PIPING
1" PIPING
2-1
2" PIPE
3-1
2" PIPE
6" PIPE
10/7/2022
MAVEN CONSTRUCTION
& ENVIRONMENTAL, LLC
6550 ST. AUGUSTINE
ROAD SUITE 202
JACKSONVILLE, FL 32217
PUMP
MS MSF
OUTIN
3/4"
PIPE
FDP
FILTER
AIRCRAFT
1" X 75' HOSE
HR
1/2"
TUBE
1/2"
TUBE
2"
PIPE
2"
PIPE
2"
PIPE
2"
PIPE
2"
PIPE
3"
PIPE
2"
PIPE
PR
C. V.
| A06 Drawings - 7,500 GALLON UL2085 DOUBLE WALL_Big Cypress National Preserve.pdf |
| 2227--CVR.pdf |
| Sheets and Views |
| -CVR |
| 2227--10 NOTES.pdf |
| Sheets and Views |
| -10 NOTES |
| 2227--20 JET-A TANK AND EQUIPMENT.pdf |
| Sheets and Views |
| -20 JET-A TANK AND EQUIPMENT |
| 2227--30 JET-A TANK ELECTRICAL SCHEMATIC.pdf |
| Sheets and Views |
| -30 JET-A TANK ELECTRICAL SCHEMATIC |
| 2227--40 JET-A P&ID.pdf |
| Sheets and Views |
| -40 JET-A P&ID |
File details come from the government source that posted it. Updated .