L1 Series STIS CDRL v2 (Draft).pdf
PDF 2 MB Posted
- Attached to
- Space Weather Next L1 Series Suprathermal Ion Sensor (STIS) Federal contract opportunity
- Solicitation number
- 80GSFC23R0036
About this file
This document outlines contract deliverables requirements for the Space Weather Next L1 Series Suprathermal Ion Sensor instrument. Key deliverables include program management plans, schedules, reviews, analyses, specifications, models, procedures, reports, and software. Deliverables address areas such as systems engineering, environmental testing, performance verification, mission assurance, operations, and integration and testing. Due dates are tied to major project milestones from proposal through launch and operations. Flight and ground support hardware, as well as the associated data, reports, procedures and reviews are within scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| L1 Series STIS SPEC v2 (Draft).pdf | ||
| L1 Series STIS QASP v2 (Draft).pdf | ||
| L1 Series STIS GFP v2 (Draft).pdf | ||
| L1 Series STIS MAR v2 (Draft).pdf | ||
| L1 Series STIS SOW v2 (Draft).pdf | ||
| L1 Series SWIPS MAR (Draft).pdf | ||
| L1 Series STIS SPEC v2 Draft).pdf | ||
| L1 Series SWIPS GFP (Draft).pdf | ||
| L1 Series SWIPS SOW (Draft).pdf | ||
| L1 Series SWIPS QASP (Draft).pdf | ||
| L1 Series SWIPS CDRL (Draft).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: TBD Expiration Date: TBD
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
L1SERIES-STIS-REQ-0014 , Revision - Space Weather Next L1 Series Project, Code 493
Space Weather Next (SW Next) Program
Lagrange (L1) Series Project Suprathermal Ion Sensor (STIS)
Contract Deliverables Requirements List
(CDRL)
U.S. Department of Commerce (DOC) National Oceanic and Atmospheric Administration (NOAA) NOAA Satellite and Information Service (NESDIS) National Aeronautics and Space Administration (NASA)
GSFC SW Next L1 Series CMO
L1 Series Project STIS CDRL L1SERIES-STIS-REQ-0014, Revision -ii Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
Lagrange 1 (L1) Series Project Suprathermal Ion Sensor (STIS)
Contract Deliverables Requirements List (CDRL)
Signature/Approval Page
Matt Glanfield SW Next L1 Series STIS Instrument Engineer NASA Goddard Space Flight Center
Hudson DeLee SW Next L1 Series Instrument Systems Manager
J. Timothy Van Sant Project Manager, SW Next L1 Series iii Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
Preface
This document is under L1 Series Program configuration control. Once this document is approved, L1 Series approved changes are handled in accordance with Class I and Class II change control requirements as described in the L1 Series Configuration Management Procedure, and changes to this document shall be made by complete revision.
In this plan, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.” The terms “may” or “can” denote discretionary privilege or permission; “should” denotes a good practice and is recommended but not required; “will” denotes expected outcome;
and “are/is” denotes descriptive material.
Any questions should be addressed to:
L1 Series Configuration Management Office
NASA/GSFC
Code 493 Greenbelt, MD 20771 iv Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR & CCB/ERB Approval Date)
- Baseline v Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
Table of Contents
1 INTRODUCTION
1.1 DEFINITION OF DUE DATES/MATURITY, DEFINITION OF CATEGORIES, AND
DELIVERY INSTRUCTIONS
1.1.1 Due Date
1.1.2 Maturity
1.1.3 NASA Acceptance Code
1.2 STIS CONTRACT DELIVERABLES REQUIREMENTS LIST (CDRL)
1.3 DATA ITEM DESCRIPTION (DID) OVERVIEW
1.4 DELIVERY INSTRUCTIONS
1.5 CDRL ITEMS OVEVIEW
2 PROGRAM DATA ITEM DESCRIPTIONS
PM-1 PROGRAM MANAGEMENT PLAN
PM-2 WEEKLY STATUS REPORTS AND TELECON MINUTES
PM-3 CONFIGURATION MANAGEMENT PLAN
PM-4 CONFIGURATION CHANGE REQUESTS (CCR) CLASS I
PM-5 PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE
PM-6 RISK MANAGEMENT PLAN
PM-7 NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS
PM-8 CONTRACTOR TASK PLAN
PM-9 DOCUMENT TREE
3 RESOURCE MANAGEMENT
RM-1 MONTHLY AND QUARTERLY FINANCIAL REPORT
RM-2 CONTRACTOR’S WBS DIAGRAM AND DICTIONARY
RM-3 DETAILED SCHEDULES
4 REVIEW DATA ITEM DESCRIPTIONS
RVW-1 SYSTEM DEFINITION REVIEW (SDR) DATA PACKAGE
RVW-2 PRELIMINARY DESIGN REVIEW (PDR) DATA PACKAGE
RVW-3 CRITICAL DESIGN REVIEW (CDR) DATA PACKAGE
RVW-4 PRE-ENVIRONMENTAL REVIEW (PER) DATA PACKAGE
RVW-5 PRE-STORAGE/PRE-SHIP REVIEW (PSR) DATA PACKAGE
RVW-6 SUBSYSTEM REVIEW MINUTES AND ACTION ITEMS
RVW-7 RESPONSES TO REQUEST FOR ACTIONS
RVW-8 SUBCONTRACT AND SUBSYSTEM REVIEW DATA PACKAGES
5 SYSTEMS ENGINEERING DATA ITEM DESCRIPTIONS
SE-1 SYSTEMS ENGINEERING MANAGEMENT PLAN
SE-2 ENGINEERING ANALYSES REPORTS
SE-3 STIS SYSTEM SPECIFICATION
SE-4 DETAILED DESIGN SPECIFICATIONS
SE-5 THERMAL MATH MODEL AND REPORTS
SE-6 STRUCTURAL MATH MODEL AND REPORTS
SE-7 SOLID MATH MODEL
SE-8 INSTRUMENT BLOCK DIAGRAMS, AND APPROVED OR CONTROLLED
DRAWINGS
vi Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
SE-9 SYSTEM PERFORMANCE VERIFICATION PLAN
SE-10 SYSTEM PERFORMANCE VERIFICATION REPORT
SE-11 PERFORMANCE VERIFICATION PROCEDURES
SE-12 ENVIRONMENTAL VERIFICATION SPECIFICATION
SE-13 ENVIRONMENTAL VERIFICATION REPORTS
SE-14 DIGITAL IMAGE AND VIDEO RECORDS
SE-15 INDIVIDUAL TEST PLANS
SE-16 MAGNETIC CONTROL PLAN
SE-17 COMPONENT AND SUBASSEMBLY TEST REPORTS FOR ALL
SUBCONTRACTED ITEMS
SE-18 EMC/EMI COMPATIBILITY PLAN
SE-19 MAINTENANCE, TEST, AND OPERATIONS MANUAL FOR THE STIS
EMULATOR
SE-20 REQUEST FOR USE OF MULTI-MISSION OR PREVIOUSLY DESIGNED,
FABRICATED, OR FLOWN HARDWARE
6 MISSION ASSURANCE AND SAFETY DATA ITEM DESCRIPTIONS
MA 1-1 MISSION ASSURANCE REQUIREMENTS COMPLIANCE MATRIX
MA 1-2 SUPPLIER LIST
MA 2-1 INPUT TO ORBITAL DEBRIS ASSESSMENT REPORT and End of Mission Plan
(EOMP)
MA 3-1 SYSTEM SAFETY PLAN (SSP)
MA 3-2 SAFETY REQUIREMENTS COMPLIANCE CHECKLIST
MA 3-3 OPERATIONS HAZARD ANALYSIS AND HAZARD VERIFICATION
TRACKING LOG
MA 3-4 INSTRUMENT SAFETY ASSESSMENT REPORT
MA 3-5 HAZARDOUS PROCEDURES FOR PAYLOAD I&T AND PRELAUNCH
PROCESSING
MA 3-6 PRE-MISHAP PLAN
MA 4-2 FAILURE MODE, EFFECTS, AND CRITICALITY ANALYSIS, AND
CRITICALITY ITEMS LIST
MA 4-3 FAULT TREE ANALYSIS
MA 4-4 RELIABILITY PREDICTIONS
MA 4-5 LIMITED LIFE ITEMS LIST
MA 4-6 PARTS STRESS ANALYSIS
MA 4-7 WORST-CASE ANALYSES
MA 5-1 SOFTWARE ASSURANCE PLAN
MA 6-1 ELECTROSTATIC DISCHARGE (ESD) CONTROL PLAN
MA 6-2 PRINTED CIRCUIT BOARD (PCB) PROCUREMENT PLAN
MA 6-5 LEAD-FREE CONTROL PLAN (LFCP)
MA 7-1 EEE PARTS CONTROL PLAN
MA 7-2 MASTER EEE PARTS LIST
MA 7-3 RADIATION EFFECTS MITIGATION
MA 7-4 RADIATION SHIELDING AND DOSE ANALYSIS REPORT
MA 8-1 MATERIALS & PROCESSES SELECTION, CONTROL, AND
IMPLEMENTATION PLAN
MA 8-2 MATERIALS USAGE AGREEMENT
vii Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
MA 8-3 MATERIALS IDENTIFICATION AND USAGE LIST
MA 8-4 LIFE TEST PLAN AND FINAL REPORT FOR LUBRICATED MECHANISMS . 75
MA 8-5 ADDITIVE MANUFACTURING CONTROL PLAN (AMCP)
MA 8-6 AM PRODUCTION PLAN (PPP)
MA 9-1 CONTAMINATION CONTROL PLAN
MA 9-2 FOREIGN OBJECT DEBRIS PROGRAM
MA 11-1 GIDEP ALERTS/NASA ADVISORY DISPOSITIONS
MA 11-2 INITIATING GIDEP ALERTS
MA 12-1 END ITEM ACCEPTANCE DATA PACKAGE
7 OPERATIONS DATA ITEM DESCRIPTIONS
OPS-1 FLIGHT TELEMETRY AND COMMAND DATABASE
OPS-2 FLIGHT TELEMETRY AND COMMAND HANDBOOK
OPS-3 OPERATIONS HANDBOOK
OPS-4 GROUND PROCESSING ALGORITHMS TEST AND VALIDATION PLAN
OPS-5 GROUND PROCESSING ALGORITHM DOCUMENT
OPS-6 GROUND SOFTWARE ACCEPTANCE PLAN INPUT
OPS-7 TREND ANALYSIS PLAN AND DATA REPORTS
OPS-8 ON-SITE DATA ANALYSIS REPORTS
OPS-9 MASS PROPERTIES AND POWER REPORT
OPS-10 STIS PACKETIZED DATA
OPS-11 INSTRUMENT OPERATIONS CONFIGURABLE ITEMS
8 SOFTWARE DATA ITEM DESCRIPTIONS
SW-1 SOFTWARE MANAGEMENT PLAN
SW-2 SOFTWARE DELIVERY PACKAGES
9 INTEGRATION AND TEST DATA ITEM DESCRIPTIONS
I&T-1 TRANSPORTATION, HANDLING PLAN AND PROCEDURES
I&T-2 POST LAUNCH TEST REPORTS
I&T-3 OBSERVATORY LEVEL TEST PROCEDURES
I&T-4 OBSERVATORY LEVEL TEST REPORT
I&T-5 CALIBRATION PROGRAM PLAN
I&T-6 CALIBRATION DATA BOOKS
10 FPGA DATA ITEM DELIVERABLE
FW-1 FPGA DEVELOPMENT PLAN
FW-2 FPGA DESIGN DATA PACKAGE
11 STIS HARDWARE/SOFTWARE DELIVERABLE ITEMS
APPENDIX A ABBREVIATIONS AND ACRONYMS
APPENDIX B RECOMMENDED OPERATING PROCEDURES (ROPS) TEMPLATE 108
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
1 INTRODUCTION
This Space Weather Next (SW Next) Lagrange 1 (L1) Series (L1 Series) Instrument Contract Deliverables Requirements List (CDRL) document defines the requirements for deliverable items to be provided by the L1 Series Suprathermal Ion Sensor (STIS) contractor. All data shall be prepared, maintained/updated, and delivered to the Government in accordance with the requirements specified in the governing contract, delivery order, Statement of Work (SOW), Mission Assurance Requirements (MAR), and this CDRL and its associated Data Item Descriptions (DIDs).
1.1 DEFINITION OF DUE DATES/MATURITY, DEFINITION OF CATEGORIES,
AND DELIVERY INSTRUCTIONS
The following definitions apply to the "Delivery" column in Error! Reference source not found.
1.1.1 Due Date
a. Proposal: Items that are provided with the proposal.
b. CDR, PER, etc.: Critical Design Review, Pre-Environmental Review, Pre-Ship Review, etc.
c. As Generated: After each initial edition, revision, addition, etc. Monthly: Monthly by the 15th of each month or as required or as modified by CO
d. Weekly: Weekly status reports by Tuesday close of business or as modified by Contracting Officer (CO)
e. L: Launch Date
f. DACA: Days after contract award
g. MACA: Months after contract award
Unless otherwise noted, the data in the due date column titled "days" are to be interpreted as calendar days.
1.1.2 Maturity
a. Preliminary: The initial submission of an item. To be completed with available information as of the time of preparation for the due date.
b. Update: The best up-to-date information available at the time.
c. Final: The complete thorough submission of an item for approval, review, or information. This does not preclude updating later.
1.1.3 NASA Acceptance Code
A Approval: Documents in this category require approval by the Goddard Space Flight Center (GSFC) Contracting Officer’s Representative (COR) prior to use by the contractor. If the Government disapproves, the requirement for resubmission by the Contractor shall be as specified by the Government Contracting Officer. Normally, the requirement for resubmission will be within 30 days of receiving the Government’s comments. If the Government does not provide comments in the prescribed time, the Contractor may proceed with the associated work after notifying the Government of the intention to proceed.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
R Review: Documents in this category require delivery to the Government prior to use and within the time period specified in the "Due Date" column of this document.
They are subject to evaluation by the Government or its designated representatives to determine Contractor effectiveness in meeting contract objectives. Following submission, the Contractor may proceed with the associated work. Starting when the Government receives the document, the Government Contracting Officer may provide written (electronic) comments within 21 calendar days. When the Government identifies a deficiency, the Contractor shall re-submit within 30 calendar days of receiving Government comments (3 days for Spacecraft-level test and calibration/validation procedures) or provide a plan within 7 calendar days (1 day for test calibration/ validation procedures), as specified by the Government Contracting Officer, for approval by the Government to close the deficiency.
I Information: Data in this category require delivery to the Government within the time period specified in the “Due Date” column of the STIS Contract Deliverables Requirements List for the purpose of determining current program status, progress, and future planning requirements. The Government Contracting Officer may provide written (electronic) comments within 21 calendar days to identify errors and omissions, and the Contractor shall make the corrections and re-submit as specified by the Government Contracting Officer. The Contractor shall address Government comments in the next version delivered, or in a revised version if it is the final delivery
1.2 STIS CONTRACT DELIVERABLES REQUIREMENTS LIST (CDRL)
Items with an “As Generated” due date that are critical to schedule, performance, or interface shall be transmitted to GSFC by within 48 hours of generation.
Any updates to items of “Final” maturity shall require the same "approval/review" process as was required for the previous submissions.
All Data items shall be delivered in electronic format to a GSFC L1 Series specified web portal unless otherwise noted in the STIS Contract Deliverables Requirements List.
Individual CDRL items may be combined with other CDRL items to increase documentation efficiency if the content and requirements of the CDRL items are satisfied.
Electronic deliverables shall be delivered in the following formats unless otherwise approved by the government:
a. Text Documents: PDF (searchable) or MS Word
b. Presentations: PDF (searchable) or PowerPoint
c. Spreadsheets: Microsoft Excel
d. Database: Delimited ASCII files accompanied with database schema document defining tables and entries.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
e. Schedules: MS Project
f. Schematics and Drawings: PDF
g. Photographs: JPEG or current industry standard.
h. Video: Any readily available open standard (e.g., AVI, MPEG)
1.3 DATA ITEM DESCRIPTION (DID) OVERVIEW
Each CDRL item is defined by a corresponding DID. The DID includes the title, number, SOW reference, purpose, applicable documents, and required preparation information.
Much of the required information specified in the DIDs may already exist in the Contractor’s documentation. In those cases, existing documents and formats should be used if they meet the intent of the DID requirements. If so, a notation shall be supplied in the deliverable which indicates where in the Contractor’s document the information that satisfies the requirement can be found.
1.4 DELIVERY INSTRUCTIONS
a. The Contractor shall deliver each CDRL item via the media indicated below in accordance with the schedule and any special instructions indicated in Table 2 and/or the corresponding DID, and in accordance with the contract or mission-specific Delivery Order (DO) requirements and provisions.
b. All CDRL items shall be delivered electronically (one electronic copy for each CDRL item) to an electronic library designated by the Government. If all or a portion of a CDRL item is not well suited for electronic delivery, the item may be delivered via hard copy upon mutual agreement between the Contractor and the Government.
c. Upon submitting each CDRL item, the Contractor shall notify via email the Government Contracting Officer (CO), the CO Representative, and the Data Management Office.
1.5 CDRL ITEMS OVEVIEW
Table 1 provides a list of CDRL item categories as follows:
a. Item # An alpha-numeric identifier for each CDRL item category and its respective DID.
The alpha descriptor is based on the subject matter of the deliverable:
Table 1 Alpha-numeric identifiers for each CDRL
PM Program Management RM Resource Management
RVW Reviews SE Systems Engineering MA Mission Assurance and Safety OPS Operations SW Software I&T Integration and Test FW FPGA Development Plan
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
b. Requirements Reference: The reference indicates the section of the L1 Series Instrument SOW, IMAR, and/or Instrument Requirements Specification (SPEC) where the CDRL item is called out.
c. Title (self-explanatory)
d. Delivery: The contract baseline schedule of delivery for the CDRL item. Many of the dates are referenced to reviews or other milestones. Unless stated otherwise, days are calendar days.
e. Flight Model: This column describes if a deliverable is required for the first flight model (FM1), the second flight model (FM2), or both flight models.
f. Purpose: The purpose of the CDRL item submission (i.e., The Government’s role following receipt of a CDRL item) is based on the definitions below. The designation for an item applies to all submissions (e.g., preliminary/initial, update, final) of that item unless noted otherwise. UAR indicates Update as Required with the approval letter indicated in the parenthetical. An A, R, or I indicate the delivery is required, with the Government’s role following a receipt as indicated.
Table 2 L1 Series STIS Contract Deliverables Requirements List (CDRL)
CRDL No. SOW Title Delivery Flight Model
Purpose
PM-1 4.1. Program Management Plan Preliminary: 30 DACA
Final: PDR+14 days Both R
PM-2 4.1
Weekly Status Reports and
Telecon Minutes Weekly Both I
PM-3 4.4.1
Configuration Management
Plan Preliminary: 15 DACA Final: PDR + 14 days
FMI A
PM-4 4.4.1
Configuration Change
Requests (CCR) Class I As generated Both A
PM-5
4.1
4.5.9 Program Management
Status Review Data Package Bi-monthly Both I
PM-6
4.1 4.7
Risk Management Plan Preliminary: 30 DACA Final: PDR + 14 days
FM-1 R
PM-7 4.2
NASA Property in the
Custody of the Contractors
Per Contract Clause G.6 Oct. 31, of each contract year for prior year.
Both R
PM-8 4 Contractor Task Plan
Per Contract Clause H.8 (only required once a special study is requested/awarded)
Both R
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
PM-9 4.1 Document Tree Preliminary: PDR
Final: CDR Both R
RM-1 4.5
Monthly and Quarterly
Financial Report
Per Contract Clause B.3 (no later than the 15th calendar day or each month)
Both R
RM-2 4.2
Contractor’s WBS Diagram and Dictionary
Draft: With the proposal Final: 15 DACA
Updates: As generated Both A
RM-3
4.4.1 4.6
Detailed Schedules
Preliminary: 15 DACA Monthly Updates by the
15th of each month Baseline: Submission includes PCM list NLT 90 days after ATP
Both I
I
RVW-1
4.5.4.1
System Definition Review
(SDR) Data Package
Preliminary:
SDR/SRR –14 days
Update:
SDR/SRR – 7 days
Final:
NLT SDR/SRR review – 2 days
FM-1 R
RVW-2 4.5.4.2
Preliminary Design Review
(PDR) Data Package
Preliminary:
PDR– 14 days
Final:
NLT PDR review – 2 days
Both R
RVW-3 4.5.4.3
Critical Design Review (CDR) Data Package
Preliminary:
CDR – 14 days
Final:
NLT CDR review – 2 days
Both R
RVW-4 4.5.4.4
Pre-Environmental Review
(PER) Data Package
Preliminary:
PER Dry Run– 7 days
Final:
PER
RVW-5
4.5.4.5
Pre-Storage/Pre-Ship
Review (PSR) Data Package
Preliminary:
PSR Dry Run – 7 days
Final:
PSR
RVW-6
4.5.3
Subsystem Review Minutes and Action Items
Preliminary:
2 days after review
Final:
14 days after review
A
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
RVW-7 4.1
Responses to Request for
Actions
Preliminary:
30 days after assigned
Updates: As agreed Both
R
RVW-8
4.5.9 Subcontract and Subsystem
Review Data Packages Final: Review Both R
SE-1 5.1
Systems Engineering
Management Plan Preliminary: 30 DACA Final: PDR – 30 days
FM1 R
SE-2
5.1 5.6
Engineering Analyses Reports
As generated Both R
SE-3
5.1 6.1
STIS System Specification Preliminary: SDR – 14 days Final: SDR
FM1
A A
SE-4
6.1 6.3
Detailed Design Specifications
Preliminary: Applicable subsystem PDR
Final: Applicable subsystem CDR
Both R R
SE-5 6.3.2.2
Thermal Math Model and
Reports
Preliminary: PDR Update: CDR, FM1 PER, FM1 PSR, and as generated
FM1
R R
SE-6 6.3.2.2
Structural Math Model and
Reports
Preliminary: PDR Update: CDR, PER, PSR, and as generated
FM1
R R
SE-7 6.3.2.2 Solid Math Model Preliminary: PDR
Update: CDR, FM1 PER, FM1 PSR, and as generated
FM1
R
SE-8
4.4
6.1.1
Instrument Block Diagrams, And Approved Or
Controlled Drawings
Preliminary: PDR Final: PSR
Update: CDR
FM1
R R
SE-9
5.1
6.3.2 System Performance
Verification Plan
Preliminary: With Proposal Final: PDR
Update: SDR/SRR
SE-10
5.1
6.3.2 System Performance Verification Report
Preliminary: PSR – 30 days Final: PSR
Both
SE-11
6.3.2 Performance Verification
Procedures 30 Days prior to use Both A
SE-12
Environmental Verification
Specification
Preliminary: PDR Final: CDR – 14 days Update: As Required
Both A
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
SE-13 5.1
Environmental Verification
Reports
Initial assessment:
1 day after test
Preliminary: 5 days after test
Final: 30 days after Test
R
SE-14
4.4.1 6.1
Digital Image and Video Records
Preliminary: PER Final: PSR
Update: As requested by government
Both I I I
SE-15
4.5.4.4 6.5.4
Individual Test Plans Preliminary: CDR
Final: 90 days before Test Both A
SE-16 6.1 Magnetic Control Plan Preliminary: PDR
Final: CDR
FM1
R R
SE-17
6.2
Component and Subassembly Test Reports for all Subcontracted Items
As generated Maintained on site
Both I
SE-18 7.1
EMC/EMI Compatibility
Plan Preliminary: PDR
Final: CDR
FM1
R R
SE-19 7.1.2
Maintenance, Test, and
Operations Manual for the STIS Emulator
Final: With Delivery of
STISE
FM1 R
SE-20
6.1 6.2
Request for Use of Multi- Mission or Previously
Designed, Fabricated, or Flown Hardware
Preliminary: 60 DACA Final: SDR/SRR + 60 days
FM1
R R
MA 1-1 8
Mission Assurance
Requirements Compliance Matrix
Preliminary: With proposal Final: 15 DACA
FM1
I A
MA 1-2 8 Supplier List Initial: 60 DACA
Updates: As updated by Contractor
Both I
MA 2-1 8
Input to Orbital Debris Assessment Report (ODAR) and End of Mission Plan
(EOMP)
Preliminary ODAR: 15 days prior to mission PDR Interim ODAR and Draft EOMP: 60 days prior to mission CDR Final: 90 days prior to
Instrument PSR
Both I I I
MA 3-1 8 System Safety Plan (SSPP) Preliminary: /SRR
Final: 45 days prior to PDR Both
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
Updates: 30 days prior to implementation
A
MA 3-2 8
Safety Requirements
Compliance Checklist
Preliminary: 45 days prior to PDR
Final: 45 days prior to CDR Updates: 45 days prior to
Implementation
Both A A A
MA 3-3 8
Operations Hazard Analysis (OHA) and Hazard
Verification Tracking Tool
(HVTL)
Final OHA and HVTL: 45 days prior to first use
FM1 A
MA 3-4 8
Instrument Safety
Assessment Report (ISAR)
Preliminary: 30 days prior to instrument PDR
Intermediate: 30 days prior to instrument CDR
Final: 30 days prior to instrument PDR
MA 3-5
6.5
Hazardous Procedures for Payload I&T and Prelaunch
Processing
I&T Hazardous Procedures: 7 days prior to first use Launch Range Hazardous Procedures: 65 days prior to first use
Both R
MA 3-6 8 Pre-Mishap Plan
Preliminary:
45 days prior to SSR
Final:
45 days prior to CDR
Updates:
45 days prior to PDR
MA 4-2 8
Failure Mode, Effects, and Criticality Analysis
(FMECA) and Criticality Items List (CIL)
Preliminary:
30 days prior to PDR
Update:
30 days prior to CDR and each subsequent milestone review leading to LRR
Both
MA 4-3 Fault Tree Analysis
Preliminary: 30 days prior to PDR
Final: 30 days prior to CDR Updates: 30 days after identification of updates or changes
Both R R R
MA 4-4 8 Reliability Predictions Preliminary: PDR
Final: CDR
FM1
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
MA 4-5 8 Limited Life Items List
Draft: 30 days prior to PDR Preliminary: 30 days prior to CDR Updates: 30 days of changes
FM1
R R R
MA 4-6
7.1
Parts Stress Analysis
Draft: 30 days prior to PDR Final: 30 days prior to CDR
Revisions: 30 after identification
FM1
A A A
MA 4-7
7.1
Worst-case Analyses 30 days prior to CDR
Revisions within 30 days after identification
FM1 R
MA 5-1 8
Software Assurance Plan
Preliminary: 30 days prior to SRR
Final: 15 days prior to PDR Updates: 30 days prior to implementation
FM1
I I
MA 6-1
7.1
Electrostatic Discharge Control (ESD) Plan
30 days prior to PDR FM1 I
MA 6-2
7.1
Printed Circuit Board (PCB) Procurement Plan
Preliminary: 30 days prior to CDR
Changes: 14 days prior to manufacturing
MA 6-5
7.1
Lead-Free Control Plan 60 DACA FM1 I
MA 7-1
7.1
EEE Parts Control Plan 30 DACA FM1 I
MA 7-2
7.1
Master EEE Parts List
EEE parts to the Parts Control Board prior to inclusion Updates prior to inclusion
Both A
MA 7-3
7.1
Radiation Effects Mitigation 60 DACA FM1 A
MA 7-4
7.1
Radiation Shielding and Dose Analysis Report
Preliminary: PDR Final: CDR
FM1 R
MA 8-1 8
Materials & Processes Selection, Control, and Implementation Plan
(MPCIP)
14 days prior to SRR 30 days prior to PDR 30 days prior to CDR
MA 8-2 8 Materials Usage Agreement 30 days prior to CDR Both A
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
New or revised after CRD:
30 days after their identification
MA 8-3 8
Materials Identification and
Usage List (MIUL)
Preliminary:
30 days prior to PDR
Final:
30 days prior to CDR
Updates within 30 days after identification
As-built MIUL 30 days prior to PSR
Both
R A A A
MA 8-4 8
Life Test Plan and Final Report for Lubricated
Mechanisms
30 days prior to PDR 30 days after acceptance test completion Both
A I
MA 8-5 8
Additive Manufacturing Control Plan (AMCP)
14 days prior to SRR 30 days prior to PDR 30 days prior to CDR
FM1
I A A
MA 8-6 8 AM Production Plan (PPP) 30 days prior to CDR
30 days prior to AMRR
FM1
I A
MA 9-1 8 Contamination Control Plan
Preliminary: 30 days before
PDR
Final: 30 days before CDR Final thermal vacuum bakeout results: within 30 days of completion
Contamination Certificate of compliance with EIADP
Both
R
MA 9-2 8
Foreign Object Debris Prevention and Control
30 days prior to PDR FM1 R
MA 11-1 8
GIDEP Alerts/NASA Advisory Dispositions
Disposition of existing Alerts within 30 days of identification Disposition of new Alerts within 30 days of Alert release
MA 11-2 8 Initiating GIDEP Alerts Within 30 days of identification Both R
MA 12-1 8
End Item Acceptance Data
Package
Preliminary: 30 days prior to PSR
Final: 30 days prior to End Item delivery
Updates: 30 days after identification
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
OPS-1 6.5
Flight Telemetry and Command Database
Baseline: PER of FM1 Final: PSR
FM1
R R
OPS-2 6.5
Flight Telemetry and Command Handbook
Preliminary: PDR Final: PSR
Updates: As required
R
OPS-3 6.5 Operations Handbook Preliminary: PER
Final: PSR
FM1
A A
OPS-4 6.5
Ground Processing
Algorithms Test and Validation Plan
Preliminary: PDR Final: PSR - 3 months
A A
OPS-5 6.5
Ground Processing
Algorithm Document
Preliminary: PDR Final: PSR -3 months
A A
OPS-6 6.5
Ground Software
Acceptance Plan Input Preliminary: CDR
Final: PSR - 6 months
FM1
R R
OPS7 6.5
Trend Analysis Plan Trend Analysis Data
Reports
Preliminary: PDR Final:
CDR as generated
R
OPS-8 6.5
On-site Data Analysis
Reports As generated Both R
OPS-9 6.5
Mass Properties and Power
Report Monthly NLT 15th of each month
FM1 I
OPS-10 6.5 STIS Packetized Data As generated Both I
OPS-11 6.5
Instrument Operations
Configurable Items
Preliminary: 30 days prior to launch
Updates: As needed Both
R R
SW-1 6.5 Software Management Plan
Preliminary:
30 DACA
Final:
SW Acceptance Review
Update:
PDR, CDR, TRR
A A
SW-2 6.5
Software Delivery
Packages
Preliminary: PER Final: PSR
Updates: At major revision releases
Both R
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
CRDL No. SOW Title Delivery Flight Model
Purpose
I&T-1 6.4 & 6.5 Transportation, Handling
Plan and Procedures Preliminary: PDR
Final: CDR Both R
I&T-2 6.4 & 6.5 Post Launch Test Reports Preliminary: 2 weeks after test Final: 2 months after test
Both R
I&T-3 6.4 & 6.5 Observatory Level Test
Procedures Preliminary: PER
Final: PSR Both R
I&T-4 6.4 & 6.5 Observatory Level Test
Report Observatory PSR Both R
I&T-5 6.3.3 Calibration Program Plan Preliminary: SDR/SRR
Final: CDR Update: PDR
Both A A A
I&T-6 6.3.3 Calibration Data Books Final: PSR of each Model Both R
FW-1 6.2.1 FPGA Development Plan Preliminary: SRR/SDR
Final: 30 day before PDR
FM1
R R
FW-2 6.2.1
FPGA Design Data Package
(FDDP)
Preliminary:
30 days before PDR
Updates: As generated Final: 30 days before CDR
FM1
R
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
2 PROGRAM DATA ITEM DESCRIPTIONS
PM-1 PROGRAM MANAGEMENT PLAN
Title:
Program Management Plan
CDRL No.
PM-1
Reference:
STIS SOW Section 1.1 Purpose:
Describes how the program is organized and managed. It provides the management structure, its system of operation, responsible lines of communications, and key personnel assignments Preparation Information:
1. The Program Management Plan shall address the overall organization, management approach, and structure of the STIS Program plus its interrelationships with the parent company and the subcontractors, and relationship with the Government.
2. The Program Management Plan shall delineate how the requirements of the Statement of Work (SOW) will be achieved and include a description of planned activities for identifiable SOW requirements.
3. The Program Management Plan shall address interfaces with the Government and with any Government Furnished Equipment (GFE) suppliers.
4. The Program Management Plan shall indicate critical paths, long-lead items and significant milestones down to the lowest level of the WBS.
5. The Program Management Plan shall indicate the need for additional definition of spacecraft and mission information, and when this information is required to avoid schedule slippage.
6. The Program Management Plan shall include graphical displays such as flow diagrams, WBS, logic networks, etc., to reduce verbal descriptive material.
7. The Program Management Plan shall provide an organizational chart(s) and sufficient supplemental narrative to describe fully the organization proposed for carrying out the program showing inter- relationships of technical management, business management, and subcontract management, from lower level through intermediate management to top-level management with detailed explanation of:
a. The authority of the STIS Program Manager relative to other ongoing programs and applicable support organizations within the company structure.
Discuss the program manager’s control over essential resources and functions necessary to accomplish the work.
b. How and by whom interdepartmental work will be monitored and the authority of the program manager over interdepartmental work.
c. Process to be followed by the program manager in obtaining decisions beyond his/her authority and in resolving priority conflicts for resources and functions not under the program manager’s direct control such as personnel, finances, and facilities.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
d. The lead program team members with names, functions, and qualifications
8. The Program Management Plan shall provide contractual procedures proposed for the program to effect administrative and engineering changes, describing any differences from existing procedures.
9. The Program Management Plan shall describe management techniques to be employed in minimizing program costs and schedule impacts, including controls to be exercised over subcontractors and suppliers.
10. The Program Management Plan shall describe how issues will be surfaced in a timely manner and at the proper levels.
11. The Program Management Plan shall describe how supply chain performance will be tracked.
12. The Program Management Plan shall discuss and illustrate the proposed STIS Mission Assurance organizational structure, including staffing plans, reporting channels, authority and responsibilities, and management visibility.
13. The Program Management Plan shall discuss whether the technical, test, manufacturing and system safety/quality assurance/ reliability/ configuration management personnel required for this program (as indicated in your proposed labor hours) are presently on payroll and immediately available for this work.
14. The Program Management Plan shall state the number and kind of persons who would have to be hired and plans to obtain them.
15. The Program Management Plan shall describe how the schedules are developed, maintained and updated.
16. The Program Management Plan shall describe how subcontracts will be managed and reviewed and describe the performance milestones of each.
17. The Program Management Plan shall list and describe the planned subsystem reviews.
PM-2 WEEKLY STATUS REPORTS AND TELECON MINUTES
Title:
WEEKLY STATUS REPORTS AND TELECON MINUTES
CDRL No.
PM-2
Reference:
STIS SOW Section 4.5.8 Purpose:
Contract status evaluation.
Preparation Information:
1. The Weekly Status Report shall indicate the status of the contract as of close of business the preceding Friday, including a summary of progress made.
2. The Weekly Status Report shall address the work completed during the week against the work planned for the week, and address recovery plans if necessary.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
3. The Weekly Status Report shall include technical progress, including significant accomplishments and milestones reached.
4. The Weekly Status Report shall include problems encountered and proposed corrective action.
5. The Weekly Status Report shall indicate any actual or anticipated slip in schedule.
6. The Weekly Status Report shall include identification of any Class I or Class II changes.
7. The Weekly Status Report shall detail the work planned for the next week and summarize the work planned for the next month.
8. The Weekly Status Report shall contain Action Item Status for any overdue action items and any action items due in the next two weeks.
9. The Weekly Status Report shall contain status of any open Non-Conformance Reports.
10. The Weekly Status Report shall contain status on any open contract actions, including Special Engineering Analyses.
11. The Weekly Status Report shall contain status on any red risk item.
Note: This weekly report is intended to be timely and informal and should detail the above topics as changes or problems occur.
PM-3 CONFIGURATION MANAGEMENT PLAN
Title:
CONFIGURATION MANAGEMENT PLAN
CDRL No.
PM-3
Reference:
STIS SOW Section 4.4.1 Purpose:
To define the contractor’s configuration management system and provide a means of control for all changes affecting form, fit, or function and any impact on performance, cost or schedule.
Preparation Information:
1. The Configuration Management Plan shall describe the scope, approach, methods, and procedures of the system used to control changes of requirements, design, and any other configuration managed item.
2. The Configuration Management Plan shall describe the organization of the configuration management program and how it relates to the rest of the STIS program.
3. The Configuration Management Plan shall list all tools used for configuration management.
4. The Configuration Management Plan shall use the following product change classifications:
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
a. A change or request for Deviation/Waiver is classified as Class I when it affects one or more of the following factors:
i. Program baseline documentation
ii. Technical requirements contained in the product configuration identification, including the following:
1. Form, fit, or function
2. Performance
3. Power
4. Reliability outside stated requirements
5. Weight, balance, moment of inertia
6. Interface characteristics
7. Hardware and process qualifications
iii. Non-technical contractual provisions
1. Fee
2. Incentives
3. Cost
4. Schedule
5. Guarantees or deliveries
iv. Other factors
1. Government-furnished property (GFP)
2. Safety
3. Electromagnetic characteristics
4. Deliverable operational, test, or maintenance computer programs
5. Compatibility with support equipment
b. A change is classified as Class II when it does not fall within the definition of a Class I change.
PM-4 CONFIGURATION CHANGE REQUESTS (CCR) CLASS I
CONFIGURATION CHANGE REQUESTS (CCR) CLASS I
CDRL No.
PM-4
Reference:
STIS SOW Section 4.4.1 Purpose:
Class I changes are to be used as a vehicle for orderly processing of change requests to appropriate level of approval authority for disposition.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
Preparation Information:
Class I Configuration Change Requests shall document proposed changes impacting form, fit, function, cost, schedules or performance per the Configuration Management Plan or per the Software Configuration Management Plan section of the Software Management Plan.
PM-5 PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE
PROGRAM MANAGEMENT STATUS REVIEW DATA PACKAGE
CDRL No.
PM-5
Reference:
STIS SOW Section 4.5 Purpose:
To summarize the progress since the previous Program Management Status Review.
Preparation Information:
The Program Management Status Review Data Package shall include the following items:
1. Accomplishments since last review, including 20 milestone events depicting critical items of program status for the succeeding two months with a report on the previous two months milestone events
2. Schedule
3. Technical issues and concerns, including summaries of technical progress and descriptions of the current technical issues and concerns
4. Business issues and concerns, including personnel changes
5. Open contract items
6. Open action items
7. Planned effort for next review period
8. Reliability and quality assurance information
9. Mass properties and power summary
10. Software metrics for each Class A, B or C Computer Software Configuration Item (CSCI) including:
a. Number of software requirements and their change status
b. Number of software change requests and problem reports and their status
c. Resource utilization estimates and measurements of memory, CPU and I/O Bandwidth
11. Financial summary including a summary of actuals versus planned manpower
12. Subcontractor status including:
a. Efforts under contract
b. Efforts waiting contract award
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
c. Changes to first tier and sub-tier contractors
d. Change orders, problems, issues
e. Pending subcontractor consent packages
f. Supply chain performance will be tracked using the table below, updated bi-monthly. This includes items 12. a. through 12. e. for subcontracts.
Part Description
Supplier Leadtime
Original Date
(on contract)
Delivery Date
Need date
Slack (days)
Affected Constraint
T ec hn ic al
S ch ed ul e
C on tr ac t
13. A list of actions requested of GSFC management
14. Update of corporate changes, for example: early warning of
a. Restructuring activities (including internal reorganizations)
b. Indirect/direct rate changes
15. Risk assessment including approach for mitigation
16. Any additional data requested by GSFC
PM-6 RISK MANAGEMENT PLAN
Title:
RISK MANAGEMENT PLAN
CDRL No.
PM-6
Reference:
STIS SOW Section 4.1 and 4.7 Purpose:
To describe the methodologies and processes used to identify, analyze, plan, track, control and communicate the contractor’s risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are described and specific risk abatement strategies or contingency planning processes are discussed. “Risk” refers to anything that can prevent a team from meeting the Delivery Order objectives.
Preparation Information:
1. The Risk Management Plan shall document the process the Contractor will follow to manage risk throughout the life cycle of STIS. This includes technical performance, programmatic, cost, and schedule risks.
2. The Risk Management Plan shall provide descriptions of the processes to provide management at all levels with 1) a disciplined system for early identification of
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
technical uncertainties, 2) a disciplined assessment of current program status, and 3) key indicators of mission success.
3. The Risk Management Plan shall describe the basis for taking action to control risk and for measuring the effectiveness of that action.
4. The Risk Management Plan shall be tailored from NPR 8000.4 and cover:
a) Overview of Risk Management Process
b) Process Details
1) Risk identification - The process to determine and define all risks.
2) Risk analysis - The process to convert risk data into decision-making information. This process should include estimating the probability, impact and time frame of the risks, eliminating duplicates and grouping similar risks, and prioritizing them according to consequences.
3) Risk planning - The process to develop mitigation options and decide what to do with the risks.
4) Risk tracking - The process to acquire, compile and report risk status data, including risk indicators and mitigation actions.
Appropriate risk metrics should be identified so that the Government can evaluate the quality of the risk management.
5) Risk control - The process covering decisions to re-plan mitigation, close risks, invoke contingency plans or continue to track risks. The plan should define responsibilities, typical milestones/reviews, and describe the key risk control activities.
6) Communications and documentation - Present in all the above processes, this is the means by which the output of the processes is documented and communicated to all team members.
5. Risk Information Documentation
6. Constraints and De-scope options
7. For the Top Risks, risks having both a high probability and high impact/severity, the plan shall require, the following (see NPR 8000.4):
a) Description of the risk
b) Primary consequence should the undesirable event occur
c) Estimate of probability of occurrence and the fidelity of the estimate
d) Significant cost impacts, given its occurrence
e) Significant schedule impacts, given its occurrence
f) Potential mitigation measure not already taken and the cost to implement them
g) Characterization of the risk as acceptable or unacceptable with rationale
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
PM-7 NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS
Title:
NASA PROPERTY IN THE CUSTODY OF THE CONTRACTORS
CDRL No.
PM-7
Reference:
STIS SOW Section 3.4 Purpose:
For budget, cost, and property control Preparation Information:
The NASA Property in the Custody of the Contractors report shall consist of NASA Form 1018 in accordance with NFS 1845.505-14, the instructions on the form, subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.
PM-8 CONTRACTOR TASK PLAN
CONTRACTOR TASK PLAN
CDRL No.
PM-8
Reference:
STIS SOW Section 3.4 Purpose:
The task plan is the contractor's resources plan for accomplishing the work described in the task order.
Preparation Information:
The Contractor Task Plan shall be prepared in accordance with Contract Clause H.8
PM-9 DOCUMENT TREE
DOCUMENT TREE
CDRL No.
PM-9
Reference:
STIS SOW Section 3.4 Purpose:
For ready reference list of all STIS and GSE documents.
Preparation Information:
1. The document tree shall list all documents for the STIS and separately for the GSE.
2. The document trees shall be organized and identified to serve as a ready reference list.
3. The document tree shall identify documents by name and number.
4. The document tree shall include a brief description defining the scope of each document
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
3 RESOURCE MANAGEMENT
RM-1 MONTHLY AND QUARTERLY FINANCIAL REPORT
Title:
MONTHLY AND QUARTERLY FINANCIAL REPORT
CDRL No.
RM-2
Reference:
STIS SOW Section 4.5 Purpose:
For budget and cost control Preparation Information:
1. The Monthly Financial Report shall be prepared in accordance with NFS 1852.242-73 and NPR 9501.2D, NASA Contractor Financial Management Reporting on NASA Form 533M.
2. The Monthly Financial Report shall be submitted within 15 days of the end of the reporting period.
3. The Quarterly Financial Report shall be prepared in accordance with NFS 1852.242-73 and NPR 9501.D, NASA Contractor Financial Management Reporting on NASA Form 533Q. The report is due 2 weeks prior to the period being reported.
4. At a minimum, the reporting structure shall be in accordance with and to Level 1 of the WBS as set forth in Attachment J.
5. The reporting categories shall include as a minimum:
a. Direct labor by labor category
b. Overhead
c. Fringe Benefits
d. Materials
e. Material Overhead
f. Subcontracts
g. Travel
h. Other Direct Costs
i. Facilities Capital Cost of Money
j. Fee
k. Total Cost-Plus Fee
RM-2 CONTRACTOR’S WBS DIAGRAM AND DICTIONARY
Title:
CONTRACTOR’S WORK BREAKDOWN STRUCTURE DIAGRAM AND
DICTIONARY
CDRL No.
RM-3
Reference:
STIS SOW Section 4.
Purpose:
To facilitate program planning and control and for financial and technical reporting.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
1. The Contractor's Work Breakdown Structure (WBS) Diagram shall document Government accepted changes to the Government WBS with an updated WBS diagram and description of task elements.
2. The Contractor's WBS Diagram shall define all work included in the STIS development life cycle.
3. The Contractor's WBS Diagram shall provide a framework for program work definition to a level of detail consistent with cost, schedule, technical, and risk oversight as desired by contractor's management.
4. The Contractor's WBS Diagram shall contain a companion WBS dictionary that narratively describes the overall structure and content of each individual element of the WBS.
RM-3 DETAILED SCHEDULES
Title:
DETAILED SCHEDULES
CDRL No.
RM-4
Reference:
STIS SOW Section 4.4.1 and 4.6
Purpose:
For understanding and mapping out in detail the most efficient way of melding together all elements necessary for providing the program deliverables by their required delivery times.
Preparation Information:
1. The schedule shall encompass all phases of the program indicating critical path and schedule slack and reserve.
2. The contractor shall establish, implement, and maintain an instrument schedule. Each Flight Model (FM) development and delivery shall be tracked in the schedule.
3. Phase 1 schedules shall include the instrument and GSE design, the Program Reviews, fabrication and test of the Engineering Development Unit (EDU) and GSE.
4. Phase 2 schedules shall include the fabrication, test, calibration, and delivery of the Flight Models (FMs) instruments and their integration to the L1 Series spacecraft.
5. Design schedules shall be detailed by task with expected start and completion dates.
6. Procurement schedules shall be detailed by major items, assembly, or definable subassembly.
7. Procurement schedules shall be subdivided into standard electrical parts, integrated circuits, etc.
8. Fabrication schedules shall be detailed to the mechanical subassembly level and to the electronic board level, and show the expected start and completion dates, as well as substantive in-process milestones.
9. Detailed schedules shall indicate critical paths.
10. Detailed schedules shall indicate slack and reserve.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
4 REVIEW DATA ITEM DESCRIPTIONS
RVW-1 SYSTEM DEFINITION REVIEW (SDR) DATA PACKAGE
Title:
SYSTEM DEFINITION REVIEW (SDR) DATA PACKAGE
CDRL No.
RVW-1
Reference:
STIS SOW Section 4.5.4.1 Purpose:
To evaluate the requirements, requirements flow-down, and the operational concepts and to validate the realism of the functional and performance requirements and their congruence with the system configuration selected to conduct the mission.
Preparation Information:
1. The SDR Data Package shall discuss contractor system level requirements, rationale, and flow- down plans to lower-level requirements.
2. The SDR Data Package shall cover the STIS System Specification and the traceability matrix to applicable government requirements documents.
3. The SDR Data Package shall cover requirements for the STIS instruments (Flight Models), Ground Support Equipment, flight software, ground test software, and processing algorithm.
4. The SDR Data Package shall show how the current concept meets all government specified requirements including interface requirements.
5. The SDR Data Package shall identify any STIS technologies that are below Test Readiness Level (TRL) 6.
RVW-2 PRELIMINARY DESIGN REVIEW (PDR) DATA PACKAGE
PRELIMINARY DESIGN REVIEW (PDR) DATA PACKAGE
CDRL No.
RVW-2
Reference:
STIS SOW Section 4.5.4.2 Purpose:
To demonstrate the Flight Equipment and GSE designs meet the documented requirements.
Preparation Information:
1. The PDR data package shall include Science/Technical Objectives, Requirements, and General Specification.
2. The PDR data package shall include responses to action items from previous reviews, including subsystem PDRs.
3. The PDR data package shall include changes since the last review.
4. The PDR data package shall address system performance budgets and margins.
5. The PDR data package shall include processor resource utilization estimates.
Check the L1 Series CM tool Server at https://ipdtdms.gsfc.nasa.gov/ to verify that this is the correct version prior to use.
6. The PDR data package shall address mass, power, data rate, commands, Electromagnetic Compatibility (EMC) / Electromagnetic Interference (EMI).
7. The PDR data package shall address interface requirements.
8. The PDR data package shall address mechanical/structural design, analyses, and life tests.
9. The PDR data package shall address electrical, thermal, and sensor design and analyses.
10. The PDR data package shall address software requirements, design, and development environment.
11. The PDR data package shall address Ground Support Equipment design and workflow, and describe how each item will be fabricated, tested and certified when needed.
12. The PDR data package shall address design verification, test flow and calibration/test plans.
13. The PDR data package shall address instrument operations.
14. The PDR data package shall address parts selection, and qualification.
15. The PDR data package shall address preliminary Failure Modes Effects Analysis (FMEA)/Failure Modes, Effects, and Criticality Analysis (FMECA); Fault Tree Analysis; and reliability analysis and results.
16. The PDR data package shall address parts stress analysis.
17. The PDR Data Package shall address the list of long lead items, and of items that…
This is the start of the file's text. The full file is on GovTribe.