Attachment_C_-_PACE-PROP-LIST-0028A_08-09-2018.pdf
PDF 576 KB Posted
- Attached to
- Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Propellant Latch Valve Federal contract opportunity
- Solicitation number
- 80GSFC18R0067
About this file
Attachment C - PACE Prop List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_Mod_000001.pdf | ||
| RFP_Cover_Letter_Latch_Valve.pdf | ||
| Attachment_A_-_Statement_of_Work.pdf | ||
| SF33-_Pace_Latch_Valves.pdf | ||
| Exhibit_B_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_B_-_PACE-PROP-SPEC-0080-_06-14-2018.pdf | ||
| Exhibit_A_-_PACE_Latch_Valve_Compliance_Matrix.pdf | ||
| Attachment_D_-_Quality_Assurance_Plan_Cover_Page.pdf | ||
| Enclosure_A_-_Government_QASP_-_Informational_Purposes_Only.pdf | ||
| PACE_Latch_Valve_RFP_Sections_B-M.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: August 9, 2018
Expiration Date: August 9, 2023
Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use
400-FORM-0002 (4/16/2014)
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, Maryland
PACE-PROP-LIST-0028, Revision A
Plankton, Aerosol, Cloud, ocean Ecosystem (PACE), Code 427
PACE Spacecraft Propulsion Latch Valve
Deliverable Items List and Schedule (DILS)
GSFC PACE CMO
08/09/2018
Released https://ipdtdms.gsfc.nasa.gov/
PACE S/C Propellant Latch Valve DILS PACE-PROP-LIST-0028, Revision A ii
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
PACE Spacecraft Component Standard DILS
Signature/Approval Page
Prepared By:
Chris Hoffman
Reviewed By:
Henry Mulkey
Beth Weinstein
Dave Sohl
Approved By:
Kathy McIntyre
Electronic Signatures available online at: https://ipdtdms.gsfc.nasa.gov/ iii
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Preface
This document is under Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Mission configuration control. Changes to this document require prior approval of the PACE
Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the PACE Configuration Management Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
iv
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR & CCB/ERB Approval Date)
Revision - 06/14/2018 Baseline Release following the approval of PACE-CCR-0314
Revision A 08/09/2018 Updated following the approval of PACE-CCR-0402 v
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Table of TBDs/TBRs/TBSs
Action Item
No.
Location Summary Individual/
Organization
Actionee vi
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 PACE Mission Overview
1.4 Related Documentation
1.4.1 Applicable Documents
1.4.2 Reference Documents
2 DELIVERABLES
Appendix A Abbreviations and Acronyms
List of Tables
Table 1. Data Delivery Documentation and Schedule
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
1 INTRODUCTION
1.1 Purpose
This document is the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Propellant Latch
Valve Deliverable Items List and Schedule (DILS).
1.2 Scope
This document lists all of the deliverables for the latch valve, the SOW paragraph number where the deliverable is described further, the type of response required from NASA GSFC, the format of the deliverable, and the schedule for delivery.
1.3 PACE Mission Overview
The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and
Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). The Climate Initiative complements NASA’s implementation of the National Research Council’s Decadal Survey of
Earth Science at NASA, NOAA, and USGS, entitled Earth Science and Applications from
Space: National Imperatives for the Next Decade and Beyond.
PACE is classified as a Category 2 mission, per the criteria in NASA Procedural Requirement
(NPR) 7120.5E, NASA Space Flight Program and Project Management Requirements. The mission classification is C according to NPR 8705.4B, Risk Classification for NASA Payloads.
1.4 Related Documentation
1.4.1 Applicable Documents
PACE-PROP-SOW-0046 PACE Project Propellant Latch Valve Statement of Work
1.4.2 Reference Documents
PACE-PROP-SPEC-0080 PACE Project Propellant Latch Valve Specification
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
2 DELIVERABLES
Description: This provides the Title of the deliverable item.
Reference: This provides the reference back to the pertinent document calling out the deliverable.
Category:
A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting
Officer (CO). In general, documents shall be provided in contractor format as long as required content, as specified in the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Propellant Latch Valve Statement of Work (PACE-PROP-SOW-0046), is addressed. The
NASA GSFC CO reserves the time-limited right of disapproval for each submission.
The time-limited period is two weeks from receipt of documents
R= Review – Items in this category do not require formal NASA GSFC CO approval, but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within 20 working days of receipt.
I = Information – Items in this category are informal and are for information only.
Format: This provides the format for the deliverable. For documents, the following format applies:
E = Electronic – Provide submittal in electronic format to the PACE Project Library, COR, and Contracting Officer. The vendor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Table 1. Data Delivery Documentation and Schedule
Item
Description Reference Category Format
1 Reserved
2 Monthly Status Report SOW 3.2 Fourteen (14) calendar days following the month being reported.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
3 Reserved
4 Notifications SOW 3.3 Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIM’s, and deliveries.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
5 Kick Off Meeting SOW 3.4.1 Thirty (30) calendar days after contract effective date
In person at Contractor
Facility.
Review Required.
6 Kick Off Meeting Package SOW 3.4.1 Seven (7) working days before the meeting
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required
7 Design Conformance Review
(DCR)
SOW 3.4.2 Three (3) months after contract effective date
In person at Contractor
Facility.
Review Required.
8 Design Conformance Review
Presentation Package
SOW 3.4.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
9 Design Conformance Review
Report
SOW 3.4.2 Fourteen (14) calendar days after completion of DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
10 Pre-Environmental Review
(PER) (Option)
SOW 3.4.3 Seven (7) calendar days before start of environmental testing on first Flight Unit
In person at Contractor
Facility.
Review Required.
11 Pre-Environmental Review
Presentation (Option)
SOW 3.4.3 At PER Electronic – Provide submittal in electronic
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
format to the COR and
Contracting Officer.
Review Required.
12 Flight Unit(s) Pre-Ship
Review (PSR)
SOW 3.4.4 Seven (7) calendar days prior to delivery of each
Flight Unit
In person at Contractor
Facility.
Review Required.
13 Flight Unit(s) Pre-Ship
Review Presentation Package
SOW 3.4.4 At PSR Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
14 Flight Unit(s) End Item Data
Package(s) (EIDP)
SOW
3.4.4, 7.5.3, 7.7.1, 7.8.6
With each delivered Flight
Unit and available at PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
15 TIM SOW 3.4.5 As Negotiated In person at Contractor
Facility.
Review Required.
16 Interface Control
Documentation
SOW 4.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
17 Drawing Package SOW 4.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
18 Computer Models SOW 4.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
19 Structural Analysis Report
(Option)
SOW 4.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
20 Structural Finite Element
Model (Option)
SOW 4.5 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
21 Reserved
22 Reserved
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
23 Worst Case Circuit Analysis
Report (Option)
SOW 4.8 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
24 Parts Stress Analysis Report
(Option)
SOW 4.9 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
25 Parts Stress Analysis Criteria if different from EEE-INST-
002 (Option)
SOW 4.9 Twenty-eight (28) calendar days after contract effective date
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
26 Reserved
27 Reliability Analysis Report
(Option)
SOW 4.11 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
28 FMECA Report (Option) SOW 4.12 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
29 Reserved
30 Y Reserved
31 Reserved
32 Reserved
33 Verification Plan (Including
Verification Matrix)
SOW 6.1,
7.5.1
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
34 Individual Verification Test
Plan(s) (if needed)
SOW 6.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
35 Verification Test Procedure(s) SOW 6.2 Twenty-eight (28) calendar days before start of testing and as changes occur.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
36 Verification Test Report(s) SOW 6.3 At PSR Electronic – Provide submittal in electronic
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
format to the COR and
Contracting Officer.
Review Required.
37 Quality Assurance Plan SOW 7.1.1 Twenty-eight (28) calendar days after contract effective date
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
38 Anomaly/Failure Reports SOW 7.1.3 Deliver initial submission within 24 hours of occurrence for information for Major Anomaly.
Deliver notice of a change in status within 24 hours of occurrence for information.
Deliver the proposed closure prior to closure for approval.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
39 Class I Configuration
Management (CM) Changes
SOW 7.1.4 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
40 Class II CM Changes SOW 7.1.4 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
41 Safety/Hazard Controls SOW 7.2 Three (3) working days after Contractor disposition
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
42 Reserved
43 Limited Life Items List
(Option)
SOW 7.3.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
44 Expired Shelf Life Waiver SOW 7.3.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
45 Reserved
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
46 Reserved
47 Alternate Workmanship
Standards
SOW 7.6.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
48 Reserved
49 Reserved
50 EEE Parts Identification List SOW 7.7.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
See
As-Built Parts List SOW 7.7.1 As part of EIDP (DIL #14) Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
51 Reserved
52 Reserved
53 Recertification Plans for Parts
> 7 years old (if applicable)
SOW 7.7.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
54 GIDEP Alert Disposition and
Preparation
SOW 7.7.5 Three (3) working days after Contractor evaluation
Summary in Monthly Status
Report
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
55 Part Failure Reporting SOW 7.7.7 Twenty-four (24) hours after failure determination
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
56 Materials and Processes List SOW
7.8.3, 7.9.3
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
See
As-Built Materials List SOW 7.8.3 As part of EIDP (DILS #14) Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
57 Materials Usage Agreement SOW 7.8.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
See
Materials Certificate of
Compliance
SOW 7.8.6 As part of EIDP (DILS #14) Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
58 List of Atomic Oxygen
Exposed Materials
SOW 7.8.5
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
59 Nondestructive Evaluation
(NDE) Plan
SOW 7.8.5
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
60 Fastener Integrity Control
Plan
SOW 7.8.5
Thirty (30) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
61 List of Critical Fasteners
SOW 7.8.5
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
62 Contamination Control Plan
(Option)
SOW 7.9.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
63 Reserved
64 Reserved
65 Reserved
66 Reserved
67 Latch Valve Flight Unit(s)
Qty: 3
SOW 5.2 12 months after contract effective date
As specified in Clause
GSFC 52.247-94
For Information Purposes.
68 Vendor’s Welding and
Inspection Procedure
SOW 7.8.7 Twenty-one (21) calendar days after DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Appendix A Abbreviations and Acronyms
Abbreviation/
Acronym Definition
A Approve
CCB Configuration Control Board
CCR Configuration Change Request
CM Configuration Management
CO Contracting Officer
COR Contracting Officer's Representative
DCR Design Conformance Review
DILS Deliverable Items List and Schedule
EEE Electrical, Electronic, and Electromechanical
GIDEP Government Industry Data Exchange Program
GSFC Goddard Space Flight Center
I Information
INST Instrument
NASA National Aeronautics and Space Administration
NDE Nondestructive Evaluation
PACE Plankton, Aerosol, Cloud, ocean Ecosystem
PDL Product Design Lead
PER Pre-Environmental Review
PSR Pre-Ship Review
R Review
SCoRe Signature Controlled Request
SOW Statement of Work
TBD To Be Determined
TBR To Be Resolved
TIM Technical Interchange Meeting
File details come from the government source that posted it.