About this file

This is a Statement of Work for Stennis Space Center requiring the purchase of specific networking equipment. SSC seeks to procure five Hirschmann Greyhound Managed Industrial Ethernet Switches (Part No. GRS105-6F8F16T SGGY9HHSE2S) and eight Hirschmann SFP-GIG-LX/LC EEC 1000mb Singlemode Modules (Part No. 942 196-002). The ethernet switches feature 6 fiber SFP slots, 24 copper RJ45 ports, dual power supplies, 19-inch rackmount configuration, and operate across a temperature range of -10 to +60 degrees Celsius with HiOS L2S firmware. The SFP modules are gigabit singlemode units rated for 20-kilometer distances with LC connectors and operate between -40 and +85 degrees Celsius.

Performance will take place at Building 3418, Cryo Facility, Stennis Space Center, MS 39529, with a completion timeline of four weeks from award. The statement does not specify pricing terms, response deadlines, or award dates. No set-asides, incumbent contractors, or special contracting considerations are noted in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Hirschmann Greyhound Managed Industrial Ethernet Switch and Singlemode Module, newest first.
File Type Posted
RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

Stennis Space Center (SSC) requires the purchase of Hirschmann Ethernet Switch and Hirschmann SFP Singlemode Module.

2. Characteristics, Scope, and Specs

LINE PART NO. DESCRIPTION QTY.

1 GRS105-6F8F16T

SGGY9HHSE2S

Hirschmann Greyhound Managed Industrial Ethernet Switch, 6 x 1/2.5GE Fiber

SFP

Slots, 24 x 1GE Copper RJ45 Ports, Dual 110-240 VAC Power Supplies, 19“ Rackmount, -10 to +60 deg C, HiOS L2S (Layer 2 Standard) Firmware (Full Model

#GRS105-

6F8F16TSGGY9HHSE2S)

2 942 196-002 Hirschmann SFP-GIG-LX/LC EEC 1000mb (Gigabit) SFP Singlemode (20km) Module, LC, -40 to +85 deg C

3. Place of Performance

Building 3418, Cryo Facility Stennis Space Center, MS 39529

4. Period of Performance 4 weeks ARO

File details come from the government source that posted it. Updated .