A04_2022_SOW-SAHO_Containers_Modified.pdf
PDF 137 KB Posted
- Attached to
- REQUEST FOR QUOTATION (RFQ) COMBINED SYNOPSIS-SOLI Federal contract opportunity
- Solicitation number
- 140P4522Q0028
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4522Q0028_Amd_0002.pdf | ||
| Sol_140P4522Q0028_Amd_0001.pdf | ||
| Price_Schedule-SAHO_Containers_modified.pdf | ||
| Technical_Questionnaire.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Sol_140P4522Q0028.pdf | ||
| Separately_Priced_In_Accordance_with_FAR_Clause_52.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Containers and Disposal Request for FY2022 (Base Bid), Option Years 1, and 2
Gateway National Recreation Area - Sandy Hook Unit
BASE BID (August 1, 2022 – April 30, 2023):
Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:
• The contractor shall provide twenty (20)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Disposal Fee for Containers of Maintenance Operations:
• The contractor shall provide 120.0 tons to account for the tonnage of the containers of the Maintenance
Operations. The containers will be used for mixed construction waste.
Single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit:
• The contractor shall provide five (5) 6-yard single-stream recycling dumpsters at Sandy Hook.
• All recycling dumpsters shall be for Single-Stream Recycling.
• All dumpsters shall be properly marked/labeled and in good working order.
• Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.
• The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
• Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.
• Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:
• The period of performance is from August 1, 2020 through September 20, 2020. All dumpsters shall be delivered by August 1, 2020 and removed on September 20, 2020.
• Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.
The contractor shall provide the transportation and disposal for all containers provided.
Schedule for Work:
The period of performance of this SOW is from August 1, 2022 through April 30, 2023. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m.
during the work week of Monday thru Friday excluding Federal Holidays.
For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from August 1, 2022 through September 20, 2022. All dumpsters shall be delivered by August 1, 2022 and removed on September 20, 2022.
SCOPE OF WORK (Continued)
Containers and Disposal Request for FY2022 (Base Bid). Option Years 1, and 2 Gateway National Recreation Area - Sandy Hook Unit
Option Year 1 (May 1, 2023 – April 30, 2024):
Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:
• The contractor shall provide twenty (20)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Disposal Fee for Containers of Maintenance Operations:
• The contractor shall provide 120.0 tons to account for the tonnage of the containers of the Maintenance
• All recycling dumpsters shall be for Single-Stream Recycling.
• All dumpsters shall be properly marked/labeled and in good working order.
• Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.
• The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
• Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.
• Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:
• The period of performance is from May 19, 2023 through September 19, 2023. All dumpsters shall be delivered by May 19, 2023 and removed on September 19, 2023.
• Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.
The period of performance of this SOW is from May 1, 2023 through April 30, 2024. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m.
during the work week of Monday thru Friday excluding Federal Holidays.
For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from May 19, 2023 through September 19, 2023. All dumpsters shall be delivered by May 19, 2023 and removed on September 19, 2023.
SCOPE OF WORK (Continued) Containers and Disposal Request for FY2022 (Base Bid). Option Years 1, and 2
Gateway National Recreation Area - Sandy Hook Unit
Option Year 2 (May 1, 2024 – April 30, 2025):
Intent: The intent of this contract is to hire a professional company with experience in providing containers and disposal needed for the Sandy Hook Unit of Gateway National Recreation Area. There is also a need to provide single-stream recycling dumpsters, and disposal needed for the Beach Centers at Sandy Hook Unit of Gateway National Recreation Area. The contractor must meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
Scope of Work/Services Containers for Maintenance Operations at Sandy Hook Unit:
• The contractor shall provide twenty (20)-30 cubic yard (CY) containers at various locations at Sandy Hook. Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Disposal Fee for Containers of Maintenance Operations:
• The contractor shall provide 120.0 tons to account for the tonnage of the containers of the Maintenance
• All recycling dumpsters shall be for Single-Stream Recycling.
• All dumpsters shall be properly marked/labeled and in good working order.
• Collection of all Recycling dumpsters shall be completed two times (2x) a week, Park prefers Monday and Friday. Collection days must be at least 3-4 days apart and be approved by the Park. All Collections shall be completed prior to 8:00 AM.
• The contractor shall meet all necessary Federal, State and Local requirements for the transportation and disposal of the containers and all of its materials.
• Contractor’s costs shall include all delivery, usage, and collections costs for all dumpsters provided.
• Locations will be told to the driver the day of delivery. This cost will include the delivery, usage, and pick-up of the container.
Period of Performance for Single Stream Recycling for the Beach Centers at Sandy Hook Unit:
• The period of performance is from May 17, 2024 through September 17, 2024. All dumpsters shall be delivered by May 17, 2024 and removed on September 17, 2024.
• Containers initial delivery and final pick-up shall be performed in between the hours of 8 a.m. and 1 p.m.
The period of performance of this SOW is from May 1, 2024 through April 30, 2025. Upon award of contract, the winning vendor will be obligated to complete the delivery for containers requested for Maintenance Operations upon request. Containers deliveries and pick-ups must be performed in between the hours of 7 a.m. and 2 p.m.
during the work week of Monday thru Friday excluding Federal Holidays.
For the Single Stream Recycling for the Beach Centers at Sandy Hook Unit, the period of performance is from May 17, 2024 through September 17, 2024. All dumpsters shall be delivered by May 17, 2024 and removed on September 17, 2024.