ESD_Specifications_8_6_19.pdf
PDF 12 KB Posted
- Attached to
- NASA LaRC Electrostatic Discharge Benches Federal contract opportunity
- Solicitation number
- 80LARCFYQ708260
About this file
ESD Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications_8_14_19.pdf | ||
| Instructions_for_Vendors.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Electrostatic Discharge Benches for Measurement Systems Laboratory
NASA Langley Research Center (LaRC) needs ninety-three (93) Electrostatic Discharge (ESD) Benches to be delivered Freight on Board (FOB) to NASA Langley Research Center, Hampton Virginia and installed into the Measurement Systems Laboratory (MSL). The benches shall be fully assembled upon delivery and receipt and installed on the first, second and fourth floors of MSL.
The ESD bench shall be furnished in accordance with the following specifications and requirements:
1. Bench shall have an ESD work surface with hydraulic crank or electric height adjustment which allows for minimum working heights of 29 inches to 38 inches.
The color shall be ESD gray laminate with black 3mm pvc edge treatment and blue powder coated frame to match existing benches.
2. The ESD work bench shall have a load capacity of 1000lbs.
3. The bench shall be fully assembled, including all accessories upon delivery.
Charges for assembly shall be included in the price.
4. ESD 12 in x 72 (approximate in size) adjustable shelf shall be included.
5. LED light shall be mounted under the adjustable shelf with minimum brightness of 100 foot candles.
6. ESD bench shall have a power strip (with minimum of 12 outlets) and adjustable mounting rail. This shall be mounted against back of work surface to double as a backstop.
7. ESD bench shall have 4 in, total lock casters (all four wheels)
8. ESD bench shall have 3 drawer units mounted on the right side, each drawer shall be a minimum of 6 inches deep.
9. ESD bench shall have a conductive adjustable bin rail.
10. ESD bench shall have the SCS 724 ESD monitoring system integrated into the workstation.
11. ESD bench must include a minimum warranty of 3 years.
Delivery:
The 93 assembled ESD benches shall be delivered Freight on Board (FOB) and put in place no later than January 30, 2020, ahead of relocation of lab functions and associated personnel.
File details come from the government source that posted it.