PANELS DRAWING PACKAGE.pdf

PDF 877 KB Posted

Attached to
Panels for Habitat Mock-up Module Federal contract opportunity
Solicitation number
80NSSC20728365Q
Issued by
National Aeronautics and Space Administration Shared Services Center

View the file

Other files for this federal contract opportunity

Other files attached to Panels for Habitat Mock-up Module, newest first.
File Type Posted
SATPC0017531 Tab 10 RFQ FBO.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GESS 3 Contract Quality Management System Form QF-15, GESS 3 Contract Engineering Drawing Package Summary Cover Sheet

QF-15 (12/19/17) VERIFY REVISION LEVEL PRIOR TO USE – UNCONTROLLED WHEN PRINTED Page 1

Drawing Package Title HABITAT MOCKUP MODULE PANEL DRAWING

PACKAGE

Drawing Package Release Date 9/2/2019

Drawing Package Revision -

NASA Project Name (MPVC, BLI2DTF, etc.) HABITAT MOCKUP MODULE

NASA POC KRISTEN BOOMER

KRISTEN.T.BOOMER@NASA.GOV

GESS 3 Task Lead SCOTT LAWYER

SCOTT.R.LAWYER@NASA.GOV

Requested Hardware Delivery Date Click here to enter a date.

Delivery Comments SHIPMENT TO: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION JOHN H.

GLENN RESEARCH CENTER, 21000 BROOKPARK RD., CLEVELAND, OHIO 44135

Hardware Classification Notes

Flight ☐ Click here to enter text.

Development ☒ Click here to enter text.

Prototype ☐ Click here to enter text.

Rework/Repair ☐ Click here to enter text.

Other: Click here to enter text. ☐ Click here to enter text.

Documents Included In Drawing Package Drawings ☒

Inspection Report Format ☐

Process Verification Plan Format ☐

Specifications ☐

Engineering Change Orders ☐

Other Documents ☐

QF-15 (12/19/17) VERIFY REVISION LEVEL PRIOR TO USE – UNCONTROLLED WHEN PRINTED Page 2

Project Documentation Requirements Processes Additional Comments

Inspection Report ☐ Click here to enter text.

AS9102 Compliant First Article Inspection ☐ Click here to enter text.

100% Inspection ☒ Click here to enter text.

Limited Inspection ☐ Click here to enter text.

No Inspection Required ☐ Click here to enter text.

Process Certifications ☐ Click here to enter text.

Material Certifications ☒ Click here to enter text.

Process Verification Plan Completion ☐ Click here to enter text.

Periodic Status Reporting

Weekly ☐ Click here to enter text.

Monthly ☐ Click here to enter text.

Other: Click here to enter text. ☐ Click here to enter text.

Drawing Summary

Item

Drawing Number Drawing Title Revision Release

Date Part or

Assembly Required Quantity

Process Verification

Plan

1 190502MRA1021 HMM 135 DEG

GUSSET PLATE - 08/13/2019 Part 1

N/A

2 190502MRA1022

HMM

PORTHOLE

MONITOR

STRAP

- 08/13/2019 PART 4

3 190502MRA1023

HMM

PORTHOLE

PLATE 1

- 08/13/2019 PART 2

4 190502MRA1024 HMM AUX.

PANEL 1 - 08/05/2019 PART 8

5 190502MRA1025 HMM AUX.

PANEL 2 - 08/05/2019 PART 2

6 190502MRA1026

HMM LIGHT

PANEL

ASSEMBLY

- 09/03/2019 ASSEMBLY 10

7 190502MRA1027 HMM AUX.

PANEL 3 - 08/05/2019 PART 3

QF-15 (12/19/17) VERIFY REVISION LEVEL PRIOR TO USE – UNCONTROLLED WHEN PRINTED Page 3

8 190502MRA1037

HMM

WORKSTATION

TABLETOP AL

- 09/02/2019 PART 3

*Review Final Inspection Drawings to assure fabrication to latest revisions.

Related Engineering Change Orders (ECO’s)

Date ECO Number Related Drawings Description Click here to enter a date. Click here to enter text. Click here to enter text. Click here to enter text.

Click here to enter a date. Click here to enter text. Click here to enter text. Click here to enter text.

*All documents to be reviewed and approved prior to product shipment.

Product Acceptance

Review Signature Description Click here to enter text. Click here to enter text. Click here to enter text.

Click here to enter text. Click here to enter text. Click here to enter text.

QF-15 (12/19/17) VERIFY REVISION LEVEL PRIOR TO USE – UNCONTROLLED WHEN PRINTED Page 4

Notes Click here to enter text.

QF-15 (12/19/17) VERIFY REVISION LEVEL PRIOR TO USE – UNCONTROLLED WHEN PRINTED Page 5

190502 HABITAT MOCKUP MODULE, GESS3 QF-15 GESS 3 Contract Engineering Drawing Package Summary Cover Sheet, PANELS DRAWING PACKAGE
190502MRA1021 REV-, HMM 135DEG GUSSET PLATE
190502MRA1022 REV-, HMM PORTHOLE MONITOR STRAP
190502MRA1023 REV-, HMM PORTHOLE PLATE 1
190502MRA1024 REV-, HMM AUX PANEL 1
190502MRA1025 REV-, HMM AUX PANEL 2
190502MRA1026 REV-, HMM LIGHT PANEL ASSEMBLY
190502MRA1027 REV-, HMM AUX PANEL 3
190502MRA1037 REV-, HMM TABLE TOP ALUMINUM

File details come from the government source that posted it. Updated .