SATPC0036330 Tab 04 4 SOW..pdf
PDF 122 KB Posted
- Attached to
- Inficon Leak Detector Federal contract opportunity
- Solicitation number
- 80NSSC24880115Q
About this file
This document is a Statement of Work (SOW) for a requirement by NASA Marshall Space Flight Center for an Inficon UL1000 leak detector to replace an existing unit. The SOW specifies the required characteristics and technical specifications for the leak detector, including detection limits, inlet pressure, pumping speeds, and accessories such as a wireless remote control and calibrated leak standards. The required quantity, part numbers, and place of performance at the NASA Marshall Space Flight Center in Huntsville, Alabama are also detailed. The related federal contract opportunity is a brand name solicitation for the Inficon leak detector, with a 6-week shipping lead time after award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0036330 Tab 10 RFQ Open Market Template.pdf | ||
| SATPC0036330 Tab 06 BNJ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
NASA Marshall Space Flight Center has a requirement for a Inficion Leak Detector to replace an existing Inficion UL1000 leak detector.
2. Characteristics, Scope, and Specs
Qty Description Part #
UL1000 Fab Mobile helium leak detector 100/115 V (± 10%) 50/60 Hz o Detects: Helium, hydrogen o Min. detectable leak rate for helium [mbar·l/s]:
- vacuum mode: < 5 E-12
- sniffing mode: < 5 E-8 o Max. inlet pressure: 15 mbar o Pumping speed in pump-down mode: 30 m³/h @ 60 Hz o Helium pumping speed in ULTRA mode: 2.5 l/s o Test leak TL7 o Dry backing pump 550-101A
UL1000/UL1000 FAB/UL5000 RC1000C Wireless Remote Control Includes o Wireless Transmitter with Connecting Cable to Leak Detector o 4m (13.1ft) Spiral Cable, 3.5in. TFT Color Touchscreen, Audio Alarm, Headphones 551-015
1 Calibrated Leaks 10 -7 atm cc/sec Permeation with KF25 Flange TL7KF25 1 Calibrated Leaks 10-8 atm cc/sec Permeation with KF25 Flange TL8KF25
Calibrated Leaks 10-6 atm cc/sec Stainless Steel Capillary with KF25 Flange TL6KF25
3. Place of Performance NASA Marshall Space Flight Center Martin Road SW Huntsville, AL 35808
4. Period of Performance
Shipping lead time: 6 weeks ARO
File details come from the government source that posted it. Updated .