3._Statement_of_Work_rev2.pdf

PDF 281 KB Posted

Attached to
Mindrum Microvalves Federal contract opportunity
Solicitation number
80KSC019Q0015
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

3. Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to Mindrum Microvalves, newest first.
File Type Posted
2._Questions_and_Answers_Template.pdf PDF
1._JOFOC_(redacted).pdf PDF
80KSC019Q0015_rev2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA, KENNEDY SPACE CENTER

Tasks for Mindrum Precision

Statement of Work

April 3, 2019

1.0 Background

The Water Analysis and Volatile Extraction (WAVE) fluid subsystem is developing its Protoflight and Flight hardware, the continuation of a testing effort using Mindrum Microvalves and Gland Assemblies for the last five years. The Gland Assemblies interface directly to the Microvalve and WAVE manifold, and are essential in continuation and maturation of the previous testing effort for progression to flight.

Mindrum will perform proof pressure testing and leak testing of the Gland Assemblies to verify workmanship and leak rates of the welded assemblies in time to meet the milestones of the SMD-funded project

2.0 Objectives

Mindrum will use its existing test setup for pressure testing and characterization of six (6) Gland Assemblies up to a maximum of 450 psia. Mindrum will deliver the resulting pressure and leak testing data.

3.0 Tasks

The contractor shall perform each of the following tasks:

1. Revive previous fixture and setup (developed in 2017) for pressure and leak testing of the Mindrum Gland Assemblies up to a maximum of 450 psia

2. Proof pressure test:

a) Six (6) 1/8” Gland Assemblies in the pressure test setup to 450 psia

3. Leak test per Mindrum’s helium leak test procedure, and verify leak rate is < 5x10-9 atm-cc/sec steady state

a) Six (6) 1/8” Gland Assemblies

4.0 Deliverables

1. Deliver test setup diagram

2. Deliver pressure and leak test data for each Gland Assembly

Quote line item 5

3. Deliver four (4) Flight Microvalves (part number 6810) by June 2019

Quote line item 1

4. Deliver eight (8) Upper Internal Pressure Seals (part number 6823) by August 2019

Quote line item 2

5. Deliver eight (8) Lower External Pressure Seals (part number 6824) by August 2019

Quote line item 3

6. Deliver six (6) 1/8” Gland Assemblies (part number 6827) by June 2019

Quote line item 4

NASA, KENNEDY SPACE CENTER

7. Deliver six (6) Platinum Seals (part number 6822) by May 2019

Quote line item 6

9.0 Period of Performance

Delivery within 120 days of award