A003.pdf

PDF 77 KB Posted

Attached to
WCMD Engineering Services Federal contract opportunity
Solicitation number
FA8213-20-R-3029
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This Contract Data Requirements List (CDRL) outlines reporting requirements for a contractor providing engineering services to the Air Force Life Cycle Management Center. The contractor must submit monthly progress, status, and management reports using a contractor format. The reports are due 30 days after award and monthly thereafter, with conference minutes replacing the monthly report following a program review. The reports are distribution limited but may be shared with DoD components and must be submitted electronically to the contracting officer and other Air Force personnel via email. A total of five copies are required.

The pre-solicitation notice seeks comments on a draft RFP for engineering services in support of the Weapon Command Mission Directorate. While not a binding solicitation, it provides an opportunity for market research. Responses will not be considered offers and cannot form a binding contract. The final RFP is expected to include additional technical data and government furnished property lists. Interested parties should contact the point of contact for more information. The effort will be awarded by the Air Force Life Cycle Management Center located at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to WCMD Engineering Services, newest first.
File Type Posted
A010.pdf PDF
SectionsLnM.pdf PDF
DRAFT.RFP.FA821320R3029.pdf PDF
A008.pdf PDF
AddendumWCMDCMBRESLEPMAPEffort.pdf PDF
A001.pdf PDF
WCMDPWS.pdf PDF
A005.pdf PDF
A002.pdf PDF
A007.pdf PDF
A009.pdf PDF
A006.pdf PDF
A004.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

WCMD Engineering Services

E. CONTRACT/PR NO.

FD2020-20-50140

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Contractor's Progress, Status and Management Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80227

5. CONTRACT REFERENCE

PWS 3.2.1.2 & 11.0

6. REQUIRING OFFICE

AFLCMC/EBHCA

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor format required.

BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 9: DISTRIBUTION STATEMENT E. Distribution authorized to DoD components only(Critical Technology)(Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHCA.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLK 10, 12, 13: Initial submission of report shall be made 30 days after contract award. Subsequent submittals are due monthly until successful completion of contract. The conference minutes from Program Reviews (PR) will replace the monthly report for the period following the PR.

BLK 14: Submit report electronically via WAWF, DoDAAC, FA8213, l in Microsoft Office software or PDF format to the e-mail recipients listed below. Refer to contract for e-mail address of the government contracting officer (AFLCMC/EBHKA).

curtis.goodrich@us.af.mil (AFLCMC/EBHCA) joshua.joslyn.l@us.af.mil (AFLCMC/EBHCA)

FOB DESTINATION

EBH 20-139-001

Terry McCurdy, AFLCMC/EBHTC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

AFLCMC/EBHCA 0 1 0

AFLCMA/EBHKA 0 1 0

DCMA/QAR 0 1 0

DCMA/ACO 0 1 0

15. TOTAL 0 5 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2020/05/21

I. APPROVED BY

hargrove.eric.v.1167016843

J. DATE

2020/05/21

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

File details come from the government source that posted it. Updated .