829867vadotA79_120710.pdf
PDF 4 MB Posted
- Attached to
- SGR/Smart Scale - Roundabout, Rt 15 State and local contract opportunity
- Solicitation number
- 120710
- Issued by
- Prince William County, Virginia
About this file
This is a bid proposal and contract document issued by the Virginia Department of Transportation for a roundabout construction project on Route 15 in Prince Edward County. The project, designated as SGR/SMART SCALE - Roundabout, involves work from 0.055 miles west of Griffin Boulevard to 0.045 miles east of Griffin Boulevard in the Lynchburg District. The scope of work encompasses extensive site preparation, drainage infrastructure, pavement demolition and replacement, utilities installation including water and sanitary sewer systems, traffic control measures, landscaping, and electrical/signal work. Bid items include clearing and grubbing, excavation (regular and borrow), storm and sanitary sewer pipe installation, asphalt concrete placement, concrete sidewalks and curbs, retaining walls, pavement markings, sign installation, and lighting poles. The bid submission deadline was 10:00 AM on Wednesday, July 22, 2026, with bids filed electronically through Bidx. The project completion date is June 13, 2028, with substantial completion required by November 12, 2027. Prequalification is required for all bidders.
The contract specifies a five percent bid bond requirement based on the total bid amount and requires adherence to Virginia Department of Transportation Road and Bridge Specifications (2020), current standards, and numerous special provisions. Pricing submissions must include unit prices and bid totals for all listed items, with fuel adjustment and steel price adjustment options available for qualified items. The contract incorporates federal-aid highway funding through the STP-5144-(130) Federal Highway Administration program, with prevailing wage rates established under federal Davis-Bacon Act requirements, ranging from $11.99 per hour for traffic control flaggers to $26.68 per hour for crane operators. The project includes asbestos-containing materials abatement requirements, environmental avoidance provisions, and mandatory compliance with equal employment opportunity and nondiscrimination standards. Subcontractor/supplier solicitation documentation and vendor surveys must be submitted with all bids. The contract is subject to federal provisions including FHWA-1273 required contract provisions, disadvantaged business enterprise requirements under 49 CFR Part 26, and various environmental and safety standards.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: A79
CONTRACT ID. NO.: C0000120710C01
Form C-6a
Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 15
FHWA NUMBER: STP-5144-(130)
PROJECT NUMBER: 6015-144-141, C501
COUNTY: PRINCE EDWARD
DISTRICT: LYNCHBURG
DESCRIPTION: SGR*/SMART SCALE* - ROUNDABOUT
FROM:
TO:
0.055 MI. W. OF GRIFFIN BLVD.
0.045 MI. E. OF GRIFFIN BLVD.
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
Form C-118 Rev. 2-1-24
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 6015-144-141, C501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT
NO.
6015-144-141, C501 CONTRACT I.D.
NO.
C0000120710C01
FHWA NO. STP-5144-(130) DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48
Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million
____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
DEPARTMENT OF TRANSPORTATION
SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
PROJECT NUMBER: 6015-144-141, C501
ROUTE NUMBER: 15
FHWA NUMBER: STP-5144-(130)
DESCRIPTION: SGR*/SMART SCALE* - ROUNDBAOUT
FROM:
TO:
0.055 MI. W. OF GRIFFIN BLVD.
0.045 MI. E. OF GRIFFIN BLVD.
DISTRICT: LYNCHBURG COUNTY: PRINCE EDWARD
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: JUNE 13, 2028
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 06/03/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 301SD20-0001
CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM
0020 302SD20-0002
BEDDING MATL. AGGR. NO.
TON
818.000
ATTD
0030 302SD20-0027
15" STORM SEWER PIPE LF
386.000
0040 302SD20-0032
18" STORM SEWER PIPE LF
208.000
0050 302SD20-0041
24" STORM SEWER PIPE LF
644.000
0060 302SD20-0239
DROP INLET DI-2A EA
1.000
0070 302SD20-0241
DROP INLET DI-2B,L=4' EA
1.000
0080 302SD20-0242
DROP INLET DI-2B,L=6' EA
1.000
0090 302SD20-0259
DROP INLET DI-2C,L=6' EA
2.000
0100 302SD20-0311
DROP INLET DI-3B,L=4' EA
6.000
0110 302SD20-0312
DROP INLET DI-3B,L=6' EA
1.000
0120 302SD20-0313
DROP INLET DI-3B,L=8' EA
1.000
0130 302SD20-0314
DROP INLET DI-3B,L=10' EA
1.000
0140 302SD20-0315
DROP INLET DI-3B,L=12' EA
1.000
Schedule of Items Page: 3
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0150 302SD20-0317
DROP INLET DI-3B,L=16' EA
1.000
0160 302SD20-0318
DROP INLET DI-3B,L=18' EA
1.000
0170 302SD20-0319
DROP INLET DI-3B,L=20' EA
2.000
0180 302SD20-0320
DROP INLET DI-3BB,L=4' EA
2.000
0190 302SD20-0332
DROP INLET DI-3C,L=12' EA
1.000
0200 302SD20-0446
DROP INLET DI-5 EA
2.000
0210 302SD20-0662
MANHOLE MH-1 OR 2 LF
10.300
0220 302SD20-0663
FRAME & COVER MH-1 EA
3.000
0230 303SD20-0001
REGULAR EXCAVATION CY
5,074.000
0240 303SD20-0007
BORROW EXCAVATION CY
6,774.000
0250 303SD20-0029
SILTATION CONTROL
EXCAVATION
CY
584.000
0260 303SD20-0030
INLET PROTECTION TYPE A EA
5.000
0270 303SD20-0031
INLET PROTECTION TYPE B EA
32.000
0280 303SD20-0032
GEOTEXTILE FABRIC SY
2,448.000
Schedule of Items Page: 4
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0290 303SD20-0034
TEMP. SILT FENCE TYPE A LF
1,917.000
0300 303SD20-0035
TEMP. SEDIMENT BASIN
EXCAVATION
CY
41.000
0310 305SD20-0005
SELECT MATL. TY. I MIN. CBR-
TON
164.000
0320 306SD20-0001
LIME TON
5.110
0330 309SD20-0010
AGGR. BASE MATL. TY. I NO.
21B
TON
3,965.000
0340 315SD20-0005
ASPHALT CONCRETE TY. IM-
19.0D CONST
TON
1,126.000
0350 315SD20-0008
ASPHALT CONCRETE TY. SM-
9.5D CONST
TON
2,037.000
0360 315SD20-0010
ASPHALT CONCRETE BM-25.0 TON
1,266.000
0370 315SX20-0011
SAW-CUT ASPH CONC
ASPHALT CONCRETE
LF
856.000
0380 316SD20-0030
CONCRETE ENTRANCE
PAVE. 7"
SY
74.000
0390 316SX20-0009
HYDRAULIC CEM. CONC.
STAMPED AND COLORED
SY
306.000
ATTD
0400 414SD20-0010
DRY RIPRAP CL.I 18" TON
11.000
0410 501SD20-0001
UNDERDRAIN UD-1 LF
1,467.000
Schedule of Items Page: 5
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0420 501SD20-0004
UNDERDRAIN UD-4 LF
608.000
0430 501SD20-0009
OUTLET PIPE HDPE LF
156.000
0440 502SD20-0011
CURB, STD. CG-2 LF
722.000
0450 502SD20-0012
CURB, RADIAL CG-2 LF
203.000
0460 502SD20-0022
COMB. CURB & GUTTER,
STD. CG-6
LF
40.000
0470 502SD20-0022
COMB. CURB & GUTTER,
STD. CG-6 18" GUTTER
LF
1,390.000
0480 502SD20-0023
COMB. CURB & GUTTER,
RAD. CG-6
LF
15.000
0490 502SD20-0023
COMB. CURB & GUTTER,
RAD. CG-6 18" GUTTER
LF
560.000
0500 502SD20-0029
ENTRANCE GUTTER CG-9D SY
25.000
0510 502SD20-0056
MEDIAN STRIP MS-1A SY
235.000
0520 502SX20-0004
CURB RAD. CG-3 MODIFIED LF
226.000
0530 504SD20-0002
CG-12 DETECTABLE
WARNING SURFACE
SY
43.000
0540 504SD20-0003
HYDR. CEMENT CONC.
SIDEWALK 4"
SY
1,308.000
Schedule of Items Page: 6
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0550 506SD20-0002
RETAINING WALL RW-3 CY
15.000
0560 507SD20-0027
HIGH VISIBILITY FENCE, 4
FEET
LF
1,055.000
0570 508SD20-0001
OBSCURING ROADWAY UNIT
3.000
0580 508SD20-0002
DEMO. OF PVMT.
COMBINATION
SY
115.000
0590 508SD20-0004
DEMO. OF PAVEMENT
FLEXIBLE
SY
4,268.000
0600 509SD20-0001
FLOWABLE BACKFILL CY
117.680
0610 510SD20-0038
ADJUST EXIST. VALVE & BOX EA
1.000
0620 510SD20-0050
ADJUST EXIST FRAME &
COVER
EA
1.000
0630 510SX20-0026
REMOVE EXIST. DROP INLET
OR MANHOLE
EA
10.000
0640 510SX20-0029
RESET EXIST. LUMINAIRE EA
2.000
0650 510SX20-0039
REMOVE EXIST. PIPE LF
586.000
0660 510SX20-0039
REMOVE EXIST. RETAINING
WALL
LF
7.500
0670 510SX20-0040
REMOVE EXIST. AND
SALVAGE EXIST. LUMINAIRE
EA
1.000
Schedule of Items Page: 7
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0680 510SX20-0040
REMOVE EXIST. AND
SALVAGE TRAFFIC SIGNAL
CONT. CABINET
EA
1.000
0690 510SX20-0040
REMOVE EXIST. AND
SALVAGE TRAFFIC SIGNAL
POLE
EA
1.000
0700 510SX20-0040
REMOVE EXIST. BOLLARDS EA
4.000
0710 510SX20-0040
REMOVE EXIST. LUMINAIRE
ARM
EA
3.000
0720 510SX20-0041
REMOVE EXIST. AND
SALVAGE SIGNAL
EQUIPMENT
LUMP SUM _________._____LUMP SUM
0730 510SX20-0042
RELOCATE EXISTING
LUMINAIRE
EA
2.000
0740 510SX20-0042
RELOCATE EXISTING RRFB
ASSEMBLY
EA
2.000
0750 510SX20-0070
INSTALL SIGN EA
25.000
0760 511SD20-0001
ALLAYING DUST HR
300.000
0770 512SD20-0013
TYPE 3 BARRICADE 8' EA
15.000
0780 512SD20-0014
TEMPORARY SIGN SF
1,047.250
0790 512SD20-0016
TEMPORARY CURB RAMP EA
4.000
Schedule of Items Page: 8
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0800 512SD20-0018
PEDESTRIAN BARRICADE
DEVICE
LF
285.000
0810 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
4,662.000
0820 512SD20-0025
PORT.CHANGEABLE MESS.
SIGN
HR
17,840.000
0830 512SD20-0026
ELECTRONIC ARROW BOARD HR
900.000
0840 512SD20-0027
FLAGGER SERVICE HR
240.000
0850 512SD20-0042
ERADICATE LINEAR PVMT
MRKG
LF
80.000
0860 512SD20-0043
ERADICATE NONLINEAR
PVMT MRKG
SF
136.000
0870 512SD20-0046
TEMP. PVMT MRKG TY. A, 4" LF
10,350.000
0880 512SD20-0050
TEMP. PVMT MRKG TY. A, 24" LF
950.000
0890 512SD20-0062
TEMP. PVMT MRKG TY. D, CL.
III, 6"
LF
80.000
0900 512SD20-0065
TEMP. PVMT MRKG TY. D, CL.
III, 24"
LF
69.000
0910 512SP20-0002
MAINTENANCE OF TRAFFIC
TEMPORARY PEDESTRIAN
WALKWAY
LUMP SUM _________._____LUMP SUM
ATTD
Schedule of Items Page: 9
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0920 512SX20-0019
TRAFFIC CONTROL
TEMPORARY PEDESTRIAN
CROSSING SIGNAL
EA
2.000
ATTD
0930 512SX20-0030
WORK AREA TEMPORARY
AUDIBLE INFORMATION
DEVICE
DAY
5,130.000
ATTD
0940 512SX20-0040
POLICE PATROL UNIFORMED
FLAGGERS
HR
345.000
ATTD
0950 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0960 514SD20-0002
FIELD OFFICE TY.II MO
14.000
0970 515SD20-0004
FLEXIBLE PAVE.PLANING 0"-
2"
SY
12,699.000
0980 515SD20-0005
FLEXIBLE PAVE. PLANING
ABOVE 2"-4"
SY
6,227.000
0990 516SX20-0008
DEMO. OF BLDG. WITH
NESHAP- ACM (PARCEL 002)
D-1
LUMP SUM _________._____LUMP SUM
ATTD
1000 516SX20-0008
DEMO. OF BLDG. WITH
NESHAP- ACM (PARCEL 003)
D-2
LUMP SUM _________._____LUMP SUM
ATTD
1010 516SX20-0009
CLEARING PARCEL NO. 002 LUMP SUM _________._____LUMP SUM
1020 516SX20-0009
CLEARING PARCEL NO. 003 LUMP SUM _________._____LUMP SUM
Schedule of Items Page: 10
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1030 517SD20-0001
CONSTRUCTION SURVEYING
CONSTR.
LUMP SUM _________._____LUMP SUM
1040 520SD20-0002
3/4" WATER SERVICE LINE LF
319.000
1050 520SD20-0014
6" DI WATER MAIN LF
63.000
1060 520SD20-0016
8" DI WATER MAIN LF
1,061.000
1070 520SD20-0089
6" GATE VALVE & BOX EA
3.000
1080 520SD20-0090
8" GATE VALVE & BOX EA
8.000
1090 520SD20-0162
FIRE HYDRANT EA
3.000
1100 520SD20-0170
5/8" WATER METER & BOX EA
3.000
1110 520SD20-0185
8" SANITARY SEWER PIPE
PVC
LF
482.000
1120 520SD20-0266
8" SANITARY DROP
CONNECTION
LF
8.800
1130 520SD20-0272
SANITARY SEWER MANHOLE LF
71.900
1140 520SD20-0274
MANHOLE FRAME & COVER F
& C-1
EA
9.000
1150 521SD20-0001
MAILBOX POST, SINGLE EA
1.000
1160 522SP20-0003
FRIABLE ACM SF
35.000
ATTD
Schedule of Items Page: 11
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1170 522SP20-0004
FRIABLE ACM LF
220.000
ATTD
1180 522SP20-0005
CAT II NF ACM SF
8,100.000
ATTD
1190 602SD20-0004
TOPSOIL CLASS B CY
249.000
1200 603SD20-0002
TEMPORARY SEED LB
488.000
1210 603SD20-0003
REGULAR SEED LB
286.000
1220 603SD20-0004
OVERSEEDING LB
229.000
1230 603SD20-0008
HYDRAULIC EROSION
CONTROL PRODUCT TYPE 2
SY
3,920.000
1240 603SD20-0009
HYDRAULIC EROSION
CONTROL PRODUCT TYPE 3
SY
6,873.000
1250 603SD20-0014
FERTILIZER NITROGEN - N LB
80.000
1260 603SD20-0015
FERTILIZER PHOSPHOROUS
- P
LB
61.000
1270 603SD20-0016
FERTILIZER POTASSIUM - K LB
61.000
1280 604SD20-0001
SOD TURFGRASS SY
2,768.000
1290 605SX20-0011
LANDSCAPE PLANTING BED SY
2,929.000
1300 605SX20-0011
LANDSCAPE SHREDDED
HARDWOOD MULCH
SY
922.000
Schedule of Items Page: 12
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1310 605SX20-0013
LANDSCAPE ISA CERTIFIED
ARBORIST SERVICE
LUMP SUM _________._____LUMP SUM
ATTD
1320 605SX20-0015
LANDSCAPE ROOT PRUNING LF
80.000
ATTD
1330 605SX20-0015
LANDSCAPE TREE
PROTECTION
LF
700.000
1340 605SX20-0018
PLANT OR TREE
PERENNIALS
EA
544.000
1350 605SX20-0018
PLANT OR TREE SHRUBS EA
84.000
1360 605SX20-0019
TREE CANOPY TREES EA
11.000
1370 605SX20-0019
TREE UNDERSTORY TREES EA
17.000
1380 606SD20-0001
ROLLED EROSION CTRL
PRODUCT EC-2 TYPE 1
SY
2,200.000
1390 606SD20-0002
ROLLED EROSION CTRL
PRODUCT EC-2 TYPE 2
SY
47.000
1400 700SD20-0003
REMOVE EXISTING 1 POST
SIGN STRUCTURE
EA
3.000
1410 700SD20-0012
RELOCATE EX. 1 POST GRND
MOUNT SGN PANEL
EA
3.000
1420 700SD20-0034
SIGN POST STP-1, 2", 14
GAUGE
LF
236.000
Schedule of Items Page: 13
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1430 700SD20-0035
SIGN POST STP-1, 2 3/16", 10
GAUGE
LF
18.000
1440 700SD20-0036
SIGN POST STP-1, 2 1/2", 10
GAUGE
LF
112.000
1450 700SD20-0037
SIGN POST STP-1, 2 1/2", 12
GAUGE
LF
236.000
1460 700SD20-0038
CONC. FOUND. STP-1, TY. A EA
38.000
1470 700SD20-0039
CONC. FOUND. STP-1, TY. B
FOUNDATION FOR RFB
EA
8.000
1480 700SD20-0060
ELECTRICAL SERVICE SE-5 EA
2.000
1490 700SD20-0067
PEDESTAL POLE PF-2, 12' EA
4.000
1500 700SD20-0068
CONC. FOUND. PF-8 CY
12.000
1510 700SD20-0069
CONC. FOUND. PF-2 EA
4.000
1520 700SD20-0074
CONC. FOUND. CF-4 EA
1.000
1530 700SD20-0096
SIGNAL MAST ARM POLE MP-
3, TY. E2
EA
1.000
1540 700SD20-0105
MAST ARM 75', CASE 2
LOADING
EA
1.000
1550 700SD20-0107
8/2 CONDUCTOR CABLE LF
25.000
Schedule of Items Page: 14
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1560 700SD20-0112
14/4 CONDUCTOR CABLE LF
200.000
1570 700SD20-0114
14/7 CONDUCTOR CABLE LF
840.000
1580 700SD20-0177
JUNCTION BOX JB-S1 EA
2.000
1590 700SD20-0178
JUNCTION BOX JB-S2 EA
21.000
1600 700SD20-0179
JUNCTION BOX JB-S3 EA
1.000
1610 700SD20-0181
ELECT. SER. GRD.
ELECTRODE 10'
EA
1.000
1620 700SD20-0191
BORED CONDUIT 2" LF
186.000
1630 700SD20-0192
BORED CONDUIT 3" LF
185.000
1640 700SD20-0194
CONDUIT PVC 2" LF
843.000
1650 700SD20-0195
CONDUIT PVC 3" LF
20.000
1660 700SD20-0197
TRENCH EXCAVATION ECI-1 LF
863.000
1670 700SD20-0199
TEST BORE EA
1.000
1680 700SD20-0219
LIGHTING POLE LP-1 35'
MNTG HT
EA
11.000
1690 700SD20-0222
LUMINAIRE ARM 12' EA
8.000
Schedule of Items Page: 15
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1700 700SD20-0224
LUMINAIRE ARM 16' EA
3.000
1710 701SD20-0001
SIGN PANEL SF
318.000
1720 702SD20-0011
FLEXIBLE POST
DELINEATOR, SURFACE
MOUNT
EA
43.000
1730 703SD20-0003
LOCAL CONTROLLER TY. A EA
1.000
1740 703SD20-0007
TRAF. SIG. HEAD SECT. 12"
HVS BACKPLATE
EA
35.000
1750 703SD20-0011
PEDESTRIAN ACTUATION PA-
EA
2.000
1760 703SD20-0014
VIDEO DETECTION CAMERA EA
2.000
1770 703SD20-0015
VIDEO DETECTION CABLE LF
100.000
1780 703SD20-0018
WIRELESS DETECTION
SYSTEM
EA
1.000
1790 703SD20-0022
EVP DETECTION SYSTEM 3-
WAY
EA
1.000
1800 703SD20-0034
HANGER ASSEMBLY SM-3,
ONE WAY
EA
10.000
1810 703SD20-0037
HANGER ASSEMBLY SMB-2,
ONE WAY
EA
2.000
1820 703SD20-0044
REMOVE EXISTING POLE EA
2.000
Schedule of Items Page: 16
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1830 703SD20-0045
REMOVE EXISTING
FOUNDATION
EA
2.000
1840 703SD20-0046
REMOVE EXISTING SIGNAL
HEAD
EA
6.000
1850 703SD20-0047
REMOVE EXISTING
CONTROLLER
EA
1.000
1860 703SD20-0048
REMOVE EXISTING
MANHOLE/JUNCTION BOX
EA
3.000
1870 703SD20-0061
PEDESTRIAN SIGNAL HEAD
SP-9
EA
2.000
1880 704SD20-0006
TYPE B CLASS I PVMT LINE
MRKG 4"
LF
11,914.000
1890 704SD20-0007
TYPE B CLASS I PVMT LINE
MRKG 6"
LF
883.000
1900 704SD20-0008
TYPE B CLASS I PVMT LINE
MRKG 8"
LF
26.000
1910 704SD20-0010
TYPE B CLASS I PVMT LINE
MRKG 24"
LF
241.000
1920 704SD20-0015
TYPE B CLASS II PVMT LINE
MRKG 24"
LF
707.000
1930 704SD20-0036
PVMT MSG. MARK. "ONLY" TY
B, CL II, 6'
EA
2.000
1940 704SD20-0045
PVMT SYMB MRKG THRU
ARROW TY B, CL II
EA
4.000
Schedule of Items Page: 17
Proposal ID: C0000120710C01 6015-144-141, C501
Order No.: A79
Oversight/State Project No.:
Federal Project No.: STP-5144-(130)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1950 704SD20-0048
PVMT SYMB MRKG SGL
TURN ARR. TY B CL II
EA
11.000
1960 704SD20-0051
DBL TURN ARR.THRU/LT OR
RT TY B, CL II
EA
1.000
1970 704SD20-0060
SYMB MRKG LANE
REDUCTION ARR TY B CL II
EA
2.000
1980 704SD20-0087
PVMT SYMB MRKG YIELD 2' X
3' TY B, CL II
EA
32.000
1990 704SD20-0093
MRKG INT'L ACCESSIBILITY
SYMB TY B CL II
EA
3.000
2000 705SD20-0003
CONTROL CENTER CCW-1
TYPE C
EA
1.000
2010 705SX20-0001
LUMINAIRE 150 W TYPE II EA
1.000
ATTD
2020 705SX20-0001
LUMINAIRE 250 W TYPE III EA
10.000
ATTD
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000120710C01
A79
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______BEDDING MATL. AGGR. NO. 57 0.400302SD20-0002
_______REGULAR EXCAVATION 0.290303SD20-0001
_______BORROW EXCAVATION 0.290303SD20-0007
_______SILTATION CONTROL EXCAVATION 0.290303SD20-0029
_______SELECT MATL. TY. I MIN. CBR-30 0.600305SD20-0005
_______AGGR. BASE MATL. TY. I NO. 21B 0.600309SD20-0010
_______ASPHALT CONCRETE TY. IM-19.0D CONST 3.500315SD20-0005
_______ASPHALT CONCRETE TY. SM-9.5D CONST 3.500315SD20-0008
_______ASPHALT CONCRETE BM-25.0 3.500315SD20-0010
_______DRY RIPRAP CL.I 18" 0.400414SD20-0010
_______RETAINING WALL RW-3 1.892506SD20-0002
_______DEMO. OF PVMT. COMBINATION 0.200508SD20-0002
_______DEMO. OF PAVEMENT FLEXIBLE 0.200508SD20-0004
_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0004
_______FLEXIBLE PAVE. PLANING ABOVE 2"-4" 0.160515SD20-0005
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000120710C01
A79
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______SIGN POST STP-1, 2", 14 GAUGE700SD20-0034
_______SIGN POST STP-1, 2 3/16", 10 GAUGE700SD20-0035
_______SIGN POST STP-1, 2 1/2", 10 GAUGE700SD20-0036
_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-0037
_______SIGNAL MAST ARM POLE MP-3, TY. E2700SD20-0096
_______MAST ARM 75', CASE 2 LOADING700SD20-0105
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000120710C01
A79
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPHALT CONCRETE TY. IM-19.0D CONST315SD20-0005
ASPHALT CONCRETE TY. SM-9.5D CONST315SD20-0008
ASPHALT CONCRETE BM-25.0315SD20-0010
Determination of Major Items
1C0000120710C01Contract ID:
ltem Description Item
Number
BORROW EXCAVATION303SD20-0007
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
*CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SECTION 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SECTION 105.14—MAINT. DURING CONSTRUCTION 12-20-24 (SPCN) 2
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN245-000100-01 SECTION 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 3
CN801-000100-00 TRAFFIC SIGNAL AND ITS EQUIPMENT APPROVAL 7-28-25 (SPCN) 5
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 5
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 6
NOTICE TO REMOVE PARKED VEHICLES R-7-12-16_(SPCN) 7
UNIFORMED FLAGGERS R-7-12-16_(SPCN) 7
CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 7
NON-FRIABLE ASBESTOS CONTAINING MATERIALS 4-16-26 (SPCN) 10
*ABATEMENT OF ACM 11-5-18 (SPCN) 10
SUBSTANTIAL COMPLETION 4-16-26 (SPCN) 11
BEDDING MATERIAL AGGREGATE NO. 57 5-5-21 (SPCN) 11
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 12
SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 16
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 43
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 49
SP105-000100-00 INFORMAL PARTNERING R-7-12-16 50
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 52
*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 53
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 55
SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 58
SP108-000100-01 PROG. SCHED. FOR CAT. I PROJECTS 3-21-22 65
*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 80
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 82
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 84
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 89
SP522-00A310-01 DEMO. OF STRUCT - NON-FRIABLE ASBESTOS 10-30-24 95
SP522-00B310-01 ASBESTOS REMOVED - ROAD CONST. DEMO. PROJ. 2-26-25 99
SP703-000110-00 REPLACE LOOP DETECT. 3-16-17 113
*SP705-000100-00 LED LUMINAIRES 7-27-18 114
PUBLIC NOTICE OF PARKING RESTRICTIONS (PLANT MIX) R-7-12-16 120
SEC. 105.06—SUBCONTRACTING (FEDERAL FUNDED PROJECTS) 2-9-17_(SP) 124
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 125
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 129
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 132
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 137
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 138
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 139
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 140
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 141
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 145
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 152
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 154
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 156
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 157
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 158
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 177
TABLE OF CONTENTS FOR PROVISIONS
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 179
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 180
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 184
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 186
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 188
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 189
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 202
TREE REMOVAL TIME OF YEAR RESTRICTION FOR BAT HABITAT 4-14-25 208
SECTION 108.02 – LIMITATION OF OPERATIONS 5-29-26 209
ENVIRONMENTAL AVOIDANCE AREA(S) OUTSIDE OF PROJECT LIMITS 5-14-20 212
TREE PRESERVATION 4-16-26 213
ALLOWABLE DETOUR TIMEFRAME 4-16-26 215
INTEGRALLY COLORED AND STAMPED CONCRETE 8-24-17 216
TEMPORARY AUDIBLE INFORMATION DEVICE (TAID) 1-28-26 221
TEMPORARY PEDESTRIAN CROSSING SIGNAL 3-30-26 223
TEMPORARY PEDESTRIAN WALKWAY 4-20-26 225
NO PLAN ASSEMBLY 226
cn100-000026-09 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0; the Virginia MUTCD version 11.0;
and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
12-11-25 (SPCN)
cn103-000100-01 SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
6-17-25 (SPCN)
cn105-000140-00 SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date (two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
12-20-24 (SPCN)
cn105-000150-00 SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS— The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign.
TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the Department’s OT Cybersecurity Program Manual.
1-30-26 (SPCN)
cn245-000100-01 SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage. Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 deg F and at 125 deg F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for 12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of
Section 245.03(c) of the Specifications.
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage.
Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core.
Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack. Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
1-10-24 (SPCN)
cn801-000100-00 TRAFFIC SIGNAL AND INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT APPROVAL—All network capable devices included in Sections 703, 801, 802, 803, 804, 805, 806, 807, 809, 810, and 811 of the Specifications shall match the approved hardware, firmware, and software versions on the Department’s Operation Technology Critical Infrastructure list in order to be installed. Previously approved devices, firmware, or software, including any revisions, which have been removed from the current list shall not be installed. Devices, firmware, and software shall be submitted for the Engineer’s review for appropriateness and cybersecurity compliance via Department’s Form C-25 (Source of Materials).
The Contractor shall submit the Operations Technology Field Device Security Assessment form to the Engineer for approval before installation of any network capable devices that are not found on the Department’s Operation Technology Critical Infrastructure list, including traffic signal equipment and Intelligent Transportation System (ITS). All proposed devices for use on the Department’s network shall be inspected and reviewed by the Department for compliance with current Commonwealth of Virginia Information Security Standards. This inspection and review process will involve device testing for cybersecurity vulnerabilities overseen by the Department’s Office of Information Security (OIS) and Operations Technology Division (OTD). The Contractor shall be responsible for coordinating with equipment and software suppliers to complete and submit the required security checklist and device samples to the Department for vetting of items that have not been approved.
The Engineer will coordinate the Operations Technology Field Device Security Review with the Department’s Operations Technology Division. The Contractor shall allow 8 months for this review if the device has a cloud component or artificial intelligence. If cloud or artificial intelligence are not involved, then the Contractor should allow for 90 days for review once the initial Operations Technology Field Device Security Assessment form has been submitted.
The Operations Technology Critical Infrastructure list and the Operations Technology Field Device Security Assessment form are located on the Department’s website.
7-28-25 (SPCN)
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
NOTICE TO REMOVE PARKED VEHICLES — Unless otherwise specified elsewhere in the Contract, the Department will furnish upon request, street signs for posting or printed notices for distribution, by the Contractor that notifies residents in residential areas to remove parked vehicles from the roadway prior to the Contractor performing work.
9-21-07; Reissued 7-12-16_(SPCN)
UNIFORMED FLAGGERS - The Contractor shall utilize off-duty uniformed police officers for control of traffic through signalized intersections during periods when the control equipment is non-operational. It is expressly understood that the work under this pay item exceeds the requirements and duties typically associated with flagger service. Off duty police officers will not be required to have VDOT flagger certification to perform this work. Police assisted flagger service will be measured and paid for in hours of in duty service. This price will be full compensation for furnishing uniform officers and all associated costs.
Payment will be made under:
Pay Item Pay Unit Uniformed Flaggers Hours
9-29-08; Reissued 7-12-16_(SPCN)
CONTRACTOR MAINTENANCE OF TEMPORARY MARKINGS – The second, third, and fourth paragraphs of Section 512.03(k)3 of the Specifications will also apply to Sections 512.03(k)1 and 512.03(k)2 of the Specifications.
6-13-17 (SPCN)
ENVIRONMENTAL AVOIDANCE AREAS OUTSIDE OF THE PROJECT LIMITS In accordance with the Special Provision for Environmental Avoidance Areas Outside of the Project Limits, the Contractor shall avoid the following areas:
9-16-19 (SPCN)
NON-FRIABLE ASBESTOS CONTAINING MATERIALS— Structure D-2 (Parcel 003) contains…