STATEMENT OF WORK.pdf
PDF 176 KB Posted
- Attached to
- PACKING OF VERY SENSITIVE CRYOGENIC COMPONENTS Federal contract opportunity
- Solicitation number
- 80NSSC247744
About this file
This statement of work outlines support services required for a sole source contract. The selected vendor will provide 0.5 full-time equivalents of packaging and mechanical engineering support over 12 months at NASA Goddard Space Flight Center. Services include packaging and wirebonding of test articles in a cleanroom, assembling 2dMUX arrays with packaging engineers, integrating packages into cryogenic systems for testing, and performing quality checks. The vendor will also provide mechanical engineering design services using CAD software. The total cost of the contract is not to exceed $61,111 and will be awarded on a sole source basis to Teltrum due to their unique expertise with the required skills and project.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements The vendor will support the packaging and wirebonding of test articles in the Observational Cosmology Laboratory (665) cleanroom, work with packaging and integration of engineers in B11 to assemble 2dMUX arrays, and integrate packages in cryogenic systems for testing. They will also provide mechanical engineering support with computer aided design software and drafting of components as needed. They will perform quality checks according to the specifications of the project.
2. Characteristics, Scope, and Specs The vendor will support the “Advancing Readout and Optical Coupling of Large-Format Mid-IR Transition-Edge Sensor Arrays” ROSES/SAT project at an approximate rate of
0.5 FTEs (reference only – over period of performance noted below) and a cost (not to exceed) of $61,111. No travel or procurement is authorized for this task.
3. Place of Performance Goddard Space Flight Center – Building 34 – Rm C258A (packaging cleanroom) and Rm C205 (laboratory) Building 24 – Rm C136 Building 11 – various packaging laboratories
4. Period of Performance 12 months
File details come from the government source that posted it. Updated .