This is a performance work statement for herbicide application services at the Eufaula National Wildlife Refuge in Eufaula, Alabama. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other non-personal services necessary to perform herbicide spraying on 94 acres of the Kennedy Unit outlet pool and 279 acres of the Kennedy Unit inlet pool to control invasive plant species such as alligatorweed, Chinese tallow, and maidencane. The contractor must be capable of ground and aquatic application by truck, ATV, small watercraft or agricultural equipment according to federal, state, and manufacturer regulations. The contractor shall achieve 100% treatment and 95% control of target species within the delineated areas. The period of performance is June 17 through August 30, 2024. Pricing is fixed price per task for the outlet pool and fixed price per acre for the inlet pool.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Price_Schedule_for_Sol_140FS324Q0004_.pdf | ||
| Sol_140FS324Q0004.pdf | ||
| PAST_EXPERIENCE_REFERENCES.pdf | ||
| Service_Contract_Act_WD___2015-4631.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Eufaula National Wildlife Refuge Herbicide Application
PART 1
GENERAL INFORMATION
1. GENERAL INFORMATION: This is a non-personnel services contract to provide herbicide spraying on those portions of the Eufaula National Wildlife Refuge (NWR) identified herein to control alligatorweed Alternanthera philoxeroides, Chinese tallow Triadica sebifera, maidencane Amphicarpum sp. and Panicum hemitomon, and any exotic plants. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.
The overall goal of this effort shall be to treat target plant species within the treatment unit or until funding is exhausted in order to restore native habitat and enhance growth of planted vegetation. The treatment area is a combination of riparian zones, bottomland hardwood, shrub/scrub, lakeshore, and permanent water.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the services at Eufaula NWR as defined in this Performance Work Statement (PWS), except for those items specified as government-furnished property and/or services. The contractor shall perform to the standards in this contract.
1.2. Background: Treatment and management of invasive exotic plants has been identified as one of the highest priorities within the National Wildlife Refuge System. Invasive exotic plants displace native plant communities and wildlife, including threatened and endangered species.
Invasive exotic plants degrade native habitat quality decreasing native species abundance and diversity. Refuges employ a variety of management techniques to control invasive exotic plants:
herbicide application, physical removal (heavy equipment and manual), prescribed burning, and biological control use. The services identified in this PWS are necessary for Eufaula NWR to fulfill its management objectives.
1.3. Objectives: Provide herbicide treatment to and control of targeted non-native and invasive plants identified in this PWS on the refuge.
1.4. Scope: The contractor will apply the appropriate herbicide and adjuvant to those plants, in those areas, using those methods, and during those times identified in this PWS. The contractor will apply sufficient herbicide to treat 100% and achieve 95% control of all target vegetation.
1.5. Period of Performance: Task 1: June 17-July 19, 2024; Task 2: July 1, 2024 until August 30, 2024.
1.6. General information: Each chemical (herbicide and adjuvant) will be applied according to federal and state laws, agency policies, and according to its individual manufacturer's label.
1.6.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. A quality control program is the means by which a contractor assures that work complies with the requirement of the contract.
1.6.2. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3. Recognized Holidays: The contractor must not provide services on federal holidays.
New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans' Day Thanksgiving Christmas
1.6.4. Hours of Operation: The contractor is responsible for conducting business between the hours of 6:00 a.m. and 4:00 p.m. on weekdays; except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government-directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel and subcontractors, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5. Place of Performance: The work to be performed under this contract will be performed at the Eufaula NWR Kennedy Unit located in Eufaula, Alabama: 31.960416, -85.103525.
1.6.6. Type of Contract: Task 1 is a fixed price per task contract (see Section 5.2.1.). Task 2 is a fixed price per acre contract (see Section 5.2.2).
1.6.7. Security Requirements: Not applicable.
1.6.7.1. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period; government facilities, equipment, and materials shall be secured.
1.6.7.2. Key Control: The contractor will be allowed to insert a contractor-owned padlock in sequence with a government-owned padlock. The contractor shall prohibit the opening of locked areas by contractor employees and subcontractors to permit entrance of persons other than contractor employees and subcontractors engaged in the performance of assigned work in those areas, or personnel authorized entrance by the contracting officer.
1.6.7.3. Lock Combinations: Not applicable.
1.6.8. Special Qualifications: The contractor is responsible for obtaining and maintaining all federal, state, and local certifications and licenses necessary to apply pesticides on the refuge.
All personnel, subcontractors, and equipment to be used shall be appropriately licensed and certificated as appropriate for the work to be done.
All supervisory employees and subcontractors engaged in directing the work to be accomplished under this contract shall possess recent (within the past two years) experience in directing the subject service-type operations in a supervisory capacity for the services of the approximate size/scope under this contract.
Contractor employees and subcontractors must be proficient with digital navigation systems (i.e., Global Positioning System [GPS]) so that areas identified for treatment are treated, areas not identified for treatment are not treated, and the contractor can provide the Service digital .kmz (or similar) files indicating crew tracks and areas treated.
1.6.9. Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post-award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The contracting officer, contracting officer's representative (COR), and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10. Contracting Officer's Representative: The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions.
- Ensure that the contractor performs the technical requirements of the contract;
- perform inspections necessary in connection with contract performance;
- maintain written and oral communications with the contractor concerning technical aspects of the contract;
- issue written interpretations of technical requirements including government drawings, designs, and specifications;
- monitor the contractor's performance and notify both the contracting officer and the contractor of any deficiencies;
- coordinate availability of government furnished property; and
- provide site entry for contractor personnel and subcontractors.
A letter of designation issued to the COR, a copy of which is sent to the contractor, will state the responsibilities and limitations of the COR; especially with regard to changes in cost or price estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11. Key Personnel: The contract manager and alternate contract manager are considered key personnel by the government. The contractor shall provide a contract manager and alternate contract manager who shall be responsible for the performance of the work. The contractor shall designate these individuals in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available Monday through Friday, 8:00 a.m. to 4:30 p.m. CT.
1.6.12. Identification of Contractor Employees: All contract personnel and subcontractors attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression to members of the public that they are government officials. They must also ensure that all documents or reports produced by the contractor are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel and subcontractors will not be required to obtain and wear badges in the performance of this service.
The contractor shall provide the Service with contact information for all ground personnel and subcontractors and vehicle and equipment identification information (including make, model, color, name of company, and contact information) at least 48 hours before implementation of the project.
1.6.13. Contractor Travel: Not applicable.
1.6.14. Other Direct Costs: Not applicable.
1.6.15. Data Rights: The government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government.
These documents and materials may not be used or sold by the contractor without written permission from the contracting officer. All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.
1.6.16. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in the FAR Subpart
9.5. The contractor shall notify the contracting officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the contracting officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the contracting officer and in the event the contracting officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the contracting officer may effect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.17. Phase-in/Phase-out Period: Not applicable.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.
Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE. An employee of the government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with this PWS.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the key personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of government property.
2.1.8. QUALITY ASSURANCE. The government procedures used to verify that services being performed by the contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN. An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. Those hours during a day when the contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Contiguous United States COR Contracting Officer's Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army dbh Diameter at Breast Height DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulations HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest
OCONUS Outside Contiguous United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PPE Personal Protective Equipment PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: Not applicable.
3.2. Facilities: Not applicable.
3.3. Utilities: Not applicable.
3.4. Equipment: Not applicable.
3.5. Materials: Not applicable.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Supervision:
4.2.1. General: In order to ensure performance and accomplishment of the work as outlined herein, the contractor shall provide adequate and competent supervision at all times for all work to be accomplished by the contractor’s employees and subcontractors. When contract work is in progress, supervisory personnel and subcontractors shall be available at all times to receive notices, reports, or requests from the contracting officer. At no time shall government representatives direct or supervise the activities of the contractor’s employees and subcontractors.
4.2.2. On-site Supervision: An on-site supervisor, with the ability to speak and understand English clearly, and with the authority to act for the contractor on a day-to-day basis and to sign inspection reports and all other correspondence on behalf of the contractor, shall be present at the work site at all times when contract work is in progress, unless a contractor employee can act on the supervisor’s behalf.
4.2.3. Supervisory Responsibilities:
4.2.3.1. Providing an adequate labor force: This includes the immediate replacement of personnel dismissed for cause or leaving employment of their own volition.
4.2.3.2. Ensuring that contractor personnel and subcontractors are properly trained to perform their assigned work in a proper, safe, and efficient manner, and ensuring that the proper supplies, materials, and equipment are on hand.
4.2.3.3. Taking action to prevent general carelessness by employees and subcontractors and/or abuse of facilities or equipment.
4.2.3.4. Establishing an effective and comprehensive safety program.
4.2.3.5. Indoctrinating employees and subcontractors to report fire, hazardous conditions, maintenance deficiencies, etc.
4.2.3.6. Ensuring that the conduct of the contractor’s employees and subcontractors reflect favorably upon the contractor and the Service. If applicable, supervisory personnel and subcontractors are responsible for ensuring that employees and subcontractors fully support and participate in the energy-conservation program within the facilities.
4.3. Secret Facility Clearance: Not applicable.
4.4. Materials: Herbicide, adjuvant, water, cleaning agent.
4.5. Equipment: The contractor shall furnish all
- personal protective equipment (PPE; e.g., rubber gloves, safety glasses, respirators, dust masks) and safety supplies (e.g., first aid supplies, medications) needed by contractor employees and subcontractors and
- equipment needed to apply herbicide according to federal, state, and state laws;
agencies' policies, and manufacturers' labels. This includes any items needed to comply with safety and environmental compliance laws, regulations, and policies regarding storage of, use of, and securement from using pesticides.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services: The contractor shall provide herbicide application service for the Eufaula NWR Kennedy Unit (Figures 1 and 2). The contractor shall provide all personnel, labor, equipment (e.g., sprayers, tractors, ATV, GPS units), supplies (e.g., herbicides, adjuvant, cleaning supplies, PPE, water), transportation, tools, materials, supervision, and other non-personal services necessary to perform the requirements of this contract order and shall plan, schedule, coordinate, and ensure effective performance of required services for the entire duration of contract. Treatment applications shall be performed in such a manner as to protect non-target organisms, the environment, and the public. NOTE: The contracting officer reserves the right to require the contractor to replace any operating personnel and subcontractors, or equipment used in the performance of this contract if the personnel and subcontractors, or equipment are violating, or have violated, any state or federal laws; or are unsafe; or for any valid reason. In this event, the contractor shall as soon as reasonably possible, upon written or verbal notice (to be later reduced to writing) from the contracting officer, provide replacements satisfactory to the contracting officer at no additional cost.
All chemicals must be ground (includes watercraft) applied using contemporary control technologies. Treated plants must be left in place. The contractor shall have full responsibility for systematically treating the entire area. The crew supervisor shall be responsible for notifying the contracting officer within three weeks of treatment completion so that area can be inspected.
Areas not treated, or not responding to treatment shall be retreated at the contractor’s expense, if it is determined that the contractor provided inadequate treatment measures. The contractor shall be responsible for 100% treatment and 95% control (four to six months post-treatment) of all target species within the delineated treatment area.
The contactor shall use only those herbicides that have been approved for use on the refuge through the Service's pesticide use proposal process. Rates applied shall not exceed the highest rate recommended on the label for that treatment. All chemicals (e.g., herbicide, adjuvants, cleaning/spill response agents) must be labeled for aquatic use.
The contractor shall supply equipment to meter chemicals and bark oil mixtures, and shall provide mixing and loading equipment. The contractor must be capable of calibrating equipment to the final application rate specifications.
Public safety must be ensured when spraying or using pesticides. The refuge is visited by the public. In application areas where there is potential for public use, the refuge shall advise the contractor of any public use hazards. It shall be the ultimate responsibility of the contractor to initiate spray operations (go/no go). The contractor shall mitigate for herbicide contamination on federal land and adjacent private property, and any adjacent waters. Herbicides shall be applied and utilized as approved or recommended on the label. Any fines or penalties for herbicide contamination or resultant environmental damage shall be the responsibility of the contractor.
The refuge manager must be notified at least 48 hours prior to any chemical application.
Only heavy equipment approved by the refuge manager shall be allowed to operate within the treatment units. Generally, low ground pressure four-wheel drive equipment is recommended.
Equipment cannot cause ruts greater than six inches deep. In most areas, four-wheel drive agricultural tractors or boom sprayers are acceptable. The contractor is responsible for freeing stuck equipment and restoring rutted areas to their former condition. If work is prohibited by the Service due to extended wet weather, negotiations may be made to lengthen the contract period.
The contractor shall clean and flush spray equipment in accordance with U.S. Environmental Protection Agency (EPA) guidelines prior to arrival. Contractor/operator may not flush/rinse out tanks onto refuge property. Prior to leaving the worksite for the day, the contractor shall remove all equipment and materials associated with contract activities from government property unless approval has been granted by the refuge manager and a storage site has been identified. The government is not responsible for damage to or loss of contractor equipment left on the refuge, even that equipment approved to remain on the refuge overnight. The contractor shall be responsible for cleaning up any spills that may occur.
The contractor shall avoid damage to wildlife and non-target native vegetation. The contractor shall not collect, harass, harm, or molest wildlife or non-target plants. The contractor shall not search for, handle, collect, or damage archaeological or cultural resources. The contractor shall be responsible for the removal of all trash and treatment-related equipment (e.g., flagging). The contractor shall be held liable if damage was determined to be caused by contractor negligence, the result of improper treatment techniques, or the result of contractor control activities.
Each ground crew shall consist of one supervisor and no more than six crewmembers per supervisor. The ground crew supervisor must be a licensed herbicide applicator, and shall be responsible for data collection, herbicide application and inventory, herbicide safety procedures, and crew supervision. The ground crew supervisor shall have navigation equipment such as a hand-held GPS unit, to digitally record areas of treatment for submittal to the contracting officer.
All targeted plants, or populations of such plants, shall be treated and treatment sites recorded at each designated location before proceeding further.
All herbicides and adjuvants shall be handled and stored in accordance with instructions on the EPA registration label. All herbicides shall be mixed and applied in accordance with the label instructions. The contractor shall be responsible for providing, handling, mixing and disposing of all herbicides and adjuvants. The contractor shall be responsible for providing all mixing water. In addition, the contractor shall ensure that no contamination of any water source occurs, and that emergency spill containment equipment or spill kit shall be present at the worksite, and shall be capable of containing all potential herbicide or surfactant spills from contract vehicles or equipment.
Work performance shall be defined as 100% of identified areas and species infestations to be treated and a 95% control rate achieved four to six months post-treatment. If the control rate is not met, it shall be the responsibility of the contractor to re-treat areas until the control rate is achieved at no additional cost to the government.
Performance Requirements Summary (Table 1): The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
5.2. Tasks:
5.2.1. Task 1
Kennedy Unit outlet pool:
The 94-acre treatment area of this unit (Figure 3) is mostly flat and open. The boundary generally is described by levees. While several lower elevation areas (e.g., catch basin, ditches) hold standing water year round, the majority of the area is accessible by four-wheel drive agricultural equipment. Lower elevation areas are narrow or accessible by small watercraft.
Except for trees greater than three inches diameter at breast height (dbh), all vegetation within the treatment area shall treated with a foliar application of Rodeo and Red River 90 according to the manufactures' labels. Within the requirements provided elsewhere in this PWS, the contractor shall propose the chemicals and methods to achieve 95% control of invasive tree species greater than three inches dbh. The chemicals and methods shall be proposed at least three weeks prior to work beginning. Native tree species larger than three inches dbh shall not be treated.
5.2.2. Task 2
Kennedy Unit inlet pool:
The 279-acre treatment area of this unit (Figure 4) is mostly (75%) wooded. The boundary generally is described by lakeshore, refuge boundary, or levees. While several lower elevation areas (e.g., catch basin, ditches) hold standing water year-round, the majority of the area is accessible by foot or ATV. Lower elevation areas are narrow or accessible by small watercraft.
Some areas (25%) are accessible by four-wheel drive agricultural equipment.
Primary target vegetation for this task are alligatorweed (~10% infestation), Chinese tallow (~10% infestation), and maidencane (~25% infestation). Any other exotic plants (<10% infestation) are secondary target vegetation. Within the requirements provided elsewhere in this PWS, the contractor shall propose the chemicals and methods to achieve 95% control of target vegetation. The chemicals and methods shall be proposed at least three weeks prior to work beginning.
5.3. Deliverables (Table 2):
5.3.1. List of proposed herbicides, adjuvants, and methodologies
5.3.2. Coordination, application, and wrap-up meetings
5.3.3. Work plan to include schedule
5.3.4. Safety/spill response plan
5.3.5. Weekly Universal Daily Progress Reports documenting
- location (in Universal Transverse Mercator), acreage and/or stems per acre treated, and habitat type of all areas treated,
- quantity of herbicides and surfactants used by area treated,
- number of applicators,
- hours worked, and
- equipment-use hours for each equipment type.
5.3.6. Upon completion of the project, total volume of each chemical used, list of species treated with each herbicide and the estimated infested acres treated by species
5.3.7. Digital .kmz (or similar) files documenting tracks and waypoints collected
5.4. Special Conditions: Weather and site conditions may interfere with the work completion schedule negotiated at the award conference. The contracting officer may halt work at any time upon written notice for conditions beyond the control of the contractor. If this results in significant time lost, the completion date for the project can be re-negotiated by the contracting officer and the contractor.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS:
6.1. Contractor will conform to all government-mandated safety requirements regarding PPE, safety procedures, chemical labeling, etc.
6.2. Contractor employees and subcontractors must conform to all refuge regulations regarding us by the general public (Title 50 Code of Federal Regulations) except as needed to perform the actions identified by this PWS.
Table 1: Performance Requirements Summary indicating the performance standard, acceptable quality level, surveillance method and consequence of non-compliance for each contract task.
Task Performance Standard
Acceptable Quality Level
Surveillance Method
Consequence of Non-compliance
Provide deliverables
Provide deliverables
No deviation (100% compliance)
Inspections Non-compliance with submittal schedule will result in a poor performance rating and/or termination.
Treat Kennedy Unit outlet pool (Task 1)
Complete all measures outlined in Performance Work Statement
Treat entire unit (100%), significant control of target vegetation (95%)
Inspections Non-compliance will result in work being redone at contractor’s expense, a poor performance evaluation, and/or termination.
Treat Kennedy Uniy inlet pool (Task 2)
Complete all measures outlined in Performance Work Statement
Treat entire unit (100%), significant control of target vegetation (95%)
Inspections Non-compliance will result in work being redone at contractor’s expense, a poor performance evaluation, and/or termination.
Table 2: List of deliverables indicating the frequency of production, number of copies required, format, and individual to whom they are submitted.
Deliverable Frequency Number of copies
Medium or Format Submitted to
List of proposed herbicides, adjuvants, and methodologies (5.3.1)
Once, three weeks prior to start
Two Word or .pdf Contracting officer, field representative
Coordination, application, and wrap-up meetings (5.3.2)
As scheduled Not applicable Not applicable Contracting officer, field representative
Work plan to include schedule (5.3.3)
Once, prior to project start
Two Word or .pdf Contracting officer, field representative
Safety/spill response plan (5.3.4)
Once, prior to project start
One Word or .pdf Contracting officer
Weekly universal daily progress reports (5.3.5)
Weekly Two Word or .pdf Contracting officer, field representative
Summary report (5.3.6)
Within one week of Task completion
Two Word or .pdf Contracting officer, field representative
Map files (5.3.7) Weekly Two .kmz or similar Contracting officer, field representative
Figure 1: Map showing the Eufaula National Wildlife Refuge Kennedy Unit in relation to Eufaula, Alabama.
Figure 2: Map of Eufaula National Wildlife Refuge (ENWR) Kennedy Unit Task 1 and Task 2 treatment areas. Blue line indicates ENWR boundary, red line indicates Task 1 treatment area, orange line indicates Task 2 treatment area.
Figure 3: Map of Eufaula National Wildlife Refuge (ENWR) Kennedy Unit 94-acre Task 1 treatment area. Red line indicates treatment area, blue line indicates ENWR boundary.
Figure 4: Map of Eufaula National Wildlife Refuge (ENWR) Kennedy Unit 279-acre Task 2 treatment area. Orange line indicates treatment area, blue line indicates ENWR boundary.