This document is a Brand Name Justification (BNJ) for the acquisition of Advanced Clustering ACTserv e1408 Servers for the National Aeronautics and Space Administration (NASA) Shared Services Center.

The BNJ states that Advanced Clustering Technologies, Inc. is the only vendor able to provide the required combination of CPU, storage, and memory for these servers, which will replace two older servers. The procurement is vital to maintain NASA's existing equipment and infrastructure, and pursuing an alternate solution would be operationally cost and time prohibitive. The total estimated cost is undisclosed, with a 30-day lead time for delivery. The BNJ justifies the sole-source acquisition of the brand name servers under the authority of FAR 13.106-1(b)(1)(i).

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Clustering ACTserv e1408 Server, newest first.
File Type Posted
SATPC0036992 Tab 10 Open Market RFQ.pdf PDF
SATPC0036992 Tab 10 Open Market RFQ.pdf PDF
SATPC0036992 Tab 04 4 SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 V2.0 3-15-2017

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

NASA SHARED SERVICES CENTER

RECOMMENDATION AND DETERMINATION TO SOLICIT FROM ONE SOURCE

OR BRAND NAME

PICK ONE

Sole Source:

I recommend that NASA, NASA Shared Services Center negotiate with Vendor only for Product being purchased . The total estimated cost of this effort is Enter Dollar amount and the estimated period of performance or lead-time for delivery is Date.

OR

Brand Name Justification:

I recommend that NASA, NASA Shared Services Center negotiate only with vendors who can provide the subject brand name from Advanced Clustering Technologies, Inc. for Advanced Clustering ACTserv e1408 Servers. The total estimated cost of this effort is and the estimated period of performance or lead-time for delivery is 30 days ARO.

This recommendation is for the acquisition of supplies or services determined to be reasonably available from only one source/only one manufacture. Competition is impractical for the following reasons (please answer the questions below):

1. What are the reasons for soliciting only the suggested source/suggested brand name? Please provide the unique characteristics of the items or services along with the supporting rationale and the market research performed to substantiate your reason for the suggested source/brand name.

Advanced Clustering is the only vendor that is able to provide the combination of CPU, Storage, and Memory that is needed for this server. These systems are set to replace two older servers. The requested hardware includes integrated IPMI modules, which will enhance compatibility with the HEASARC database requirements. NASA Goddard Space Flight Center (GSFC) would incur substantial duplication of costs, resources, and time if a brand other than Advanced Clustering Technologies, Inc. was procured due to the effort necessary to: evaluate and source compatible hardware, commit training to new vendor instrument, migrate data information from current infrastructure to new vendor solution, conduct parallel operations of current and new systems until migration to the new system, validate migration completion, and decommission the current systems after the migration effort is completed.

2. What is the impact to the government if another vendor/brand is used? Include any dollar, schedule, or compatibility impacts if possible.

This procurement ensures that the NASA equipment stays operable and calibrated within specification to perform daily work. This procurement is vital to NASA’s past investment. To pursue the evaluation or procurement of an alternate hardware solution would be both operationally cost and time prohibitive.

ADDITIONAL COMMENTS:

Page 2 V2.0 3-15-2017

RESEARCH AST, FIELDS AND PARTICLES

Title

Page 2 V3.0 01/18/2023

****FOR NSSC SAT USE ONLY****

The above justification in pursuant to one of the following (only select one):

- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.101(a)(1), the proposed contract action will be placed on SAM.gov under the authority of FAR 13.106 - 1(b)(1)(i).

- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.101(a)(2), the proposed contraction action was not placed on SAM.gov as oral solicitation will be used to solicit quotation under the authority of FAR 13.106-1(c).

- Recommendation and Determination to Solicit from One Source (RDSS): For open market purchases, pursuant to FAR 5.202(a)(2), the proposed contract action is exempt from publication on SAM.gov because the government would be seriously injured if the Agency complies with the time periods specified in FAR 5.203.

- Brand Name Justification (BNJ): For open market purchases, pursuant to FAR 13.106-1(b)(1)(i), the acquisition of the referenced brand name item is hereby justified. (Under $25,000)

- Brand Name Justification (BNJ): For open market purchases, pursuant to FAR 13.106-1(b)(1)(i), the acquisition of the referenced brand name item is hereby justified. Pursuant to FAR 5.201, any contract action over $25,000 shall be synopsized in the Government wide Point of Entry (GPE) and the brand name justification must be attached.

SEWP/IDIQ Brand Name Justification (BNJ): For schedule/IDIQ purchases, pursuant to FAR 16.505(4)(i)(ii), the acquisition of the referenced brand name item(s) is hereby justified. (under $30,000)

SEWP/IDIQ Brand Name Justification (BNJ): For schedule/IDIQ purchases, pursuant to FAR 16.505(a)(4)(i)(ii)(iii)(A), the acquisition of the referenced brand name item(s) is hereby justified. Any action over $30,000 the brand name shall be posted on the agency website used to solicit offers for orders.

- Limited Source Justification (LSJ) Sole Source: For GSA orders, pursuant to FAR 8.405-6(a)(1)(i)(B), only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized. Action will be performed against GSA Contract ___________________.

- Limited Source Justification (LSJ) Brand Name: For GSA orders, pursuant to FAR 8.405-6(b), the item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.

- Exception to Fair Opportunity (EFO): For SEWP orders or orders placed against other IDIQ contracts, under the authority of the Federal Acquisition Streamlining Act (FASA) and Pursuant to FAR 16.505(b), exemption under FAR 16.505(b)(2) used is based on the following:

(A) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays

(B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized.

(C) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

I hereby accept the above stated recommendation and determine that the circumstances of the contract action deem only one source reasonably available.