A04_Battle Mountain SOW.docx

DOCX document 34 KB Posted

Attached to
Aerial Seeding Federal contract opportunity
Solicitation number
140L3920Q0087
Issued by
Department of the Interior Bureau of Land Management Nevada Region

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Seeding, newest first.
File Type Posted
Sol_140L3920Q0087_Amd_0001.pdf PDF
B03_Wage Determination.pdf PDF
Sol_140L3920Q0087.pdf PDF
A04_Martin Fire Aerial Seeding FY20 SOW.doc DOC document
A06_Maps.pdf PDF
A06_Maps (Battle Mountain).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Seed Application – 2020 Fuels and ESR Treatments Battle Mountain District Office Bureau of Land Management

1.0 Description of Project

1.1 Introduction/Description of Work: The Bureau of Land Management is acquiring seeding on selected sites administered by the Battle Mountain District (see attached map). The work consists of applying seed in 8 units all in different locations for post-fire restoration purposes and both pre and post fuels treatments on BLM administered lands. The work shall consist of application of government furnished seed with contractor furnished equipment. The project areas are defined in attached maps and discussed in table 1. The terrain is steep, and most of it is inaccessible with any form of ground equipment. Also due to lack of cultural clearance, no ground disturbance is permitted with this contract. The Treatment area will not be awarded to multiple vendors. The contractor is not to treat areas outside of identified work areas.

Table 1: Units and Location of Units in Contract

Unit
Location to nearest town
Township
Range
sections
Buffalo Lowlands
17 miles east of Battle Mountain, Nevada
33 North
41 East
19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, and 35
Buffalo Highlands
17 miles east of Battle Mountain, Nevada
33 North

33 North 40 East 41 East 25, 26, 35, and 36 29, 30, and 31

Summit Lowlands
17 miles east of Battle Mountain, Nevada
33 North

32 North 41 East 41 East 32, 33, and 34 2, 3, 4, 5, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 21, 22, and 23

Summit Highlands
17 miles east of Battle Mountain, Nevada
32 North
41 East
8, and 6
Ravenwood
8 miles North Northwest of Austin, NV
22 North
42 East
5, 6, 7, 8, 9, 14, 15, 16, 23, and 24
Fish Creek
9 miles Southwest of Eureka, NV
18 North

17 North 17 North 52 East 52 East 53 East 23, 25, 26, 35, and 36

Stinking Springs
16 miles North Northwest of Eureka, NV
22 North

21.5 North

21 North 52 East 52 East 52 East 20, 29, 30, and 31 5, and 6

7 Mile
36 miles Southwest of Eureka, NV
14 North
50 East
15, 21, 22, 23, 26, 27, and 28

1.2 Project specific information:

1.2.1 Project Name: Seed Application- 2020 Fuels and ESR treatments

1.2.2 Approximate Period of performance: September 15, 2020 to December 15, 2020

1.2.3 The seed is only partially premixed (2 different mixes may be mixed together per site) and see table 2 for the approximate rate of seeding, rates may change with availably of seed, but it should only be plus or minus 2 pounds per acre.

1.2.4 Landscape: Mountainous

Table 2: Seeding Unit Details

Units
Coverage
Acres
Pounds/Acre*
Buffalo Lowlands
Seed Every 3rd pass
4,195 acres
8 pounds/acre
Buffalo Highlands
Seed Every 2nd pass
2,204 acres
10 pounds/acre
Summit Lowlands
Seed Every 3rd pass
5,670 acres
8 pounds/acre
Summit Highlands
Seed Every 2nd pass
761 acres
10 pounds/acre
Ravenswood
Seed Every pass
650 acres
8.5 pounds/acre
Fish Creek
Seed Every pass
429 acres
8.5 pounds/acre
Stinking Springs
Seed Every pass
364 acres
8.5 pounds/acre
7-mile Fuels treatment
Seed Every pass
438 acres
8.5 pounds/acre

Total

14,666 acres

* pounds per acre is an approximate rate of seeding, rates may change with availably of seed, but it should only be plus or minus 2 pounds per acre.

2.0 General Information

2.1 Site tour: Interested parties are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Inquiries about project location are welcome, and maps to assist in site visits are available at the Battle Mountain District, 50 Bastian Road, Battle Mountain, NV.

2.2 Base of Operation: The Contractor shall provide such operation facilities as may be required for competent performance of contract. Use of any operation area shall be arranged by and at the discretion and risk of the Contractor, and the Government shall not be held responsible for any loss, mishap, or accident due to conditions of any operating facility used. The Contractor shall provide appropriate warning signs for traffic if roads are used as operating sites. Contractor will return sites to pre-use condition.

2.3 Contractor: Designated area shall be seeded in conformance with these specifications and this Statement of Work. Unless otherwise specified, the Contractor shall furnish at work sites all equipment, labor, supplies, and materials required to complete the job. The Contractor shall be responsible for service and repair of equipment as necessary to continually maintain satisfactory work progress.

2.4 Seed: Seed will be furnished by the Government at the location(s) agreed upon during the pre-work conference. The location of the seed must be agreed upon with 7 days minimum between when the location is decided upon by the contractor and the Government representative and when the seeding will take place. The Contractor shall be responsible to protect seed from loss or damage. Seed damaged or lost while in the custody of the Contractor shall be replaced by the Contractor at no additional expense to the Government. The Contractor must inform the Government representative within 5 days of the seeding being done so that any remaining seed and government equipment can be removed from the site.

2.5 Seed Application: The Contractor must be able to evenly distribute the designated seed at the rates specified in this Statement of Work. Equipment that cannot perform the specified work shall be modified or replaced by the Contractor within two calendar days. Application equipment shall be equipped for carrying seed with distribution mechanism including release, shutoff, and spreading device which can be calibrated for spreading seed at the prescribed rate in an acceptable manner and uniform pattern. Seed application equipment shall include physical measures to prevent seed from blowing out.

2.6 Seeder Calibration: The Contractor shall calibrate seeding equipment prior to application on the project. The Government will supply seed for calibration. However, the seed may not be available until approximately two days prior to the approximate start date of the project. Seed not used for calibration shall be recovered for use on the project.

2.7 Quality Control and Monitoring Equipment: The Contractor shall furnish equipment to monitor and ensure evenly spaced, straight, regular, and complete coverage of all areas included in the seeding job. The contractor is responsible for making sure that the correct seeding rate is utilized and that there is quality control in place to make sure that on the ground coverage is complete and accurate.

2.8 Work Crew: All Crew for operation of equipment and seed handling and loading shall be furnished by the Contractor.

2.9 The period of performance is from September 15, 2020 after the first wetting rain/snow event, and will be completed no later than December 15, 2020 (depending on weather and soil conditions). Government preference is for application immediately prior to wetting rain/snow event.

2.10 The Contractor shall begin work within 7 calendar days of the date agreed upon in the prework conference. The Contractor shall continue performance of the work under the contract without delay or interruption except by causes beyond his control as defined by contract clauses, or by the receipt of a “Suspend Work Order” issued by the Government. Failure to do so may be cause for action under the “Default” clause. The Contractor shall complete all work required within the time specified.

3.0 Operations:

3.1 Hazards: Any hazards that would pose a danger to Contractor, Contractor’s personnel, the public or operating equipment should be identified, mitigated and/or avoided by the Contractor and brought to the Government representative’s attention.

3.2 Rate of Seeding: Seed shall be distributed at the rate stated in this Statement of Work or as directed by the Contracting Officer or the Contracting Officer’s Representative (CO/COR). Some seeding rates may be slightly reduced or increased due to availability of seed.

3.3 Application Conditions: Seed shall not be applied when the wind speed exceeds ten miles per hour.

3.4 Coverage: The entire surface within the designated boundaries of the job area shall receive uniform coverage with the seed. Seeding strips shall be patterned in such a manner as to secure as high a uniformity of seed distribution. Such distribution shall not vary more than 15 percent above or below the average distribution of seed per unit of surface specified for the particular area concerned. Inspection will be made as operations progress to determine uniformity of application. The Contractor is required to show how they will do quality control and on the ground inspections while seeding. Any areas missed by the Contractor or seeded to less than the concentration specified shall be re-seeded and brought up to standard, or by suitable deduction from contract price, at the option of the Government. No additional cost to the Government will be incurred.

3.5 Seed openings of the distribution mechanism shall be inspected at sufficient intervals by the contractor to insure proper functioning and even distribution of seed. If at any time inspection of equipment reveals that seed openings are not properly operating or that feeders are blocked, the COR may require reseeding of that portion of the area or areas if the Government determines it was not properly seeded, at no additional cost to the Government.

3.6 Tests for Uniformity and Rate of Application: Both the Contractor and the Government will conduct tests as operations progress to determine uniformity of seeding. Contractor is required to provide to the Government how they will be determining uniformity of seeding and all records of what was determined during implementation.

3.7 Work Stoppages: The Government reserves the right to stop seeding operations at any time when seeding conditions are considered sufficiently unfavorable to warrant stoppage. Stoppage shall continue until seeding operations are again authorized by the Government. No monetary compensation will be given to the Contractor for work suspensions.

3.8 Completion of Contract: The contract will be considered completed, and payment due when all seed furnished to the Contractor by the Government has been seeded to the standards specified above; or when all areas designated under the contract have been seeded to specifications; or if performance under the contract is ordered to be terminated by the Government; and when the Contractor has furnished the Government with the Shapefiles and Printouts.

3.9 Environmental Consideration: The project site shall be cleaned up to pre-use condition, and all refuse shall be removed and disposed of at an approved landfill.

4.0 Submittals:

4.1 Approvals: Approval of a submittal is an indication that the Contractor’s submittal has been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the CO/COR attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

4.2 Scope: Submittals include work schedules, proposed work areas and/or facilities, equipment to be used, quality control plan, and safety plan.

4.2.1 Safety Plan: The Contractor is responsible for providing a safety plan that identifies a point of contact at an emergency medical facility in the event of any accident. The plan should include names and emergency phone numbers for personnel and facilities to contact, including Flight for Life/ Life Flight/ Care Flight, etc., in case an emergency warrants such actions. The plan should also include a description of on-site emergency procedures to follow in case of an accident. The plan should identify the insurance company providing coverage and the pertinent group coverage number.

4.2.1.1 It is the responsibility of the Contractor to identify all hazards within the work area. All appropriate precautions shall be taken by the Contractor.

4.2.1.2 In addition to being responsible for the safety of their employees, the contractor is also responsible for providing for the safety of the public during operations. This includes compliance with all OSHA and State of Nevada regulations for the application of seed and the use of equipment.

4.2.2 Work Schedule: The schedule shall include the starting date and duration of the project, the order in which the contractor proposes to carry out the work, type of equipment to be used, names and titles of personnel, including the Contractor’s superintendent. The schedule shall also indicate the dates of important milestones, i.e.; the sequence of the sites to be completed. The schedule shall be submitted to the COR at the pre-work conference. When requested by the CO/COR, the Contractor shall submit an updated schedule within 1 calendar day to the CO, with a copy to the COR.

4.3 Requirements: Refer to specifications for submittals required. Complete Submittals shall be delivered a minimum of 3 days prior to the Pre-work Conference. To allow for review by the government and approval/ modification negotiations to be done prior/during the prework conference.

4.4 Identification of Submittal: Completely identify each submittal by showing at a minimum, the following information.

4.4.1 Name and address of submitter, plus name and telephone number of the individual to contact for further information.

5.0 Quality Assurance

5.1 Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications.

5.2 Conflict: Where conflict occurs between reference documents and project specifications, the project specifications shall govern.

5.3 If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115% or below 85% of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for the completion of the project, the contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

6.0 Work Location:

6.1 Base Camp/Staging Area:

6.1.1 Due to the remote location of project sites, the Contractor may choose to camp in the area, upon approval from the Bureau of Land Management, Battle Mountain District Office. This area can also be used as a staging area for equipment and any needed equipment maintenance.

6.1.2 Staging area(s) for operations, seed loading, and equipment storage will be submitted by the Contractor prior to the pre-work meeting and approved by the COR. The contractor is responsible for securing permission to use any property or facilities from the appropriate land owner or manager.

6.2 Environmental Consideration:

6.2.1 Hazardous Materials: No hazardous materials shall be stored or disposed of on-site. Fuel, oil, and grease needed for equipment maintenance during the working period may be stored on site where no leakage or spillage will contaminate the ground, preferably in spill containment barriers. No equipment maintenance will be performed within, or near, any stream channel or waters where petroleum products or other pollutants from equipment may enter these waters.

6.2.2 Spills: The Contractor shall prevent or reduce the discharge of pollutants to the environment by reducing the chance of spills through safe operating practices, maintaining equipment, stopping the source of spills, containing and cleaning up spills, properly disposing of spill materials, and shall take appropriate corrective action as approve by the COR. The excavated contaminated materials will then be disposed of at a certified hazardous waste facility.

6.2.3 Staging/Storage: Staging/Storage area for equipment and materials should be located outside of streams or any wetland/riparian habitat areas. Any equipment or vehicles driven and/or operated within, or adjacent to streams or other water should be checked and maintained daily to prevent leaks.

6.2.4 Wilderness and Wilderness Study Areas: No Mechanical Equipment including motorized equipment, aircraft, etc. is allowed on the ground or doing ground-disturbing activities within any Wilderness or Wilderness Study Areas.

6.2.5 Washing Vehicles/Equipment: All vehicles/ground equipment being used on this project shall be steam cleaned or pressure washed prior to starting and/or ending project to prevent the spread of noxious weeds. The area used for this procedure must be pre-approved by the COR or PI.

7.0 Contractor Furnished Property and Services

7.1 The contractor shall furnish all labor, equipment, fuel, supervision, supplies (except those designated as Government-furnished) and incidentals to perform all work as set forth in the specifications. The contractor will be responsible the transportation and storage of the supplies and equipment used for the project.

7.2 The Contractor shall furnish sufficient equipment to satisfactorily seed the designated areas in the time specified as required in this Statement of Work. Contractor shall be capable of applying seed at the rate and width specified in this Statement of Work over varying ground elevation. Contractor shall provide a communication system so that contractor personnel engaged in the project at different locations can communicate at all times with each other, in addition so the government Project Inspectors (PI) may communicate with the contractor at any time to discuss concerns or performance matters. The Contractor shall comply with all applicable Federal, State, and Local regulations.

7.3 GPS and Navigation

7.3.1 The Contractor is responsible for making sure that they are in the correct area, the BLM will not be denoting the area on the ground.

7.3.2 The Contractor shall be equipped with a GPS Guidance/Tracking system capable of accepting and utilizing ArcGIS Shapefiles (.shp) or Google Earth files (.kmz) and of directly supplying Shapefiles or KMZs of treatment coverage to the Government in UTM projection North America Datum 1983 upon completion of each treated area or as required by the Contracting Officer. Treatments will be GPSed daily and the GPS system must be able to adequately represent exactly what is treated.

7.3.3 Navigation: Differentially Corrected Global Positioning System (DGPS) is required for tracking, and data collection. The Contractor shall provide all guidance equipment, materials, computers, printers, personnel, and services required for the system to be used. The system shall be sufficiently sensitive to provide immediate deviation indications (real-time). The DGPS system must be capable of determining a differentially corrected location with an error of no more than one to two meters in the horizontal plane. The guidance system shall be capable of updating current position at a rate of a minimum of one time per second. Differential correction must cover the complete operational area. During operation, differentially corrected signal must be accurately recorded at least 90% of the operational time. Differential correction may be provided by a portable differential station, FM radio fixed towers, or satellite.

7.3.4 DGPS navigation unit shall insure straight and regular paths of application. Irregular paths of application will result in immediate stoppage of work. Corrective action shall be taken immediately by the contractor to insure evenly spaced, straight, and regular application paths and complete coverage of areas included in the spraying job. The entire surface within the designated boundaries of the project area shall receive uniform coverage with seed except for areas excluded by the Government. Areas excluded from the seeding operation within the designated boundaries will not be included in the acreage computed for payment. Dispersal shall be low enough to obtain proper distribution and uniform coverage of seed.

7.3.4.1 Any area treated outside of the unit boundaries will be at the contractors’ expense and may include payments of restitution to the BLM if resource damage is the result.

7.3.5 Project Log:

7.3.5.1 Must be capable of a minimum rate of 1-second or 10-meter logging interval. The computer program must be capable of calculating and showing total acres treated during the application and also capable of downloading to a computer for analysis and review. Full records include position, time, application system on/off (if allowed to operate continuously), and job name/number. The project log must show and differentiate between spray-on and spray-off when viewed on a GIS, or tracking turned off when not applying herbicide. Export files of each project log shall be provided and must be compatible with ArcGIS system on a standard USB memory stick. The Contractor may provide software that is compatible, and which will enable the files to convert into viewable files for ArcView or ArcGIS. The contractor must, upon request by the COR or Project Inspector, be able to supply project log data on a USB memory drive for review at any time during the contract. The Contractor will provide project log data at the end of each day’s application. The Contract will not be considered complete until the data have been reviewed and deemed complete with no skips in the treatment areas. The System must be capable of zooming in on any portion of the treatment to view a specific area with greater detail.

7.3.5.2 Contractor must be capable of storing up to 10 hours of continuous project log data.

7.4 Ultimately the contractor will be responsible for the transportation and storage of the supplies and equipment used for the project.

8.0 Government Furnished Equipment:

8.1 The Government will provide work location map(s) and electronic boundaries in the form of GIS shapefiles (.shp), georeferenced .pdf maps, KMZ (.kmz or .kml) or .gpx formats to the selected contractor prior to any pre-work conference.

8.2 Seed will be furnished by the Government at the location(s) agreed upon during the pre-work conference. The Contractor shall be responsible to protect seed and seed trailer(s) from loss or damage from the time agreed upon during the pre-work conference to when the contractor and the government agrees that the seeding is done and the seed may be removed from site. Seed and trailer(s) damaged or lost while in the custody of the Contractor shall be replaced by the Contractor at no additional expense to the Government.

8.2.1 The BLM office is open Monday through Friday, 8:00 AM to 4:30 PM except on holidays or as needed and approved by the Contracting Officer’s Representative.

8.2.2 The contractor will be responsible for providing necessary equipment and personnel to unload and load seed. All seed will be in 40-50 lb. sacks, and on pallets. The contractor shall load and transport own equipment to and from the work site.

8.3 Return of Property: Excess seed and the trailer(s) will be recovered by the Bureau of Land Management upon notification by the contractor and the agreement by the government that the sited is done being seeded.

9.0 Project Meetings

9.1 Meeting Schedule: When requested, the Contractor shall submit an updated schedule within 1 calendar day.

9.2 Pre-Work Conference

9.2.1 Notification: A pre-work conference will be held prior to the start of work but must be held no later than five business days before starting. The COR and Contractor will negotiate the time and location of this meeting. But due to the longer duration of the contract, it is incumbent upon the contractor to initiate the Pre-work conference. This conference may be held in person, or via telephone/video/teleconference. The purpose will be to review required work, Work Location Maps and specifications, schedules, payments, and administrative provisions of the Contract.

9.2.2 Attendance: The Contractor, any subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

9.2.3 Presentation: At this meeting the Contractor shall be prepared to summarize and explain procedures planned for the projects.

9.3 Progress Meeting(s)

9.3.1 Location: Meetings shall be held at the project site, or as determined by the CO/COR.

9.3.2 Notification: Meetings may be called by either the CO/COR or the Contractor. Request shall state who should attend and include an agenda.

9.4 Final Inspection:

9.4.1 Location: This meeting shall be held at the project site, or as determined by the CO/COR.

9.4.2 Attendance: The Contractor, any subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

10.0 Inspection and Acceptance

10.1 Inspection: The COR/ PI will make periodic inspections as a basis for payments and recommendations for adjustments in work quality. The Contractor is encouraged to observe inspection while they are being made and have a supervisor on site to confer with the COR/ PI.

10.1.1 Shapefiles will be viewed and/or given to the COR/ PI on a daily basis. The determination of acres completed shall be agreed upon by the Contractor and the COR/ PI on a daily basis

10.2 Final Acceptance

10.2.1 Work Performed: According to the specifications the treatment will be considered acceptance for payment if all deliverable services are complete.

10.2.2 Final Payment: Shall be made upon final acceptance of services, Government receipt of Shapefile Printouts from Contractor, return of Government-furnished property (if any) and receipt of a proper invoice at the address specified. Payment will be made by “acre”. All acres identified in the mapped work-area shall be completed in order to receive 100% payment.

10.2.3 Measurement for payment for seeding will be the actual area, in acres, within the designated boundaries satisfactorily treated in conformance with these specifications. Measurement will be made from either physical surveys of the areas or a computer-generated file created in a GPS Differential Guidance System at the option of the BLM. The Shapefile will be used in ArcGIS for final acreage measurement. Acreages will be computed from horizontal distances as shown on maps at the option of the BLM.

10.2.4 Full payment of the award amount will be authorized for satisfactorily treating and submitting the paperwork and GIS data for 1,049 acres. Up to a 15% reduction in acreage can receive full payment at the discretion of the BLM to avoid impacts to areas of cultural, historical, or biological significance identified after the contract is awarded. If the actual acreage varies more than 15 percent below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party, and will be based on the per acre costs in the accepted bid.

11.0 Contracting Officer’s Representative (COR) and/or Project Inspector (PI)

11.1 The COR and/or Project Inspector (PI) will be appointed by the Contracting Officer upon award of the contract. Such COR/PI will be responsible for giving the contractor any special instructions or guidance necessary to complete delivery as required by the contract. The COR or PI does not have the authority to modify or in any way amend the terms of this contract.