A. Performance Work Statement.pdf

PDF 297 KB Posted

Attached to
Davis-Monthan AFB Giant Voice Repairs Federal contract opportunity
Solicitation number
FA487724QA317
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a Performance Work Statement (PWS) for the repair of the SiRcom giant voice system at Davis-Monthan Air Force Base (DMAFB). The contractor shall provide all required components, cabling, transportation, personnel, tools, labor, supervision, and management to complete the repairs. Key tasks include replacing specific equipment on various poles, such as radios, drivers, amplifiers, and batteries. The proposed repairs must comply with applicable Air Force requirements and maintain the system's current capabilities. Delivery, installation, testing, and training are required, and the contractor must submit a layout configuration for approval prior to commencement. The Government will provide a Point of Contact, emergency services, and other general support. The contractor must follow strict requirements regarding access, security, conduct, and work hours. The work will be awarded as a firm-fixed-price contract under the related federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Davis-Monthan AFB Giant Voice Repairs, newest first.
File Type Posted
C. Wage Determinations.pdf PDF
E. Site Visit Instructions.pdf PDF
B. Provisions and Clauses.pdf PDF
D. Brand Name Justification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Davis-Monthan Giant Voice Repairs

1.0 Description of Services. The contractor shall provide all required components, cabling, transportation, personnel, tools, labor, appropriate supervision, and management for repair services of the SiRcom giant voice system at Davis-Monthan Air Force Base (DMAFB). Personnel working on the system must be SiRcom certified technicians/field engineers. All repair parts must be SiRcom OEM parts to match existing equipment.

1.2 Tasks. The contractor shall be responsible for the following repair actions broken out by pole: GV1 replace 1 Motorola radio, GV2 replace 8 bad drivers, GV3 replace 1 bad driver and 1 Radio, GV4 replace amplifier, 2 bad drivers and 1 battery, GV5 replace 4 bad drivers, GV7 replace 4 bad drivers, GV9 replace 2 bad drivers, GV10 replace 2 bad drivers, GV11 replace 1 bad driver, GV15 replace 1 bad driver, GV16 replace 5 bad drivers, GV17 replace 6 bad drivers, GV18 replace 2 bad drivers, GV19 replace Motorola radio and ribbon cable.

Parts provided by contractor Quantity SSD-125 SiRcom SSD-125 Watt Audio Driver 38 Motorola M25KSS9PW1BN 03 ECO-500 Spt, Audio Amplifier, 500 Watt Class 02 Renogy RNG-BATT-AGM12-100-US 12 Volt 100 Ah 02 Radio Interface Ribbon Cable 01 1000ft - 18/2 Stranded Security Cable 02

1.3 Project Milestones. The repairs of the Giant Voice polls should follow the project milestones below:

• Delivery of new equipment

• Installation of new equipment

• Operational check of new equipment

• Training of personnel on newly installed equipment

• Delivery of documentation to include equipment documents, manuals, detailed installation drawings, and schematics

1.4 System Requirements. The proposed repairs shall meet or exceed these capabilities:

• Comply with and meet installation requirements of AFI 10-2501

• Shall be fully operational

• Operate in conjunction with command post software

• SiRcom Smart Alert Advanced Mass Notification Software

• Blackberry Athoc IP Integration Module

• Shall maintain the currently programmed capabilities

1.5 Layout Deliverable. Prior to commencement of work, layout configuration of electronic equipment must be submitted and approved by the Contracting Officer.

1.6 Documentation, Manuals. The contractor shall provide all manuals and warranty information for new parts.

2.0 Government Provided Services

2.1 Point of Contact (POC). 355th Communication Squadron (355 CS) will provide a single POC during the Period of Performance (PoP).

2.2 Emergency Services. The Government will provide Security Forces services (call 228-4444 for emergencies only), and Fire Protection services (call 228-3333). There are no emergency medical services available on DMAFB; therefore, the contractor must dial 911 for emergency medical services. If a contractor employee calls 911 from a base phone, they must tell the 911 operator that they are calling from DMAFB.

3.0 General Information

3.1 Contractor POC. The contractor shall designate a contract POC, who will be responsible for contractor performed services. Upon contract award, the contractor shall submit the name and telephone number of the POC, in writing, to the Contracting Officer. The POC shall have full authority to act for the contractor on all matters relating to daily execution of the contract and must be available at all times by phone during normal business hours, 8:00 a.m. – 4:00 p.m. local time, to discuss any contract issues or problem areas.

3.2 Pass and Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for contractor employee(s) and non-Government owned vehicles. For entry to the base, submit an entry authorization request letter for each individual requiring access to the project, at least 10 calendar days prior to beginning work. A copy of the format of this letter may be obtained from the Contracting Officer on or before the pre-performance conference. Valid identification with a photograph together with the base pass will be required for all individuals when entering the base.

3.3 Wireless Devices. Wireless technologies/devices used for storing, processing, and/or transmitting information are allowed.

3.4 Retrieval of Identification Media. The contractor shall retrieve all identification media, including vehicle passes, upon completion of the project, and turn them in to the issuing office.

3.5 Traffic Laws. Contractor employee(s) shall comply with all DMAFB traffic regulations. Contractor employee(s) are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges and debarment from the base. The use of cell phones is prohibited while driving on DMAFB, unless equipped with a hands free mode. Seat belt use is mandatory for all vehicle occupants.

3.6 Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges and debarment from the base.

3.7 Weapons, Firearms, and Ammunition. Contractor employee(s) are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately owned vehicle while on DMAFB.

3.8 Controlled Unclassified Information (CUI). The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting and safeguarding CUI material.

3.9 Reporting Requirements. Contractor personnel shall immediately report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor employee(s), resources, and classified or unclassified defense information.

3.10 Physical Security. The contractor shall safeguard all Government property, including controlled forms provided for contractor use. At the close of each work period, Government equipment, facilities, and other valuable materials shall be secured.

3.11 Contractor Travel on DMAFB. Contractor employee(s) shall not loiter in any working area before or after performing services. All contractor employee(s) shall limit their travel on DMAFB only to the specific areas required for performance of services or in travel directly to and from these locations. Upon completion of contract services, contractor employee(s) shall promptly depart DMAFB.

3.12 Contractor Employee Conduct. The Government reserves the right to require removal from the installation any contractor employee(s) who endangers persons or property, whose actions are inconsistent with professional conduct, whose continued employment is inconsistent with the interest of military security or who is found to be incapacitated or under the influence of alcohol, drugs, or other substances. Removal of employee(s) for any reason does not relieve the contractor of the requirement to perform contract services.

3.13 Project Hours. All project work shall be accomplished between the hours of 8:00 a.m. – 4:00 p.m. local time, Monday through Friday except Federal Holidays. If the contractor wants to perform installation services outside of the work hours, it will require advance coordination with the 355 CS/SCOT work center. Requests will be considered on a case by case basis.

3.14 Quality Control. The contractor shall provide quality control over the entire project including but not limited to the items of equipment and materials intended for installation, necessary coordination and services to facilitate the performance of the work, site conditions, and the workmanship of the contractor personnel and any subcontractors.

3.15 Contract Familiarity. The contractor shall become familiar with all the details of the work depicted in the contract documents and shall verify all field conditions related to the project prior to commencement of the work. If conditions are discovered by the contractor prior to commencement of the work which conflict with the contract documents, and which will substantially affect the construction as designed and depicted in the contract documents, identify and explain the condition(s) in writing to the Contracting Officer within 48 hours of discovery of the condition(s); and request clarification from the Contracting Officer before commencing work.

3.16 Manufacturer’s Instructions. The contractor shall comply fully with manufacturer's instructions, including each step in sequence. If such instructions conflict with the contract documents, identify and explain the conflict in writing to the Contracting Officer within 48 hours of discovery of the conflict; and request clarification from the Contracting Officer before proceeding.

3.17 Testing/Acceptance. The contractor shall complete a full operational check of all equipment installed.

3.18 Cleanup. The contractor shall keep the work area and surrounding surfaces clean and orderly. Remove any Contractor-caused residue, dirt, or markings immediately upon completion of the work involved. The contractor shall clean the worksite daily.

3.19 Equipment Turn In. Replaced parts will be turned into 355 CS/SCOT for disposal of products.

Performance Work Statement
2.0 Government Provided Services
3.0 General Information
Attachment 4 - Requirement-Background.pdf
MISSION OUTLOOK
1.0. PRODUCT PERFORMANCE SPECIFICATION:

File details come from the government source that posted it. Updated .