Tab 04 SOW and Specs.pdf

PDF 139 KB Posted

Attached to
Battery Enclosure for E1 Test Stand Federal contract opportunity
Solicitation number
80NSSC25905466Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This document is a Statement of Work (SOW) and Battery Storage Locker Specification for NASA Stennis Space Center, detailing requirements for a battery storage locker to house lead batteries. The locker must be an 8'x8'x8' weatherproof (NEMA 3R) structure with specific design parameters, including a 20 psf roof load, >145 mph wind load resistance, and 250 psf floor loading capability. The unit requires white interior and exterior finishes, 3" R13 insulation, and must be designed to be transportable with interior equipment installed.

Key technical specifications include HVAC equipment sufficient to maintain temperatures below 80°F, >2 ground lugs, photocell and wall switch controlled lighting, 4 interior 20A 120VAC receptacles, 1 exterior GFCI receptacle, exit signs with battery backup, a smoke detector, fire alarm panel, exhaust fan, and a hydrogen gas sensor with external alarm connectivity. The locker is intended to accommodate batteries with dimensions of 11"x5"x20" tall and will be delivered to the E1 Test Stand at Stennis Space Center within an 8-10 week delivery timeline. Documentation requirements include engineering drawings and HVAC calculations.

View the file

Other files for this federal contract opportunity

Other files attached to Battery Enclosure for E1 Test Stand, newest first.
File Type Posted
Tab 10 Q_A.pdf PDF
Tab 10 RFQ 80NSSC25905466Q.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW

1. Objectives:

Purchase and deliver a battery storage locker. See attached building specifications for details.

2. Delivery:

Deliver to: E1 Test Stand, B4040, Stennis Space Center MS 39529

3. Delivery Timeline:

8-10 weeks delivery time.

Design:

4 Interior 20A 120VAC Receptacles 1 Exterior GFCI 120VAC Receptacles 1 120VAC EXIT Signs w/Battery Backup 1 Smoke Detector 1 Fire Alarm Panel Exhaust Fan / Vent Hydrogen gas sensor with alarm and external connectivity capability