Attachment 2 - QASP

View the file

Other files for this federal contract opportunity

Other files attached to Cost Estimator Tool & Support Services, newest first.
File Type Posted
Attachment_3_-_Instructions_and_Evaluation_Criteria_Rev1.pdf PDF
Attachment_1_-_PWS_Rev_1.pdf PDF
Questions_and_Answers.pdf PDF
Attachment_2_-_QASP.pdf PDF
Attachment_5_-_CLINs.docx DOCX document
Attachment_3_-_Instructions_and_Evaluation_Criteria.pdf PDF
Attachment_1_-_PWS.pdf PDF
Attachment_4_-_Sample_Price_Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Quality Assurance Surveillance Plan (QASP) Cost Estimator Tool

01/24/2018 Version 1.0

1 Vision

1 INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Government Technical Representative

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY

LEVELS

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

5.2 Monitoring Forms

6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT

6.1 Determining Performance

6.2 Reporting

6.3 Reviews and Resolution

6.4 Surveillance Matrix

Appendix 1 - Surveillance Matrix

Appendix 2 - Corrective Action Report (CAR)

Appendix 3 - Customer Complaint Record

Appendix 4 - Performance Assessment Report (PAR)

Quality Assurance Surveillance Plan (QASP)

Cost Estimator Tool

1 Vision

The Department of Housing and Urban Development (HUD) acquires single family one-to-four unit properties from FHA Servicing Lenders following foreclosure of a defaulted FHA-insured loan. Throughout the default, foreclosure, and conveyance timeline, Lenders are required to protect and preserve the value of the insured asset, and to inspect, secure, maintain, and repair the structures, units, and other real property in accordance with specific regulations, policies, and requirements as described in the Single-Family Housing Policy Handbook, HUD 4000.1, until conveyance of the property to HUD.

HUD has established Maximum Property Preservation Allowances associated with specific preservation and protection activities, however, many preservation and protection repairs and maintenance items are not specified and reimbursement of these costs must be reviewed and evaluated by HUD for reimbursement approval. To validate bids submitted for these costs as well as to insure consistency in the approval process, HUD requires a cost estimator tool.

1 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Cost Estimating Tool. This plan sets forth the procedures and guidelines Office of Single Family, National Servicing Center (OSFAM-NSC) will use in ensuring the required performance standards or service levels are achieved by the Contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor's Quality Control Plan (QCP), and to ensure that the Government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor's performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around "what service or quality level is required", as opposed to "how the Contractor should perform the work" (i.e., results, not compliance). This QASP will define the performance management approach taken by OSFAM to monitor and manage the Contractor's performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.

Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.

1.2.2 Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A "results focus" provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor's own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor's QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. This QASP enables the Government to take advantage of the Contractor's QC program.

1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

2.1 The Contracting Officer

The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the Contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor's performance, and must be identified and designated by the CO.

2.2 The Government Technical Representative

The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor's performance.

The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions, shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor's work performance.

Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY

LEVELS

The required performance standards and/or quality levels are included in the PWS and in Appendix 1, "Surveillance Matrix". If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:

▪ 100% Inspection - Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

▪ Periodic Inspection - The COR typically performs the periodic inspection on a monthly basis.

▪ Customer Feedback

4.2 Customer Feedback

The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems. The customer always has the option to communicate complaints to the CO and/or COR, as opposed to the Contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The Acceptable Quality Levels (AQLs) included in Appendix 1, "Surveillance Matrix", for Contractor performance are structured to allow the Contractor to manage how the work is performed. For certain critical activities such as those involving The Cost Estimating Tool, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Appendix 1.

5.2 Monitoring Forms

The Government's QA surveillance, accomplished by the COR, may be reported using the following monitoring forms: Appendix 2 - "Corrective Action Report (CAR)", Appendix 3 - "Customer Complaint Record", and Appendix 4 "Performance Assessment Report" (PAR). The forms, when completed, will document the Government's assessment of the Contractor's performance under the contract to ensure that the required results are being achieved. The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT

6.1 Determining Performance

The Government will use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

At the end of each month, the Subject Matter Expert (SME) Nancy (Kathi) Cheatham will prepare a written report for the COR, Monique Denhart summarizing the overall results of the quality assurance surveillance of the Contractor's performance. This written report, which includes the Contractor's submitted monthly report and the completed quality assurance monitoring forms, will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the Contractor's project manager, or a designated alternate, to meet with the CO, SME and/or other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor's request. The agenda of the reviews may include:

▪ Monthly performance assessment data and trend analysis,

▪ Issues and concerns of both parties,

▪ Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis,

▪ Recommendations for improved efficiency and/or effectiveness,

6.3.2 The CO and COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the discretion of the CO.

6.4 Surveillance Matrix

The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.

In evaluating the quality of contractor’s performance, the following performance ratings may be used.

Performance Rating

Criteria

Excellent / Outstanding

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Appendix 1 - Surveillance Matrix

Statements Standards/AQLs Inspections Ratings

5.1

INTERNET BASED-COST

ESTIMATOR REQUIREMENTS

Deliverables:

A001 P&P Cost Estimating Tool

a) Tool should be functioning and accessible at least 24 hours a day Monday through Sunday

AQL: 95%

What: Deliverables How: Periodic inspections, monthly status reports, and customer complaints Frequency: Once a month Who: COR or SME Standard(s): Inspection applies to all standards

5.1.1 The Contractor shall provide an internet-based tool which contains an accurate and comprehensive database which has the following characteristics.

Deliverables:

A001 P&P Cost Estimating Tool

a) Tool shall be functioning and accessible 24 hours a day Monday through Sunday

What: Cost Estimating Tool status reports, and customer complaints Frequency: Monthly Who: COR/SME

5.1.2

1. The cost estimator tool/database shall provide verifiable, consistent, supportable, and reliable localized component level pricing aligned to the 5-digit ZIP code or specific to established geographic and economic markets which is consistent with industry standards for repair, replacement, maintenance or status reports, and customer complaints Frequency: Monthly Who: SME and/or COR improvement costs on residential, single family one-to-four unit properties.

5.1.3 The database shall be updated at least quarterly to reflect timely and accurate local supply issues and cost factors. The cost estimate shall not be a factor of a national average.

status reports, and customer complaints Frequency: Monthly Who: COR and/or SME

5.1.4 The database shall be able to accept additional data elements, materials, and work products, and the HUD Maximum Property Preservation Allowances.

status reports, and customer complaints Frequency: Monthly Who: COR/SME

5.1.5 The database shall provide the ability to input different variables, such as building square footage, room dimensions, roof slope and standardized variations in material and workmanship quality

5.1.6 The database shall provide descriptions and details of assumed materials, labor, and scope of work for specific cost estimating elements such as standard assemblies or labor categories.

5.1.7 The database shall be simple to access requiring minimal identifying information, steps, actions, and operations to develop a usable and repeatable estimate for common and customary activities and assemblies.

5.1.8 Cost items should be arranged in simple and logical categories and components based on industry standard trade and material divisions.

5.1.9 The database shall provide a search feature to assist in locating and selecting specific materials and activities.

5.1.10 The estimate operation shall include options, including standard elements such as taxes and overhead and profit.

5.1.11 The database shall be able to provide an automatic, unalterable graphic indication and signal to cost estimate worksheets and data when cost elements are not derived from the existing cost estimate database or when items or elements have been modified or overwritten.

5.1.12 Completed estimates shall include at a minimum, notation and recording of the following data elements: a. FHA case number (unique identifier) b.

Name of the Requestor c. Date of Request d. Property Address with Zip Code

5.1.13 Each cost estimate shall be able to be printed, saved and stored. Saved estimates shall be able to be transferred as a document or otherwise up-loaded to HUDs REO System of Record, and permanently stored within each specific FHA case record.

5.1.14 The database shall maintain files of saved HUD generated estimates that can be accessed by a HUD administrator or HUD approved contractors, for review or supervisory alteration. The archive must provide data regarding individual user activity including number of estimates generated. The estimates shall be archived in a format that is retrievable, capturing data that can be utilized to provide analytical insight, such as exceptions, trends, and quality control of expenditures.

5.1.15

The cost estimating service must be currently available to and utilized by the Mortgage, Insurance, Construction, and Preservation and Protection industries to produce and validate repair, maintenance, renovation, and construction items or preservation and protection services, for single family one-to-four-unit housing throughout the United States, Puerto Rico, and the U.S.

Protectorates.

5.1.16 Estimates derived by these employees or contractors shall be the property of HUD, to be utilized or published by HUD, and may be recorded into various HUD databases.

5.2

SUBSCRIPTION ACCESS

(LICENSES)

Deliverables:

A002 SUBSCRIPTION/LICENSES

a) Installation and setup of Cost Estimating Tool should take place within 24 hours of award and or effective date. Training provided as needed and or quarterly.

AQL: 100%

How: Customer complaints and monthly status reports Frequency: Monthly Who: COR (COR) or SME (SME)

5.2.1 Customize, set-up and install the Cost Estimating tool to meet customer requirement.

a) Installation and setup of the Cost Estimating tool should take place within 1 working day of award.

Training as needed

What: Deliverables How: Customer complaints and monthly status reports Frequency: Monthly

Deliverables:

A002 SUBSCRIPTION/LICENSES

Who: COR/SME

5.2.1.1 The Contractor shall provide unlimited, real-time access for up to 500 HUD employees and HUD contractors. Users will be identified, approved, and submitted by HUD.

5.2.1.2 Database access shall be secure, private, and accessible through controls such as user names and passwords.

5.3

MAINTENANCE

Deliverables:

A003 MAINTENANCE

a) Help Desk staff is available 18 hours a day, 5 days a week

How: Customer complaints and monthly status reports Frequency: Monthly Who: COR/SME

5.3.1 The contractor shall provide all start

a) Help Desk staff is available 18 hours a day, 5 days a week

How: Help Desk/call center staff is up and maintenance services required to initiate and operate the service within 24 hours of contract award. The contractor shall provide all labor and materials necessary to provide technical assistance and customer support for users, at a minimum, Monday through Friday, 6:00 am Eastern time to 7:00 pm Hawaii- Aleutian Time.

Deliverables:

A003 MAINTENANCE

available 24 hours a day 7 days a week Frequency: Monthly Who: COR/SME

5.4

TRAINING

Deliverables:

A004 Training

a) The contractor shall provide 4 (four) on-line, live, instructor-led systems training per period of performance to instruct, educate, and assist HUD employees and contractors on utilization and operation of the cost estimating tool and its reporting functions.

AQL: quarterly trainings

5.4.1 The contractor shall provide the initial training instruction within four days of contract award. The contractor shall provide 4 (four) on-line, live, instructor-led systems training per period of performance to instruct, educate, and assist HUD employees

a) Training shall be provided after initial award and/or effective date then quarterly or as needed.

What: the training conducted How: Feedback from users Frequency: after each training has been conducted Who: COR(COR) AND SME(SME) Standard(s): a and contractors on utilization and operation of the cost estimating tool and its reporting functions.

Appendix 2 - Corrective Action Report (CAR)

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY MAJOR MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

ACCEPTED REJECTED

12. CLOSE DATE

Appendix 3 - Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 - Performance Assessment Report (PAR)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE 6. SUSPENSE DATE

I. PERFORMANCE

7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)

NEW

REPEAT

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS

CHECKED)

10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE CONCUR NON-

CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-

CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. CONCUR NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS